IP Library › Granted Patent US 7,209,859
Granted Patent B2
US 7,209,859 · App. 10/090,102 · Granted Apr 24, 2007

Method and apparatus for sequentially collecting and analyzing real time data with interactive monitoring

Assignee: Linxberg Technology, LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,209,859
App. No.
10/090,102
Granted
Apr 24, 2007
Kind
B2
Abstract

A system, comprising a plurality of slave devices collecting real time data from process stations, a master device receiving the collected data from the plurality of slave devices, wherein the master device polls the plurality of slave devices in a predetermined order and an analysis device processing the collected data and producing output data as a function of the collected data.

Claims (43)

1. A method, comprising the steps of:

collecting real time material information from a production line;

analyzing the real time material information to determine a material cost;

collecting real time operator information from the production line;

analyzing the real time operator information to determine an operator cost;

collecting real time equipment information from the production line;

analyzing the real time equipment information to determine an equipment cost;

collecting real time indirect cost information from the production line;

analyzing the real time indirect cost information to determine an indirect cost;

determining an actual production cost as a function of the material cost, the operator cost, the equipment cost and the indirect cost; and

generating cost comparison data as a function of the actual production cost and a scheduled production cost;

wherein the real time equipment information includes equipment failure data, and further comprising the steps of:

transmitting the equipment failure data to a maintenance post;

determining a response time for maintenance personnel to respond to the equipment failure data as a function of the transmitted equipment failure data and a repair time entered by the maintenance personnel in response to the equipment failure data.

2. The method of claim 1 , further comprising the steps of:

determining an actual operation efficiency as a function of the actual production cost and the real time equipment cost; and

generating efficiency comparison data as a function of the actual operation efficiency and a scheduled efficiency.

3. The method of claim 1 , wherein the analyzing of the real time material information step includes a comparison of the real time material information with stored material information.

4. The method of claim 1 , wherein the analyzing of the real time operator information step includes a comparison of the real time operator information with stored operator information.

5. The method of claim 1 , wherein the analyzing of the real time equipment information step includes a comparison of the real time equipment information with stored equipment information.

6. The method of claim 1 , wherein the combining step includes a comparison of the real time information with stored part information.

7. The method of claim 1 , further comprising the steps of:

analyzing the real time equipment information and the real time operator information as a function of time; and

generating a real time operator efficiency of an operator.

8. The method of claim 7 , wherein the real time operator efficiency is generated for at least two operators in a production unit.

9. The method of claim 7 , wherein the real time operator efficiency is generated for at least two operators in a service unit.

10. The method of claim 7 , wherein generating the real time operator efficiency step includes a comparison of the real time operator information with stored operator information to determine a deviation of the operator cost from a scheduled operator.

11. The method of claim 2 , wherein determining the actual operation efficiency step includes an analysis of the material cost, the operator cost, and the equipment cost.

12. The method of claim 11 , wherein determining the actual operation efficiency step further includes an analysis of an energy cost.

13. The method of claim 11 , wherein the material cost is a function of the operator cost and the equipment cost.

14. The method of claim 11 , wherein the operator cost is a function of the material cost and the equipment cost.

15. The method of claim 11 , wherein the equipment cost is a function of the material cost and the operator cost.

16. A method, comprising the steps of:

collecting real time operator information;

collecting real time equipment information;

analyzing the operator information and the equipment information as a function of time; and

generating a productivity report based on the time analyzed operator information and equipment information,

wherein the real time equipment information includes equipment failure data, and further comprising the steps of:

transmitting the equipment failure data to a maintenance post;

determining a response time for maintenance personnel to respond to the equipment failure data as a function of the transmitted equipment failure data and a repair time entered by the maintenance personnel in response to the equipment failure data.

17. The method of claim 16 , wherein the function of time is based on one of a production unit and a service unit.

18. The method of claim 17 , wherein the production unit is a manufactured item.

19. The method of claim 17 , wherein the service unit is a completed service task.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 19, 2002
From: ZEIF, ALEX G.
To: LINXBERG TECHNOLOGY, LLC
Reel/Frame 012837/0507 →
Continuity (1)
Related Publication 20030167238A1 · Sep 4, 2003