IP Library › Granted Patent US 8,006,552
Granted Patent B2
US 8,006,552 · App. 12/444,645 · Granted Aug 30, 2011

Wind turbine generator system and method thereof for judging lightning energy level

Assignee: Mitsubishi Heavy Industries, Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,006,552
App. No.
12/444,645
Granted
Aug 30, 2011
Kind
B2
Abstract

A wind turbine generator system that can quantitatively determine the energy of a lightning strike on a wind turbine blade is provided. In the wind turbine generator system generating electricity by driving an electrical generation mechanism through rotation of a rotor head to which wind turbine blades are attached, an electrically conductive shield tape for judging the charge quantity (C) of a lightning strike is bonded to surfaces of the wind turbine blades.

Claims (22)

1. A method of judging the energy level of a lightning strike in a wind turbine generator system generating electricity by driving an electrical generation mechanism through rotation of a rotor head to which a wind turbine blade is attached, wherein

an electrically conductive shield tape is bonded to surfaces of the wind turbine blade to determine charge quantity (C) of a lightning strike from the size of a damaged area formed in the electrically conductive shield tape by the lightning strike.

2. A method of judging an energy level of a lightning strike on a wind turbine blade of a wind turbine generator system, wherein an electrically conductive shield tape is bonded to an outer surface of the wind turbine blade, said method comprising:

determining a size of a damaged area caused in the electrically conductive shield tape by the lightning strike, and

based on the size of the damaged area, judging a quantity of charge in the lightning strike to determine the energy level of said lightning strike.

3. The method of claim 2 , further comprising

predetermining a relationship between (i) a plurality of quantities of charge and (ii) sizes of a plurality of damaged areas respectively caused by said quantities of charge in at least one test electrically conductive shield tape of the same material as the electrically conductive shield tape bonded to the wind turbine blade,

wherein said judging comprises using the predetermined relationship to determine the quantity of charge in the lightning strike based on the size of the damaged area caused in the electrically conductive shield tape by the lightning strike.

4. The method of claim 3 , wherein said predetermining comprises lightning simulation.

5. The method of claim 3 , wherein said predetermining comprises

simulating a lighting strike, of one of said plurality of quantities of charge, on said at least one test electrically conductive shield tape,

determining the size of the damaged area caused by said simulated lightning strike in said at least one test electrically conductive shield tape, and

correlating the determined size of the damaged area with said one of said plurality of quantities to obtain said relationship.

6. The method of claim 5 , wherein said simulating comprises

discharging electricity from a charger, via switch to an electrode and eventually to said at least one test electrically conductive shield tape to cause the damaged area on said at least one test electrically conductive shield tape.

7. The method of claim 6 , further comprising

varying at least one of energy density, charge quantity, or peak current of the electricity discharge to simulate lighting strikes of various said plurality of quantities of charge.

8. The method of claim 3 , wherein said relationship comprises a table that correlates the plurality of quantities of charge to the sizes of the respective plurality of damaged areas.

9. The method of claim 2 , further comprising

based on the determined energy level of said lightning strike, assigning a responsibility for repairing the wind turbine blade to a respective one among a plurality of parties.

10. The method of claim 2 , further comprising

bonding said electrically conductive shield tape to the wind turbine blade before said lightning strike occurs.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2009
From: MATSUSHITA, TAKATOSHI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 022514/0987 →
Priority Claims (1)
JP 2007-126473 · May 11, 2007 · national
Continuity (1)
Related Publication 20100077850A1 · Apr 1, 2010