IP Library Granted Patent US 8,315,841
Granted Patent B2
US 8,315,841 · App. 13/018,185 · Granted Nov 20, 2012

Methods and systems for managing facility power and cooling

Assignee: American Power Conversion Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,315,841
App. No.
13/018,185
Granted
Nov 20, 2012
Kind
B2
Abstract

Systems and methods are provided for determining data center cooling and power requirements and for monitoring performance of cooling and power systems in data centers. At least one aspect provides a system and method that enables a data center operator to determine available power and cooling at specific areas and enclosures in a data center to assist in locating new equipment in the data center.

Claims (56)

1. A computer-implemented method of designing and upgrading an equipment layout in a data center, the method comprising:

providing, by a computer, a graphical user interface for designing the equipment layout in the data center, the graphical user interface including a graphical representation of the equipment layout;

receiving, via the graphical user interface, input indicating operational guidelines for the data center;

receiving, via the graphical user interface, input specifying locations of a plurality of equipment racks and at least one cooling provider included within the data center;

executing, by the computer, a predictive analysis to determine cooling and power performance of the plurality of equipment racks and the at least one cooling provider;

determining a comparison result indicating whether the cooling and power performance meets the operational guidelines; and

simultaneously displaying on a display screen a full room view of the equipment layout for the data center, including a representation of the plurality of equipment racks, the at least one cooling provider, the cooling and power performance, and the comparison result in the graphical user interface.

2. The method of claim 1 , wherein receiving the input indicating the operational guidelines includes at least one of (a) receiving, input specifying power redundancy requirements of the plurality of equipment racks and (b) receiving input specifying cooling redundancy requirements of the plurality of equipment racks within the data center.

3. The method of claim 1 , further including determining at least one of stranded cooling capacity and stranded power capacity in the data center.

4. The method of claim 1 , further including receiving, via the graphical user interface, input specifying locations of a plurality of perforated floor tiles included within the data center.

5. The method of claim 1 , further including issuing at least one warning based on the comparison result.

6. The method of claim 1 , further including:

receiving input specifying operating parameters for each of the plurality of equipment racks and at least one cooling provider;

searching for equipment matching the operating parameters; and

displaying the equipment matching the operating parameters.

7. The method of claim 1 , wherein determining the comparison result further includes storing, the equipment layout, as a result of the cooling and power performance meeting the operational guidelines.

8. The method of claim 7 , further including:

retrieving the equipment layout;

receiving, via the graphical user interface, input specifying locations of additional equipment in the equipment layout, the additional equipment including at least one of at least one additional equipment rack and at least one additional cooling provider;

executing, by the computer, the predictive analysis to determine cooling and power performance of the additional equipment;

determining a second comparison result indicating whether the cooling and power performance meets the operational guidelines; and

displaying a representation of the plurality of equipment racks, the at least one cooling provider, the at least one additional equipment rack, the at least one additional cooling provider, the cooling and power performance, and the second comparison result in the graphical user interface.

9. The method of claim 8 , wherein receiving the input specifying the locations of the additional equipment in the graphical representation further includes providing, via the graphical interface, at least one proposed location for the additional equipment that meets the operational guidelines.

10. The method of claim 8 , further including storing an updated equipment layout including the at least one additional equipment rack, and the at least one additional cooling provider, as a result of meeting the operational guidelines.

11. A system for designing and upgrading an equipment layout a data center, the system comprising:

a memory for storing data;

a graphical user interface for designing the equipment layout, in the data center, the graphical user interface including a graphical representation of the equipment layout;

a controller coupled to the memory and to the graphical user interface, and configured to:

receive, via the graphical user interface, input indicating operational guidelines for the data center;

receive, via the graphical user interface, input specifying locations of a plurality of equipment racks and at least one cooling provider included within the data center;

perform a predictive analysis to determine cooling and power performance of the plurality of equipment racks and the at least one cooling provider;

determine a comparison result indicating whether the cooling and power performance meets the operational guidelines; and

provide an output, via the graphical user interface, simultaneously displaying on a display screen a full room view of the equipment layout for the data center, including the plurality of equipment racks, the at least one cooling provider, the cooling and power performance, and the comparison result.

12. The system of claim 11 , wherein the operational guidelines include at least one of power redundancy requirements and cooling redundancy requirements of the plurality of equipment racks for the data center.

13. The system of claim 11 , wherein the controller is further configured to determine at least one of stranded cooling capacity and stranded power capacity in the data center.

14. The system of claim 11 , wherein the controller is further configured to receive input specifying locations for a plurality of perforated floor tiles within the data center.

15. The system of claim 11 , wherein the controller is further configured to issue at least one warning based on the comparison result.

16. The system of claim 11 , wherein the controller is further configured to:

receive input indicating operating parameters for each of the plurality of equipment racks and at least one cooling provider;

search for equipment matching the operating parameters; and

provide a second output to the graphical user interface, the second output including the equipment matching the operating parameters.

17. The system of claim 11 , wherein the controller is further configured to store the equipment layout, in the memory, as a result of receiving the comparison result meeting the operational guidelines.

18. The system of claim 17 , wherein the controller is further configured to

retrieve the equipment layout;

receive, via the graphical user interface, input specifying locations of additional equipment included within the data center, the additional equipment including at least one of at least one additional equipment rack and at least one additional cooling provider;

perform the predictive analysis to determine cooling and power performance of the additional equipment;

determine a second comparison result indicating whether the cooling and power performance meets the operational guidelines; and

provide a second output, via the graphical user interface, the second output including an updated equipment layout, including the additional equipment, the cooling and power performance, and the second comparison result.

19. The system of claim 17 , wherein the controller is further configured to store the second output, in the memory, as a result of the second comparison result meeting the operational guidelines.

20. A non-transitory computer readable medium having stored thereon sequences of instructions for designing and upgrading an equipment layout in a data center including instructions that will cause a processor to:

provide a graphical user interface for designing the equipment layout in the data center, the graphical user interface including a graphical representation of the equipment layout;

receive input indicating operational guidelines for the data center;

receive input specifying locations of a plurality of equipment racks and at least one cooling provider included within the data center;

execute a predictive analysis to determine cooling and power performance of the plurality of equipment racks and the at least one cooling provider in the data center;

determine a comparison result indicating whether the cooling and power performance meets the operational guidelines; and

simultaneously display on a display screen a full room view of the equipment layout for the data center, including a representation of the plurality of equipment racks, the at least one cooling provider, the cooling and power performance, and the comparison result in the graphical user interface.

Assignments (1)
CHANGE OF NAME Recorded Sep 11, 2013
From: AMERICAN POWER CONVERSION CORPORATION
To: SCHNEIDER ELECTRIC IT CORPORATION
Reel/Frame 031203/0495 →
Continuity (4)
Continuation 11342300 · Jan 27, 2006
Continuation In Part 11120137 · May 2, 2005
Provisional Application 60719356 · Sep 22, 2005
Related Publication 20110307820A1 · Dec 15, 2011