IP Library Granted Patent US 8,596,363
Granted Patent B1
US 8,596,363 · App. 13/569,632 · Granted Dec 3, 2013

Oil and gas well cement systems using elemental sulfur

Inventors: Amir Mahmoudkhani (Calgary, CA); Neil Warrender (Calgary, CA)
Assignee: Sanjel Limited Partnership
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,596,363
App. No.
13/569,632
Granted
Dec 3, 2013
Kind
B1
Abstract

A cement composition for cementing an oil or gas well includes Portland cement, water and a sulfur component. The cement composition may be used to cement a well bore by creating a cement slurry including the sulfur component, pumping the slurry into the well bore to a selected location and allowing it to solidify.

Claims (14)

1. A method of cementing a subterranean wellbore, comprising the step of creating a pumpable cement slurry, and introducing the slurry into the wellbore, wherein said slurry comprises water and a cement composition comprising a Portland cement and elemental sulfur, the slurry being free of aggregate.

2. The method of claim 1 which is a primary cementing method.

3. The method of claim 1 which is a remedial cementing process.

4. The method of claim 1 wherein the cement composition further comprises one or more of the following additives: a retarder, a fluid loss control agent, an accelerator, a dispersant, a cementitious material, or a pozzolanic material.

5. The method of claim 1 wherein the Portland cement is a type A or a type G cement.

6. The method of claim 4 wherein the slurry further comprises fly ash.

7. The method of claim 1 wherein the sulfur component comprises finely divided elemental sulfur, or its reaction products, or both.

8. The method of claim 7 wherein the elemental sulfur has an average particle size less than about 1 mm in size.

9. The method of claim 1 wherein the sulfur component comprises more than 0% and less than about 40% by weight of blend of the cement composition.

10. The method of claim 9 wherein the sulfur component comprises more than about 5% and less than about 30% by weight of blend of the cement composition.

11. The method of claim 10 wherein the sulfur component comprises more than about 10% and less than about 20% by weight of blend of the cement composition.

12. The method of claim 7 wherein the elemental sulfur comprises high purity sulfur, with less than about 2% impurities by weight.

13. The method of claim 1 wherein the cement composition further comprises a sulfur cross-linking agent.

14. The method of claim 13 wherein the sulfur cross-linking agent comprises a styrene-butadiene copolymer or a poly-sulfur silane coupling agent.

Assignments (5)
CHANGE OF NAME Recorded Jan 6, 2017
From: 1961531 ALBERTA LTD.
To: SANJEL ENERGY SERVICES INC.
Reel/Frame 041275/0549 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 21, 2016
From: SANJEL CANADA LTD.
To: 1961531 ALBERTA LTD.
Reel/Frame 039821/0638 →
SECURITY INTEREST Recorded Sep 22, 2014
From: SANJEL CANADA LTD.
To: ALBERTA TREASURY BRANCHES
Reel/Frame 033788/0307 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2013
From: SANJEL LIMITED PARTNERSHIP
To: SANJEL CANADA LTD.
Reel/Frame 029996/0689 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2012
From: MAHMOUDKHANI, AMIR H.; WARRENDER, NEIL
To: SANJEL LIMITED PARTNERSHIP
Reel/Frame 028750/0388 →
Continuity (2)
Division 12394864 · Feb 27, 2009
Provisional Application 61031898 · Feb 27, 2008