IP Library › Granted Patent US 7,380,609
Granted Patent B2
US 7,380,609 · App. 10/678,636 · Granted Jun 3, 2008

Method and apparatus of suspending, completing and working over a well

Assignee: Woodside Energy Limited
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,380,609
App. No.
10/678,636
Granted
Jun 3, 2008
Kind
B2
Abstract

In the various methods of the present invention, reliance is placed on a first and second barrier 26 and 30 respectively positioned in a well 10 to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth of the lowermost end of a completion string when that string is installed in the well 10 . By not placing either barrier higher up in the well-bore, both of the barriers can remain in place during suspension and completion and workover operations, thus obviating the need to use a BOP stack to supplement well control. This results in a considerable saving in drill rig time and thus significantly reduces the cost of constructing a well.

Claims (25)

1. A method of completing a sub-sea well using a horizontal christmas tree for production flow control, the horizontal christmas tree having a body, the method comprising the steps of:

forming an assembly by installing a completion string terminating at its upper end in and suspended from a tubing hanger in the body of the horizontal christmas tree, the assembly being formed above the water line; and,

running the assembly to the sub-sea well, wherein the tubing hanger and the horizontal christmas tree are above the water-line during the step of forming the assembly while control of the well is maintained by using at least two independently verifiable deep-set well control barriers.

2. A method of completing a sub-sea well using a horizontal christmas tree for production flow control according to claim 1 , wherein the step of forming the assembly further comprises the steps of landing and locking the tubing hanger in the body of the christmas tree.

3. A method of completing a sub-sea well using a horizontal christmas tree for production flow control according to claim 2 , wherein the method further comprises the step of verifying the integrity of the completed assembly above the water line.

4. A method of completing a sub-sea well using a horizontal christmas tree for production flow control according to claim 3 , wherein the step of verifying the integrity comprises the step of verifying hydraulic and electrical interfaces between the tubing hanger and the body of the christmas tree.

5. A method of completing a sub-sea well using a horizontal christmas tree for production flow control according to claim 3 , wherein the step of verifying the integrity further comprises the step of verifying the pressure integrity of the assembly.

6. A method of completing a sub-sea well using a horizontal christmas tree for production flow control according to claim 1 , wherein the step of running the assembly to the well head comprises the step of using a lower-riser package.

7. A method comprising:

coupling a tubing string with a Christmas tree above water; and

landing the Christmas tree on a subsea wellhead while maintaining control of the well using at least two independently verifiable deep-set well control barriers.

8. The method of claim 7 , wherein coupling the tubing string with the Christmas tree comprises installing a tubing hanger on an uppermost joint of the tubing string and locking the tubing hanger to the Christmas tree.

9. The method of claim 7 , further comprising:

running the Christmas tree, the tubing hanger, and the tubing string open-water to a well extending from the subsea wellhead.

10. The method of claim 9 , wherein running the Christmas tree, the tubing hanger, and the tubing string further comprises running the Christmas tree, the tubing hanger, and the tubing string without a blow-out preventer.

11. The method of claim 7 , wherein coupling the tubing string with the Christmas tree comprises installing a tubing hanger on an uppermost joint of the tubing string, locking the tubing hanger in a tubing spool, and attaching the tubing spool to the Christmas tree.

12. A method comprising:

coupling a tubing string with a tubing hanger above water;

landing the tubing hanger on a subsea wellhead; and

landing a Christmas tree on the subsea wellhead while maintaining control of the well using at least two independently verifiable deep-set well control barriers.

13. The method of claim 12 , further comprising:

latching the tubing hanger to the Christmas tree.

14. The method of claim 12 , further comprising:

latching the tubing hanger to the wellhead.

15. The method of claim 12 , wherein landing the tubing hanger on the subsea wellhead further comprises landing the tubing hanger on the subsea wellhead via a tubing spool and latching the tubing hanger to the tubing spool.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 10, 2004
From: PAGE, PETER ERNEST; BURNS, ALEXANDER JEFFREY; NISKI, JOHN EDWARD
To: WOODSIDE ENERGY LIMITED
Reel/Frame 014968/0771 →
Priority Claims (1)
AU 2003904183 · Aug 8, 2003 · national
Continuity (1)
Related Publication 20050028980A1 · Feb 10, 2005