IP Library Granted Patent US 7,865,272
Granted Patent B2
US 7,865,272 · App. 11/484,877 · Granted Jan 4, 2011

Method and apparatus for preventing overloads of power distribution networks

Assignee: American Power Conversion Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,865,272
App. No.
11/484,877
Granted
Jan 4, 2011
Kind
B2
Abstract

At least one aspect of the invention is directed to a method of monitoring operation of devices in a facility. The method includes controlling a plurality of computing devices in the facility to operate at a controlled power level, where the controlled power level is a predetermined percentage of a maximum power level, measuring air temperature at one or more locations in the facility, and controlling at least one air conditioning unit in the facility based on the air temperature at the one or more locations in the facility.

Claims (23)

1. A method of monitoring operation of devices in a facility, the method comprising:

controlling a plurality of computing devices in the facility to operate at a controlled power level, where the controlled power level is a predetermined percentage of a maximum power level less than 100%;

measuring air temperature at one or more locations in the facility;

controlling at least one air conditioning unit in the facility based on the air temperature at the one or more locations in the facility;

said controlling a plurality of computing devices includes controlling each of the plurality of computing devices to perform at least one additional task selected to provide a level of capacity to cause each computing device to operate at the predetermined percentage of the maximum power level.

2. The method of claim 1 , wherein measuring air temperature includes measuring air temperature at a plurality of locations in the facility.

3. The method of claim 1 , further comprising:

comparing at least one value of air temperature measured with a predetermined value to detect an over temperature condition; and

controlling at least one of the plurality of computing devices to operate in a reduced power mode upon detection of an over temperature condition.

4. The method of claim 1 , wherein each of the plurality of computing devices includes at least one peripheral device, and wherein the method further includes controlling the at least one peripheral device of each of the plurality of computing devices to operate at the predetermined percentage of the maximum power level.

5. The method of claim 1 , further comprising determining sufficiency of air conditioning of the facility based on the temperature measured.

6. The method of claim 1 , further comprising detecting a temperature outside of the facility, and determining sufficiency of the air conditioning of the facility based at least in part on the temperature outside of the facility.

7. The method of claim 1 , further comprising assigning the at least one additional task a priority level lower than other tasks being performed by the plurality of computing devices.

8. A method for evaluating cooling capability in a facility, the method comprising:

controlling at least one computing device in the facility to operate at a controlled power level, wherein the controlled power level is a predetermined percentage of a maximum power level less than 100%;

measuring air temperature at one or more locations in the facility; and

comparing at least one value of air temperature measured with a predetermined value to detect an over temperature condition;

said controlling at least one computing device includes controlling the at least one computing device to perform at least one additional task selected to provide a level of capacity to cause the at least one computing device to operate at the predetermined percentage of the maximum power level.

9. The method of claim 8 , further comprising controlling at least one air conditioning unit in the facility based on the air temperature at the one or more locations in the facility.

10. The method of claim 8 , wherein the at least one computing device includes at least one peripheral device, and wherein the method further includes controlling the at least one peripheral device to operate at the predetermined percentage of the maximum power level.

11. The method of claim 8 , further comprising determining sufficiency of air conditioning of the facility based on the temperature measured.

12. The method of claim 8 , further comprising detecting a temperature outside of the facility, and determining sufficiency of the air conditioning of the facility based at least in part on the temperature outside of the facility.

13. The method of claim 8 , further comprising assigning the at least one additional task a priority level lower than other tasks being performed by the plurality of computing devices.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 20, 2014
From: SPITAELS, JAMES; RASMUSSEN, NEIL
To: AMERICAN POWER CONVERSION CORPORATION
Reel/Frame 033144/0880 →
CHANGE OF NAME Recorded Jun 20, 2014
From: AMERICAN POWER CONVERSION CORPORATION
To: SCHNEIDER ELECTRIC IT CORPORATION
Reel/Frame 033205/0182 →
Continuity (3)
Division 1078820000 · Feb 26, 2004
Continuation 1003870100 · Jan 2, 2002
Related Publication 20070150215A1 · Jun 28, 2007