IP Library Granted Patent US 8,087,898
Granted Patent B2
US 8,087,898 · App. 12/637,950 · Granted Jan 3, 2012

Stress relief flange and method for distributing stress for wind turbine components

Assignee: General Electric Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,087,898
App. No.
12/637,950
Granted
Jan 3, 2012
Kind
B2
Abstract

A wind turbine including an article, article, and method of forming an article for distributing stress are disclosed. The article includes a flange for securing an upper tower section and a lower tower section of a wind turbine and includes a first arm extending in a first direction, a second arm extending in a second direction substantially perpendicular to the first direction, a relief region disposed between the first arm and the second arm, the relief region maintaining or improving the distribution of stress on wind turbine components selected from the group consisting of the first arm of the flange, the second arm of the flange, a fastener of the flange, and combinations thereof.

Claims (41)

1. A flange for securing an upper tower section and a lower tower section of a wind turbine, the flange comprising:

a first arm extending in a first direction;

a second arm extending in a second direction, the second direction being substantially perpendicular to the first direction; and

a relief region disposed adjacent to the junction of the first arm and the second arm, the relief region including a space located below the surface of the junction of the first arm and the second arm.

2. The flange of claim 1 , wherein the relief region includes a predetermined size in relation to a height of the flange.

3. The flange of claim 2 , wherein the flange includes a predetermined amount of material between the relief region and a second flange.

4. The flange of claim 3 , wherein the predetermined amount of material between the relief region and the second flange is at least 35% of the height of the flange.

5. The flange of claim 2 , wherein the flange includes a predetermined amount of material between the relief region and a hole in the flange.

6. The flange of claim 5 , wherein the predetermined amount of material between the relief region and the hole in the flange is at least 10% of the height of the flange.

7. The flange of claim 1 , wherein the relief region includes a predetermined position in relation to a height of the flange.

8. The flange of claim 1 , wherein the relief region maintains or improves the distribution of stress on wind turbine components compared to a flange devoid of the relief region.

9. The flange of claim 8 , wherein the wind turbine components are selected from the group consisting of the first arm of the flange, the second arm of the flange, a fastener of the flange, and combinations thereof.

10. The flange of claim 9 , wherein the distribution of stress on the first arm is improved by at least 9% compared to a flange devoid of the relief region.

11. The flange of claim 9 , wherein the distribution of stress on the second arm is improved by at least 3% compared to a flange devoid of the relief region.

12. The flange of claim 9 , further comprising a fastener, wherein the distribution of stress on the fastener is improved by at least 1% compared to a flange devoid of the relief region.

13. A wind turbine, comprising:

at least one blade operably mounted on a tower, the at least one blade attached to a rotor having a rotor shaft, the rotor shaft in rotational communication with a generator, the tower including an upper tower section and a lower tower section;

a first flange, the first flange comprising:

a first arm extending in a first direction;

a second arm extending in a second direction, the second direction being substantially perpendicular to the first direction;

a relief region disposed adjacent to the junction of the first arm and the second arm, the relief region including a space located below the surface of the junction of the first arm and the second arm;

a second flange, the second flange comprising:

a first arm extending in a first direction;

a second arm extending in a second direction, the second direction being substantially perpendicular to the first direction;

a relief region disposed adjacent to the junction of the first arm and the second arm, the relief region including a space located below the surface of the junction of the first arm and the second arm;

and wherein the first flange is secured to the second flange.

14. The wind turbine of claim 13 , wherein the flange includes a predetermined amount of material between the relief region of the first flange and the relief region of the second flange.

15. The wind turbine of claim 13 , wherein the relief region maintains or improves the distribution of stress on wind turbine components compared to a flange devoid of the relief region.

16. A method of distributing stress in flanges securing an upper tower section and a lower tower section of a wind turbine, the method comprising: forming a first flange, the first flange comprising:

a first arm extending in a first direction;

a second arm extending in a second direction, the second direction being substantially perpendicular to the first direction;

a relief region disposed adjacent to the junction of the first arm and the second arm, the relief region including a space located below the surface of the junction of the first arm and the second arm;

forming a second flange, the second flange comprising:

a first arm extending in a first direction;

a second arm extending in a second direction, the second direction being substantially perpendicular to the first direction;

a relief region disposed adjacent to the junction of the first arm and the second arm, the relief region including a space, the space including a fillet below the surface of the junction of the first arm and the second arm; and

securing the first flange to the second flange with a fastener.

17. The method of claim 16 , further comprising maintaining or improving the distribution of stress on wind turbine components compared to a flange devoid of the relief region.

18. The method of claim 17 , wherein the distribution of stress on the first arm of the first flange is improved by at least 9% compared to a flange devoid of the relief region.

19. The method of claim 17 , wherein the distribution of stress on the second arm of the first flange is improved by at least 3% compared to a flange devoid of the relief region.

20. The method of claim 17 , further comprising a fastener, wherein the distribution of stress on the fastener is improved by at least 1% compared to a flange devoid of the relief region.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2009
From: TETAMBE, RAVINDRA P.; PAURA, INGO
To: GENERAL ELECTRIC COMPANY
Reel/Frame 023653/0508 →
Continuity (1)
Related Publication 20110135492A1 · Jun 9, 2011