Method of supporting panel structures over concrete footings utilizing tie system for forming poured concrete walls
A tie system and method for forming a wall from a hardenable building material. In one embodiment, the tie system includes multiple ties configured to be directly interconnected into a vertically extending tie stack such that multiple tie stacks can be positioned over a footing in a spaced apart arrangement. The multiple tie stacks are configured to extend substantially perpendicular between substantially parallel panel structures. Each tie stack includes one or more base members and one or more wall ties, each of which directly attach to each other in a vertically stacked arrangement.
1. A method of supporting panel structures spaced over a footing to receive a hardenable building material, the method comprising:
providing multiple base members and wall ties, each base member including an upstanding portion extending vertically from a horizontally extending base extension, each wall tie including a first elongated wall portion and a second elongated wall portion with a cross-member portion extending therebetween, the first and second elongated wall portions configured to extend vertically relative to the footing and the first and second elongated wall portions including a respective first flat surface and a second flat surface, the first flat surface and the second flat surface facing in directly opposite directions;
securing the multiple base members to the footing in a spaced apart arrangement along the footing;
attaching a first level of the wall ties to each of the base members by mating end portions of the first and second elongated wall portions of the wall tie to the upstanding portions of the base members;
attaching one or more additional levels of wall ties to each of the previously attached wall ties by mating the end portions of the first and second elongated wall portions of other wall ties together to vertically build separate and discrete tie stacks;
securing one or more first panel structures to the first flat surface of the first elongated wall portion of each of the wall ties of the tie stacks; and
securing one or more second panel structures to the second flat surface of the second elongated wall portion of each of the wall ties of the tie stacks.
2. The method of claim 1 , further comprising inserting a water stop into the footing and attaching the first level of wall ties over the water stop.
3. The method of claim 1 , further comprising securing multiple finish ties to an upper end of the one or more first and second panel structures such that each finish tie includes an elongated structure having a first end portion and a second end portion each with a channel defined therein, the channel sized to receive the upper end of one of the one or more first and second panel structures.
4. The method of claim 1 , wherein the securing of the one or more first and second panel structures comprises bowing the one or more first and second panel structures against the respective first and second elongated wall portions of each of the wall ties of the tie stacks in a curved orientation to follow a radius of the footing.
5. The method of claim 1 , wherein the securing the base members comprises orienting at least some of the base members along a curved footing portion with a radius so that the tie stacks vertically extend from and correspond with the base members to facilitate the one or more first and second panel structures being secured to the tie stacks to include a panel structure radius that corresponds with the radius of the curved footing portion of the footing.
6. The method of claim 1 , further comprising laying rebar over the cross-member portion of wall ties of any one of the first level or the additional levels of the wall ties.