IP Library › Granted Patent US 8,500,864
Granted Patent B2
US 8,500,864 · App. 12/524,661 · Granted Aug 6, 2013

Method and plant for treating crude gas, in particular biogas, containing methane and carbon dioxide in order to produce methane

Inventor: Lothar Günther (Geretsried, DE)
Assignee: MT-Biomethan GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,500,864
App. No.
12/524,661
Granted
Aug 6, 2013
Kind
B2
Abstract

A method for treating crude gas, in particular biogas, containing methane and carbon dioxide, in order to produce methane, and a plant suitable for carrying out the method. The method includes (a) washing the crude gas with an amine-containing washing solution, thereby forming a pure gas stream of methane and water, from which water is separated by subsequent cooling and condensation; (b) compressing and heating the washing solution containing CO 2 and sulfur compounds and expanding the washing solution in a first expansion stage, during a secondary reaction time of 280 to 1200 seconds and at a constant reaction temperature; (c) cooling the purified washing solution and expanding it in a second expansion stage to normal pressure, whereupon any residual amounts of soluble CO 2 and sulfur compounds are separated and the completely purified washing solution is cooled to normal temperature and returned to the washing stage.

Claims (14)

1. A method of treating crude gases containing methane and carbon dioxide to produce methane, which comprises:

a) subjecting the crude gas to a single or multi-stage scrubbing process with an amine-containing scrubbing solution at an amine concentration of at least 15% with the formation of a pure gas stream consisting of methane and water, removing the water from the pure gas stream and, optionally, returning the water to a scrubbing circuit by downstream cooling and condensation;

b) compressing a scrubbing solution containing CO 2 and sulfur compounds obtained in step a) to a reaction pressure of at least 4 bar, heating to a temperature above 120° C. and expanding, in an initial expansion stage, to a pressure that is 1 to 3 bar below the reaction pressure, while maintaining a secondary reaction time of 280 to 1200 seconds and a constant reaction temperature, for removing a major proportion of the CO 2 and sulfur compounds from the scrubbing solution and drawing off as a gas stream;

c) cooling the thus purified scrubbing solution to a temperature below 50° C. and expanding in a second expansion stage to standard pressure, to remove residual amounts of soluble CO 2 and sulfur compounds still present to form a completely purified scrubbing solution, and cooling the completely purified scrubbing solution to standard temperature and returning to the scrubbing stage.

2. The method according to claim 1 , which comprises scrubbing the crude gas at standard pressure or at a slight vacuum up to 50 mbar, and with an amine-containing scrubbing solution at an amine concentration of at least 15% at standard temperature or temperatures up to 100° C.

3. The method according to claim 1 , wherein step b) comprises compressing the scrubbing solution to a reaction pressure of between 8 and 12 bar.

4. The method according to claim 1 , wherein the multi-stage scrubbing process includes an initial scrubbing stage in which more than 50% of a total amount of scrubbing solution required is used and wherein the scrubbing solutions of the individual scrubbing stages are combined and regeneratively processed.

5. The method according to claim 1 , which comprises heating the scrubbing solution obtained after washing to a required reaction temperature in two stages by way of indirectly heated heat exchangers.

6. The method according to claim 1 , which comprises conducting the gas stream containing CO 2 and sulfur compounds separated in an initial expansion stage through two heat exchangers connected in series and cooling to standard temperature and conveying to a downstream separator for removing water condensed from the gas stream and removing the water-free gas stream under controlled pressure.

7. The method according to claim 1 , which comprises using hot scrubbing solution removed from an initial expansion stage as a heat carrier for at least one of the heat exchangers and thereby cooling the scrubbing solution to a temperature of no more than 50° C.

8. The method according to claim 1 , which comprises heating the crude gas to a temperature of 20 to 60° C. in process step a) and adjusting to a pressure ranging from −20 to 150 mbar.

9. The method according to claim 1 , which comprises removing more than 95% of the proportions of CO 2 and sulfur compounds bound in the scrubbing solution during the initial expansion stage.

10. The method according to claim 1 , which comprises desulfurizing at least the gas stream removed from the initial expansion stage in a downstream desulphurization plant.

11. The method according to claim 1 , which comprises subjecting the scrubbing solution to an ultrasonic treatment during the initial expansion phase.

Assignments (5)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE DATA PREVIOUSLY RECORDED AT REEL: 040144 FRAME: 0653. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Feb 22, 2017
From: HZI DEUTSCHLAND GMBH
To: HITACHI ZOSEN INOVA BIOMETHAN GMBH
Reel/Frame 041773/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 26, 2016
From: HZI DEUTSCHLAND GMBH
To: HITACHI ZOSEN INOVA AG
Reel/Frame 040144/0653 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 23, 2016
From: MT BIOMETHAN GMBH
To: HZI DEUTSCHLAND GMBH
Reel/Frame 039838/0428 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2011
From: DGE DR.-ING. GUENTHER ENGINEERING GMBH
To: MT-BIOMETHAN GMBH
Reel/Frame 025814/0076 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 21, 2010
From: GUENTHER, LOTHAR
To: DGE DR.-ING. GUENTHER ENGINEERING GMBH
Reel/Frame 025532/0846 →
Priority Claims (1)
EP 07001956 · Jan 30, 2007 · regional
Continuity (1)
Related Publication 20100036187A1 · Feb 11, 2010