IP Library Granted Patent US 8,041,526
Granted Patent B2
US 8,041,526 · App. 12/226,830 · Granted Oct 18, 2011

Method, apparatus and system for reducing waste in production systems

Assignee: Thomson Licensing
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,041,526
App. No.
12/226,830
Granted
Oct 18, 2011
Kind
B2
Abstract

A production system includes at least one production component having a production cycle which is interruptible by a detected production failure, at least one detector configured to monitor an output of the at least one production component, the detector configured to detect a production failure and to generate a signal indicative of the production failure, and a control unit. The control unit is configured to, in response to the signal from the detector, cause the respective production component to reject production material for a first predetermined duration of time, and in response to the expiration of the first predetermined duration of time, to slow down production for at least a second predetermined duration of time. The control unit can further return the production system to a normal production state in response to receiving a restart signal before the expiration of the first or second predetermined duration of time.

Claims (24)

1. A method for use in a production line, comprising:

in response to a production failure detected by at least one electronic hardware monitoring at least one of a quantity and a quality of production material in said production line, rejecting said production material for a first predetermined duration of time after the detected failure; and

in response to expiration of the first predetermined duration of time, slowing down production for at least a second predetermined duration of time.

2. The method of claim 1 , further comprising:

in response to expiration of the second predetermined duration of time, shutting down the production line.

3. The method of claim 1 , wherein the production failure comprises at least one of a quantity of production material existing in said production line not matching a predetermined quantity, a production cycle time not matching a predetermined cycle time, a quality of production material in said production line not matching a predetermined quality, and a failure of a production component.

4. The method of claim 1 , wherein said production line comprises an injection molding manufacturing system.

5. The method of claim 4 , wherein said production material comprises optical disks.

6. The method of claim 1 , wherein said slowing down production comprises increasing a cycle time for manufacturing said production material.

7. The method of claim 1 , further comprising, in response to receiving a restart signal during said second predetermined duration of time, returning said production line to a normal production state.

8. The method of claim 1 , further comprising, in response to receiving a restart signal during said first predetermined duration of time, returning said production line to a normal production state.

9. A production system, comprising:

at least one electronic hardware configured for monitoring at least one of a quantity and a quality of production material in the production system for detecting a production failure; and

at least one control unit configured for, in response to said detected production failure, causing production material to be rejected for a first predetermined duration of time after the detected failure; and in response to expiration of the first predetermined duration of time, causing production to be slowed down for at least a second predetermined duration of time.

10. The system of claim 9 , wherein said at least one control unit is further configured for:

in response to expiration of the second predetermined duration of time, shutting down the production line.

11. The system of claim 9 , wherein said production failure comprises at least one of a quantity of production material existing in said production line not matching a predetermined quantity, a production cycle time not matching a predetermined cycle time, a quality of production material in said production line not matching a predetermined quality, and a failure of a production component.

12. The system of claim 9 , wherein said system is an injection molding manufacturing system.

13. The system of claim 12 , wherein said production material comprises optical disks.

14. The system of claim 9 , wherein said slowing down production comprises increasing a cycle time for manufacturing said production material.

15. The system of claim 9 , wherein said at least one control unit is further configured for:

in response to receiving a restart signal during said second predetermined duration of time, returning said production line to a normal production state.

16. The system of claim 9 , wherein said at least one control unit is further configured for:

in response to receiving a restart signal during said first predetermined duration of time, returning said production line to a normal production state.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 29, 2008
From: SANDOVAL, FRANCISCO BAUTISTA; DEL TORO, EFRAIN SANDOVAL; MURILLO, ENRIQUE VILLASENOR
To: TECHNICOLOR INC.
Reel/Frame 021786/0966 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 29, 2008
From: TECHNICOLOR INC.
To: THOMSON LICENSING
Reel/Frame 021786/0975 →
Continuity (1)
Related Publication 20090099679A1 · Apr 16, 2009