IP Library Granted Patent US 8,807,244
Granted Patent B2
US 8,807,244 · App. 13/399,722 · Granted Aug 19, 2014

Method and apparatus for strengthening a wellbore

Inventor: Dietmar J. Neidhardt (The Woodlands, TX)
Assignee: Schlumberger Technology Corporation
E21B21/003E21B7/20E21B33/138
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,807,244
App. No.
13/399,722
Granted
Aug 19, 2014
Kind
B2
Abstract

Embodiments include drilling through a formation using a drill bit conveyed by a tubular string having an outer diameter at least 70 percent of the wellbore being drilled. The formation is drilled at a first rate of penetration (ROP) while pumping drilling fluid at a first flow rate. After drilling through the formation, the ROP is reduced to a second ROP, the flow rate is reduced to a second flow rate, and pressure is increased in the wellbore until drilling fluid begins to leak into the formation. While maintaining the increased pressure in the wellbore, the volume of drilling fluid lost to the formation is monitored until the rate at which the drilling fluid loss occurs is reduced. Components of this procedure are repeated until a selected wellbore strength is achieved.

Claims (29)

1. A method of strengthening a wellbore, comprising:

drilling through a formation using a drill bit conveyed by a tubular string having an outer diameter at least 70 percent of the wellbore being drilled, wherein the formation is drilled at a first rate of penetration (ROP) while pumping drilling fluid at a first flow rate;

after drilling through the formation so the tubular string extends beyond the formation, reducing the ROP to a second ROP, reducing the flow rate to a second flow rate, and increasing a pressure in the wellbore until drilling fluid begins to leak into the formation;

while maintaining the increased pressure in the wellbore, monitoring the volume of drilling fluid lost to the formation until the rate at which the drilling fluid loss occurs is reduced; and

repeating the increasing of pressure, leaking of drilling fluid into the formation, and monitoring the volume of drilling fluid lost to the formation until the rate at which the drilling fluid loss occurs is reduced until a selected wellbore strength is achieved.

2. The method of claim 1 , further comprising:

filtering drill cuttings of a selected size range from the drilling fluid;

pumping the filtered drill cuttings back into the wellbore.

3. The method of claim 2 , further comprising:

refining the filtered drill cuttings into smaller particles before pumping the filtered drill cuttings back into the wellbore.

4. The method of claim 2 , wherein the selected size of the refined drill cuttings is selected according to formation properties.

5. The method of claim 1 , wherein the selected wellbore strength of the formation is sufficient to resist the pressure exerted on the formation by drilling fluid selected for drilling into a high pressure zone located below the formation.

6. The method of claim 5 , further comprising:

drilling into the high pressure zone without cementing a liner in the wellbore between the formation and the high pressure zone.

7. A method of drilling a wellbore, comprising:

determining an approximate depth of a loss zone based on well data from a prior well drilled in a vicinity of the wellbore to be drilled;

drilling down to the loss zone using a drill bit conveyed by a tubular string having an outer diameter at least 70 percent of the wellbore being drilled, wherein the loss zone is drilled at a first rate of penetration (ROP) while pumping drilling fluid at a first flow rate;

after drilling through the loss zone so the tubular string extends beyond the loss zone, reducing the ROP to a second ROP, reducing the flow rate to a second flow rate, and increasing a pressure in the wellbore until drilling fluid begins to leak into the loss zone;

while maintaining the increased pressure in the wellbore, monitoring the volume of drilling fluid lost to the loss zone until the rate at which the drilling fluid loss occurs is reduced; and

repeating the increasing of pressure, leaking of drilling fluid into the loss zone, and monitoring the volume of drilling fluid lost to the loss zone until the rate at which the drilling fluid loss occurs is reduced until a selected wellbore strength is achieved.

8. The method of claim 7 , wherein the selected wellbore strength of the loss zone is sufficient to resist the pressure exerted on the loss zone by drilling fluid selected for drilling into a high pressure zone located below the loss zone.

9. The method of claim 8 , further comprising:

drilling into the high pressure zone without cementing a liner in the wellbore through the loss zone.

10. The method of claim 7 , further comprising:

filtering drill cuttings of a selected size range from the drilling fluid;

pumping the filtered drill cuttings back into the wellbore.

11. The method of claim 10 , further comprising:

refining the filtered drill cuttings into smaller particles before pumping the filtered drill cuttings back into the wellbore.

12. The method of claim 10 , wherein the selected size of the refined drill cuttings is selected according to the properties of the formation properties.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2013
From: TESCO CORPORATION
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 029659/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 17, 2012
From: NEIDHARDT, DIETMAR J.
To: TESCO CORPORATION
Reel/Frame 027726/0276 →
Continuity (2)
Provisional Application 61444691 · Feb 18, 2011
Related Publication 20120211279A1 · Aug 23, 2012