Method of forming a perimeter weighted foundation for wind turbines and the like

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,155,875
App. No.
10/717,629
Granted
Jan 2, 2007
Kind
B2
Abstract

A perimeter weighted foundation has a central pier pedestal and an enlarged base spaced outwardly and extending below the pedestal. The enlarged base includes an outer concentric perimeter wall section with a radially extending, disk-shaped spread section interconnecting the bottom of the pedestal section and the top of the perimeter wall section. The pedestal section includes vertically extending post-tensioning anchor bolts sleeved through substantially the entire height of the cylindrical pedestal in accordance with earlier U.S. Pat. Nos. 5,586,417 and 5,826,387 and the spread section includes two layers of similarly sleeved post-tensioning bolts which extend through the bottom of the pedestal section and into or through the top of the perimeter wall section, thus tying together the enlarged base to the pier pedestal. After the concrete is poured, hardened and cured, the vertical bolts of the pedestal section and the radially extending horizontal bolts in the spread section are post-tensioned to impart a heavy unit compressive loading on the concrete in the pier pedestal and enlarged base. After back filling soil onto the spread section and to the interior of the pedestal section, the foundation is able to withstand high upset forces imparted to the foundation by any large structure supported thereon.

Claims (23)

1. A method of forming a foundation preparatory to mounting a structure base on said foundation, said foundation including a pedestal section and a perimeter wall section and a spread section interconnecting said pedestal section, and said perimeter wall section, said method comprising:

excavating a generally circular or polygon ground pit having outer dimensions slightly greater than dimensions of said perimeter wall section and a height approximately equal to or slightly less than the height of said pedestal section,

excavating a trench generally around an outer perimeter of said ground pit, said trench having outer dimensions substantially equal to the outer dimensions of the ground pit and inner dimensions slightly less than inner dimensions of said perimeter wall section and to a depth slightly less than a height of the perimeter wall section,

pouring concrete into said trench and onto a portion of a base of the ground pit to form said perimeter wall section and said spread section,

backfilling soil on top of the perimeter wall section and the spread section after the concrete thereof has cured,

pouring concrete within the backfilled soil to form the pedestal section, and

backfilling soil within the pedestal section.

2. A method of pouring a foundation as claimed in claim 1 , wherein the concrete for the perimeter wall section is poured between an inner and an outer corrugated metal pipe.

3. A method of pouring a foundation as claimed in claim 2 , wherein the concrete for the pedestal section is poured between another set of inner and outer corrugated metal pipes.

4. A method of pouring a foundation as claimed in claim 1 , wherein at least one layer of radially extending bolts is placed in said spread section to extend between the pedestal section and the perimeter wall section prior to pouring of said concrete.

5. A method of pouring a foundation as claimed in claim 4 , wherein a plurality of concentric circles of tendons are placed on the at least one layer of radially extending bolts.

6. A method of pouring a foundation as claimed in claim 5 , wherein each of the tendons overlap at opposite ends.

7. A method of pouring a foundation as claimed in claim 4 , wherein the at least one layer of radially extending bolts is post-tensioned after the concrete has hardened and cured.

8. A method of pouring a foundation as claimed in claim 1 , wherein a wind tower is placed on top of the pedestal portion.

9. A method of forming a concrete foundation including a pedestal section, a perimeter wall section and a spread section interconnecting a lower end portion of said pedestal section, and an upper end portion of said perimeter wall section, said method comprising:

excavating a ground pit having outer dimensions slightly greater than dimensions of said perimeter wall section and a height approximately equal to or slightly less than the height of said foundation,

excavating a trench generally around an outer perimeter of said ground pit, said trench having outer dimensions substantially equal to the outer dimensions of the perimeter wall section and inner dimensions slightly less than inner dimensions of said perimeter wall section and to a depth slightly less than a height of the perimeter wall section,

pouring concrete into said trench and onto a portion of a base of the ground pit to form said perimeter wall section and said spread section,

backfilling soil on top of the perimeter wall section and the spread section to an inner dimension slightly greater than the outer dimension of a lower portion of the pedestal section after the concrete thereof has cured, and

pouring concrete within the backfilled soil to form the pedestal section.

10. A method of pouring a foundation as claimed in claim 9 , wherein the concrete for the perimeter wall section is poured between an inner and an outer corrugated metal pipe and the concrete for the pedestal section is poured between another set of inner and outer corrugated metal pipes, at least one layer of radially extending bolts is placed in said spread section to extend between the pedestal section and the perimeter wall section prior to pouring of said concrete, a plurality of concentric circles of tendons having overlapping ends placed on the at least one layer of radially extending bolts, said at least one layer of radially extending bolts being post-tensioned after the concrete has hardened and cured.

11. A method of pouring a foundation as claimed in claim 10 including backfilling soil within said inner corrugated metal pipe of said pedestal section.

12. A method of pouring a foundation as claimed in claim 9 including backfilling soil within said pedestal section.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2019
From: HENDERSON, ALLEN P
To: TERRACON CONSULTANTS, INC.
Reel/Frame 049756/0105 →
Continuity (3)
Division 1006799900 · Feb 8, 2002
Continuation 0967128200 · Sep 27, 2000
Related Publication 20040098935A1 · May 27, 2004