IP Library Granted Patent US 8,920,988
Granted Patent B2
US 8,920,988 · App. 14/072,135 · Granted Dec 30, 2014

Fuel cell system

Inventor: Andreas Knoop (Esslingen, DE)
Assignee: Daimler AG
H01M8/04097H01M8/04089Y02E60/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,920,988
App. No.
14/072,135
Granted
Dec 30, 2014
Kind
B2
Abstract

The potential energy from a hydrogen tank is used in a gas jet pump, which draws in anode waste gas via an inlet and recirculates it to an anode inlet. To ensure that this system operates effectively even under low loads, a part of the waste gas is supplied to a compressor, and the compressed waste gas is supplied to the motive jet inlet of a gas jet pump, which may be the same one to which the hydrogen from the tank is also supplied. Different gas jet pumps may also be used, for the hydrogen from the tank on the one hand, and the compressed waste gas on the other hand.

Claims (22)

1. A fuel cell system, comprising:

a hydrogen tank containing hydrogen;

a fuel cell with an anode, the anode having an anode inlet and an anode outlet;

a gas jet pump having an outlet, a motive jet inlet and a second inlet, wherein the second inlet is separate from the motive jet inlet, the motive jet inlet includes a first motive jet inlet and a second motive jet inlet, and the outlet is coupled to the anode inlet;

a compressor; and

an anode recirculation line arranged to provide waste gas from the anode outlet to the anode inlet,

wherein the anode recirculation line includes a branch point to provide a first waste gas stream to the second inlet of the gas jet pump and a second, separate waste gas stream to the compressor,

wherein the compressor is coupled to the gas jet pump so that the second waste gas stream that is compressed by the compressor is provided to the motive jet inlet of the gas jet pump, and

wherein the second stream of compressed waste gas is supplied to the first motive jet inlet of the gas jet pump and hydrogen from the hydrogen tank is supplied to the second motive jet inlet of the gas jet pump.

2. The fuel cell system as claimed in claim 1 , wherein the compressor is structurally configured to operate using a 12 V voltage.

3. A fuel cell system, comprising:

a hydrogen tank containing hydrogen;

a fuel cell with an anode, the anode having an anode inlet and an anode outlet;

first and second gas jet pumps each having an outlet, a motive jet inlet and a second inlet, wherein each second inlet is separate from their respective motive jet inlets and each outlet is coupled to the anode inlet;

a compressor; and

an anode recirculation line arranged to provide waste gas from the anode outlet to the anode inlet,

wherein the anode recirculation line includes a branch point to provide a first waste gas stream to the second inlet of each of the gas jet pumps and a second, separate waste gas stream to the compressor,

wherein the compressor is coupled to the first gas jet pump so that the second waste gas stream that is compressed by the compressor is provided to the motive jet inlet of the first gas jet pump, and

wherein the hydrogen tank is coupled to the second gas jet pump so that the hydrogen from the hydrogen tank is supplied to the motive jet inlet of the second gas jet pump.

4. The fuel cell system as claimed in claim 3 , wherein both the first and second gas jet pumps have a nonreturn valve arranged between the outlet and the anode inlet.

5. The fuel cell system as claimed in claim 3 , wherein the first and second gas jet pumps are configured to operate mutually independently.

6. The fuel cell system as claimed in claim 5 , wherein the compressor is structurally configured to operate using a 12 V voltage.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2022
From: MERCEDES-BENZ GROUP AG
To: CELLCENTRIC GMBH & CO.KG
Reel/Frame 060663/0216 →
CHANGE OF NAME Recorded Jul 7, 2022
From: DAIMLER AG
To: MERCEDES-BENZ GROUP AG
Reel/Frame 060612/0408 →
Priority Claims (1)
DE 10 2008 014 783 · Mar 18, 2008 · national
Continuity (2)
Continuation 12933054
Related Publication 20140087278A1 · Mar 27, 2014