IP Library › Granted Patent US 7,380,600
Granted Patent B2
US 7,380,600 · App. 11/294,983 · Granted Jun 3, 2008

Degradable material assisted diversion or isolation

Assignee: Schlumberger Technology Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,380,600
App. No.
11/294,983
Granted
Jun 3, 2008
Kind
B2
Abstract

A method for well treatment by forming a temporary plug in a fracture, a perforation, a wellbore, or more than one of these locations, in a well penetrating a subterranean formation is provided, in which the method of well treatment includes: injecting a slurry comprising a degradable material, allowing the degradable material to form a plug in a perforation, a fracture, or a wellbore in a well penetrating a formation; performing a downhole operation; and allowing the degradable material to degrade after a selected time such that the plug disappears.

Claims (29)

1. A method of well treatment, comprising:

a) injecting a slurry comprising a degradable fiber,

b) allowing the degradable fiber to form a plug in one or more than one of a perforation, a fracture, and a wellbore in a well penetrating a formation;

c) performing a downhole operation; and

d) allowing the degradable fiber to at least partially degrade after a selected duration such that the plug disappears.

2. The method of claim 1 , wherein the degradable fiber is selected from a polymer of lactide, glycolide, polylactic acid, polyglycolic acid, amide, and mixtures thereof.

3. The method of claim 1 , wherein the degradable fiber is present at a concentration of no less than 40 lbm/1,000 gal (4.8 g/L).

4. The method of claim 1 , wherein the operation is a fracturing operation and the method further comprises injecting a second material to induce a screenout during the fracturing operation.

5. The method of claim 1 , wherein the slurry further comprises a particulate material.

6. The method of claim 5 , wherein the particulate material is degradable.

7. The method of claim 5 , wherein the particulate material is a proppant.

8. The method of claim 7 , wherein the proppant comprises particles having a distribution of sizes.

9. The method of claim 1 , wherein the slurry further comprises an additive for delaying degradation of the degradable fiber.

10. The method of claim 1 , wherein the slurry further comprises an additive for accelerating degradation of the degradable fiber.

11. The method of claim 1 , further comprising modeling to optimize parameters for the well treatment, wherein the step of injecting the slurry is based on the optimized parameters.

12. The method of claim 11 , wherein the optimized parameters comprise the selected duration before the degradable fiber degrades.

13. The method of claim 1 , wherein the well treatment comprises hydraulic fracturing.

14. The method of claim 13 , wherein the hydraulic fracturing comprises injecting a pad, said pad comprising the degradable fiber.

15. The method of claim 14 , wherein the step of injecting the slurry is performed at the tail end of fracturing a layer.

16. The method of claim 13 , wherein hydraulic fracturing is applied to more than one layer of a multilayer formation.

17. The method of claim 16 , wherein no bridge plug or sand plug is placed in the wellbore before fracturing a subsequent layer.

18. The method of claim 16 , wherein the slurry further comprises a proppant, wherein the degradable fiber forms the plug in the fracture by bridging with the proppant when placed in the fracture.

19. The method of claim 1 , wherein the well treatment comprises acid fracturing or waterfrac.

20. The method of claim 1 , wherein the selected duration for the plug to disappear is between 0.5 and 6 hours.

21. The method of claim 1 , wherein the step of injecting the slurry is via coiled tubing installed in the well.

22. The method of claim 1 wherein the degradable fiber comprises a polyvinyl ester.

23. The method of claim 1 , wherein the treatment is used to isolate a region selected from the fracture, a production zone, and a part of the wellbore, wherein the part of the wellbore is above the formation pressure.

24. The method of claim 1 , wherein the degradable fiber is selected from limestone fibers and glass fibers.

25. The method of claim 1 , wherein the well treatment comprises chemical strimulation.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 9, 2006
From: WILLBERG, DEAN; BULOVA, MARINA; FREDD, CHRISTOPHER N.; VOSTRUKHOV, ALEXEY; BONEY, CURTIS L.; LASSEK, JOHN; HOEFER, ANN M.W.; SULLIVAN, PHILIP F.
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 017144/0120 →
Continuity (4)
Continuation In Part 1115696600 · Jun 20, 2005
Continuation In Part 1120689800 · Aug 18, 2005
Provisional Application 6060627000 · Sep 1, 2004
Related Publication 20060113077A1 · Jun 1, 2006