IP Library › Granted Patent US 7,472,009
Granted Patent B2
US 7,472,009 · App. 10/974,781 · Granted Dec 30, 2008

Method and apparatus for monitoring a load condition of a dragline

Assignee: Leica Geosystems AG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,472,009
App. No.
10/974,781
Granted
Dec 30, 2008
Kind
B2
Abstract

A dragline includes a boom, a bucket, a hoist rope from which the bucket is suspended from the boom, and a drag rope for dragging the bucket. Data is produced on the alignment, with respect to a vertical plane containing the boom axis, of at least one of the following dragline components: i) the hoist rope; ii) the drag rope; iii) the boom; iv) the bucket. This data can be used for controlling the load condition on the basis of the dragline. The data can be inputted to a man-machine interface, e.g. a display device, controlled by a human operator, and/or it can be inputted to control the drive of the hoist rope and/or of the drag rope, so as to decrease or cease drive in response to detected misalignment of dragline component(s).

Claims (60)

1. Method of monitoring a load condition of a dragline ( 1 ) or an electric shovel, the dragline comprising a boom ( 4 ), a bucket ( 8 ), a hoist rope ( 10 ) from which the bucket is suspended from the boom, and a drag rope ( 18 ) for dragging the bucket, the boom extending substantially along a boom axis (BA) in its normal, unstressed state,

characterised in that it comprises the steps of:

using technical means ( 26 , 28 ; 42 ; 46 ; 48 ; 60 - 70 ; 76 , 80 ; 82 ; GPS 1 -GPS 3 ; 96 , 98 ) to produce alignment data indicative of lateral alignment, with respect to a plane containing the boom axis (BA), of at least one of the following dragline components:

i) the hoist rope ( 10 ),

ii) the drag rope ( 18 ),

iii) the boom ( 4 ),

iv) the bucket ( 8 ), and

determining the lateral alignment.

2. Method according to claim 1 , further comprising a step of controlling ( 32 ; 34 , 72 , OP) said load condition of the dragline ( 1 ) or electric shovel on the basis of said alignment data.

3. Method according to claim 2 , wherein said alignment data is inputted to a man-machine interface ( 34 , 72 ), e.g. a display device ( 72 ), whereby said controlling step is performed via a human operator (OP).

4. Method according to claim 2 , wherein said alignment data is inputted to automated control means ( 32 ) for controlling at least one of:

i) the drive ( 106 ) of the hoist rope ( 10 ),

ii) the drive ( 108 ) of the drag rope ( 18 ),

iii) the drive ( 110 ) of the boom ( 4 ), for swinging the boom, to perform said controlling step.

5. Method according to claim 2 , wherein the controlling step is performed substantially in real time using a feedback of said alignment data.

6. Method according to claim 2 , wherein said controlling step is performed in a combined manner by a human operator (OP) via a man-machine interface ( 34 , 72 ) and by automated control means ( 32 ).

7. Method according to claim 2 , wherein said controlling step comprises authorizing a controlled overload of said dragline ( 1 ) or electric shovel, notably when controlling a maximum structure stress thereon, as a function of said alignment data.

8. Method according to claim 2 , wherein said boom ( 4 ) has a specified maximum load limit, and wherein said controlling step comprises authorizing a controlled overload of the boom above said specified load limit as a function of said alignment data.

9. Method according to claim 1 , wherein said technical means produce said alignment data as quantitative data indicative of an amount of misalignment in at least one said dragline component ( 4 , 10 , 18 , 8 ).

10. Method according to claim 1 , wherein said alignment data is obtained by measurement on a pulley ( 6 ) along which the hoist rope ( 10 ) passes to hang from a distal end ( 4 b ) of the boom ( 4 ).

11. Method according to claim 10 , wherein said pulley ( 6 ) is configured to sway in response to a lateral stress from the hoist rope ( 10 ), and wherein said alignment data is obtained by determining ( 100 a , 26 b , 28 ; 38 - 36 , 42 , 28 ) the amount of sway of said pulley.

12. Method according to claim 10 , wherein said alignment data is obtained by measuring ( 46 ) a lateral stress exerted on said pulley ( 6 ).

13. Method according to claim 1 , wherein said alignment data is obtained by physical contact ( 46 , 48 ) with at least one said dragline component ( 4 , 8 , 10 , 18 ).

14. Method according to claim 13 , comprising physically engaging ( 50 ) the hoist rope ( 10 ) with an angular or linear displacement sensor device ( 56 - 36 ).

15. Method according to claim 1 , wherein said alignment data is obtained by detecting a lateral deflection of the boom ( 4 ) from said boom axis (BA).

16. Method according to claim 15 , wherein said lateral deflection is detected by producing an optical beam ( 62 ) from a source ( 60 ) attached to the boom ( 4 ), preferably at or near a distal end ( 4 b ), and detecting a displacement (SD) of the beam spot ( 65 ′) where it impinges a target ( 64 ).

17. Method according to claim 1 , wherein said alignment data is obtained by imaging ( 42 ; 48 ; 50 ) at least one said dragline component ( 4 , 8 , 10 , 18 ).

18. Method according to claim 17 , comprising imaging the hoist rope ( 10 ) using camera means ( 76 , 80 ; 82 ).

19. Method according to claim 1 , wherein said alignment data is obtained by analysing coordinate data from GPS receiver means (GPS 1 -GPS 3 ), at least one GPS receiver (GPS 3 ) being positioned on said boom ( 4 ).

