IP Library › Granted Patent US 8,857,187
Granted Patent B2
US 8,857,187 · App. 13/081,293 · Granted Oct 14, 2014

Steam turbine plant

Inventors: Koichi Goto (Yokohama, JP); Nobuo Okita (Ushiku, JP)
Assignee: Kabushiki Kaisha Tosiba
F01K7/18F03G6/065F03G6/005F01K7/22F22B1/006Y02E10/46
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,857,187
App. No.
13/081,293
Granted
Oct 14, 2014
Kind
B2
Abstract

A steam turbine plant of one embodiment includes a solar energy collector configured to collect solar heat, a boiler configured to change water into steam by the solar heat, a high pressure turbine including a turbine or turbines connected to each other in series, and configured to be driven by the steam from the boiler, first to N-th reheaters, where N is an integer of two or more, and first to N-th reheat turbines, wherein the first reheater is configured to heat the steam exhausted from the high pressure turbine by the solar heat, and the first reheat turbine is configured to be driven by the steam from the first reheater, and the second to N-th reheaters are configured to heat the steam exhausted from the first to (N−1)-th reheat turbines by the solar heat, respectively, and the second to N-th reheat turbines are configured to be driven by the steam from the second to the N-th reheaters, respectively.

Claims (25)

1. A steam turbine plant comprising:

a solar energy collector configured to collect solar heat;

a boiler;

a steam as a working fluid, the boiler configured to change water into the steam using the solar heat;

a high pressure turbine including a turbine or turbines connected to each other in series, and configured to be driven by the steam from the boiler;

first to N-th reheaters, where N is an integer of two or more; and

first to N-th reheat turbines,

wherein

the first reheater is configured to heat the steam exhausted from the high pressure turbine using the solar heat, and the first reheat turbine is configured to be driven by the steam from the first reheater,

a second to the N-th reheaters are configured to heat the steam exhausted from the first to (N−1)-th reheat turbines using the solar heat, respectively, and a second to the N-th reheat turbines are configured to be driven by the steam from the second to the N-th reheaters, respectively,

the steam inside of a reheat turbine other than the N-th reheat turbine among the first to N-th reheat turbines is maintained as dry steam,

the steam inside the N-th reheat turbine is changed from dry steam to humid steam, and

the steam inside the high pressure turbine is maintained as dry steam.

2. The plant of claim 1 , wherein

the solar energy collector is a trough condensing solar energy collector.

3. The plant of claim 1 , wherein

a difference between an inlet steam temperature of a turbine located at a most upstream among all of the turbines of the steam turbine plant and a saturation temperature under an inlet steam pressure of the most upstream turbine is 100° C. or less.

4. The plant of claim 1 , wherein

an inlet steam of a turbine located at a most upstream among all of the turbines of the steam turbine plant has a pressure of 20 ata or more and a temperature of 420° C. or less.

5. The plant of claim 1 , wherein

N is an integer of three or more, and

a difference between an inlet steam temperature of a turbine located at a most upstream among all of the turbines of the steam turbine plant and a saturation temperature under an inlet steam pressure of the most upstream turbine is 20° C. or less.

6. The plant of claim 1 , wherein

N is an integer of three or more, and

an inlet steam of a turbine located at a most upstream among all of the turbines of the steam turbine plant has a pressure of 20 ata or more and a temperature of 300° C. or less.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2011
From: GOTO, KOICHI; OKITA, NOBUO
To: KABUSHIKI KAISHA TOSHIBA
Reel/Frame 026089/0573 →
Priority Claims (1)
JP 2010-088651 · Apr 7, 2010 · national
Continuity (1)
Related Publication 20110247329A1 · Oct 13, 2011