20. Method according to claim 1 , wherein said alignment data is obtained by surveying techniques ( 96 , 98 ), to determine coordinate evolutions of a portion of the boom ( 4 ) susceptible of deflecting laterally with respect to its boom axis (BA).

21. Method according to claim 20 , comprising surveying a target ( 98 ) substantially at the distal end ( 4 b ) of the boom using a surveying device, preferably a self-tracking total station ( 96 ) placed at a known reference point on the dragline.

22. Apparatus for monitoring a load condition of a dragline ( 1 ) or an electric shovel, the dragline comprising a boom ( 4 ), a bucket ( 8 ), a hoist rope ( 10 ) from which the bucket is suspended from the boom, and a drag rope ( 18 ) for dragging the bucket, the boom extending substantially along a boom axis (BA) in its normal, unstressed state,

characterised in that it comprises means ( 26 , 28 ; 42 ; 46 ; 48 ; 60 - 70 ; 76 , 80 ; 82 ; GPS 1 -GPS 3 ; 96 , 98 ) for producing alignment data indicative of a lateral alignment, with respect to a plane containing said boom axis (BA), of at least one of the following dragline components:

i) the hoist rope ( 10 ),

ii) the drag rope ( 18 ),

iii) the boom ( 4 ),

iv) the bucket ( 8 ), and

means for determining said lateral alignment.

23. Apparatus according to claim 22 , further comprising control means ( 32 ; 34 , 72 , OP) for controlling said load condition of the dragline ( 1 ) or electric shovel on the basis of said alignment data.

24. Apparatus according to claim 22 , comprising a man-machine interface ( 34 , 72 ), e.g. a display device ( 72 ), for receiving said alignment data.

25. Apparatus according to claim 23 , comprising automated control means ( 32 ) for controlling at least one of:

i) the drive ( 106 ) of the hoist rope ( 10 ),

ii) the drive ( 108 ) of the drag rope ( 18 ),

iii) the drive ( 110 ) of the boom ( 4 ), for swinging the boom, in response to said alignment data.

26. Apparatus according to claim 23 , wherein said controlling means ( 32 ; 34 , 72 , OP) are arranged to operate substantially in real time using a feedback of said alignment data.

27. Apparatus according to claim 23 , comprising means for commanding a controlled overload of said dragline ( 1 ) or electric shovel, notably when controlling a maximum structure stress thereon, as a function of said alignment data.

28. Apparatus according to claim 23 , wherein said boom ( 4 ) has a specified maximum load limit, and wherein said controlling means ( 32 ; 34 , 72 , OP) comprise means for commanding a controlled overload of the boom above said specified load limit as a function of said alignment data.

29. Apparatus according to claim 22 , wherein said means ( 26 , 28 ; 42 ; 46 ; 48 ; 60 - 70 , 80 ; 82 ; GP 1 -GPS 3 ; 96 , 98 ) for producing said alignment data comprise means for producing quantitative data indicative of an amount of misalignment in at least one said dragline component ( 4 , 10 , 18 , 8 ).

30. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise means ( 26 , 28 ) for effecting a measurement on a pulley ( 6 ) along which the hoist rope ( 10 ) passes to hang from a distal end ( 4 b ) of the boom ( 4 ).

31. Apparatus according to claim 30 , wherein said pulley ( 6 ) is configured to sway in response to a lateral stress from the hoist rope ( 10 ), and wherein said means for producing said alignment data comprise means ( 100 a , 26 b , 28 ; 38 - 36 , 42 , 28 ) for determining the amount of sway of said pulley.

32. Apparatus according to claim 30 , wherein said means for producing said alignment data comprise means ( 46 ) for measuring a lateral stress exerted on said pulley ( 6 ).

33. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise means for acquiring said alignment data by physical contact ( 46 , 48 ) with at least one said dragline component ( 4 , 8 , 10 , 18 ).

34. Apparatus according to claim 33 , comprising means ( 50 ) physically engaging the hoist rope ( 10 ) with an angular or linear displacement sensor device ( 56 - 36 ).

35. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise means for detecting a lateral deflection of the boom ( 4 ) from said boom axis (BA).

36. Apparatus according to claim 35 , comprising a source ( 60 ) for generating an optical beam ( 62 ), said being attached to the boom ( 4 ), preferably at or near a distal end ( 4 b ), and means ( 66 - 70 ) for detecting a displacement (SD) of the beam spot ( 65 ′) where it impinges a target ( 64 ).

37. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise means ( 42 ; 48 ; 50 ) for imaging at least one said dragline component ( 4 , 8 , 10 , 18 ).

38. Apparatus according to claim 37 , comprising camera means ( 76 , 80 ; 82 ) for imaging the hoist rope ( 10 ).

39. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise GPS receiver means (GPS 1 -GPS 3 ), at least one GPS receiver (GPS 3 ) being positioned on said boom ( 4 ).

40. Apparatus according to claim 22 , wherein said means for producing said alignment data comprise surveying means ( 96 , 98 ) for determining coordinate evolutions of a portion of the boom ( 4 ) susceptible of deflecting laterally with respect to its boom axis (BA).

41. Apparatus according to claim 40 , comprising a target ( 98 ) substantially at the distal end ( 4 b ) of the boom, and a surveying device, preferably a self-tracking total station ( 96 ) placed at a known reference point on the dragline and aimed at said target.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2005
From: BALDWIN, GEOFF
To: LEICA GEOSYSTEMS AG
Reel/Frame 015889/0638 →
Priority Claims (1)
AU 2004222734 · Oct 20, 2004 · national
Continuity (1)
Related Publication 20060085118A1 · Apr 20, 2006