IP Library Granted Patent US 9,039,332
Granted Patent B2
US 9,039,332 · App. 13/977,175 · Granted May 26, 2015

Facilities for offshore liquefied natural gas floating storage with jack-up platform regasification unit

Inventors: Ki Ho Moon (Uijeongbu-si, KR); Kwang Ho Wi (Seoul, KR); Seong Min Yang (Busan, KR); Ho Joon Shin (Seongnam-si, KR); Su Hyuk An (Seoul, KR); Kil Hong Kim (Seongnam-si, KR); Heon Joong Jung (Seongnam-si, KR); Jae Hyuk Jang (Seoul, KR); Chul Jin Moon (Seoul, KR); Jae Heon Lee (Seoul, KR); Hyun Sang Cho (Seoul, KR); Sung Uk Lee (Seoul, KR)
Assignee: Samsung C&T Corporation
F17C7/04E02B17/00E02B2017/0073E02B17/021E02B2017/006F17C2221/033F17C2223/0161F17C2223/033F17C2225/0123F17C2225/035F17C2265/05F17C2270/0113F17C2270/0123
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,039,332
App. No.
13/977,175
Granted
May 26, 2015
Kind
B2
Abstract

Facilities for offshore liquefied natural gas (LNG) floating storage with jack-up platform regasification unit, the facilities including: a jack-up unit comprising legs which have bottom part to be fixable to a sea bed and top part to be exposed to a surface of water, and a hull to be movable up and down with respect to the legs; a storage unit moored at the jack-up unit providing a space for storing LNG; a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jack-up unit, separable from the jack-up unit; a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit.

Claims (25)

1. Facilities for offshore liquefied natural gas (LNG) floating storage with a jack-up platform regasification unit, the facilities comprising:

a jack-up unit comprising legs which have a bottom part to be fixable to a sea bed and a top part to be exposed to a surface of water, and a hull to be movable up and down with respect to the legs;

a storage unit moored at the jack-up unit providing a space for storing LNG;

a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jack-up unit, is separable from the jack-up unit;

a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and

a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit,

wherein the utility unit is implemented as a module to be separable from the jack-up unit.

2. The facilities of claim 1 , wherein the regasification unit uses an open rack vaporizer (ORV) using sea water for heat exchanger.

3. The facilities of claim 2 , wherein the sea water pump and a ballast water pump disposed in the storage unit are simultaneously used to supply sea water to the regasification unit.

4. The facilities of claim 1 , wherein a power facility, a steam generator, and a ballast water pump disposed in the storage unit are used to supply power, steam, and sea water, respectively, which are necessary for the regasification unit.

5. The facilities of claim 1 , wherein the storage unit is the LNG carrier or a floating storage unit (FSU).

6. Facilities for offshore liquefied natural gas (LNG) floating storage with a jack-up platform regasification unit, the facilities comprising:

a jack-up unit comprising legs which have a bottom part to be fixable to a sea bed and a top part to be exposed to a surface of water, and a hull to be movable up and down with respect to the legs;

a storage unit moored at the jack-up unit providing a space for storing LNG;

a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jack-up unit, is separable from the jack-up unit;

a utility unit comprising a power source and a sea water pump to supply power an sea water to the regasification unit; and

a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit,

wherein the storage unit is fixed to the jack-up unit and carries the LNG to the regasification unit.

7. Facilities for offshore liquefied natural gas (LNG) floating storage with a jack-up platform regasification unit, the facilities comprising:

a jack-up unit comprising legs which have a bottom part to be fixable to a sea bed and a top part to be exposed to a surface of water, and a hull to be movable up and down with respect to the legs;

a storage unit moored at the lack-up unit providing a space for storing LNG;

a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jack-up unit, is separable from the jack-up unit;

a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and

a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit,

wherein the storage unit is separable from the jack-up unit and movable to load LNG.

Assignments (4)
CHANGE OF NAME Recorded Jun 24, 2016
From: CHEIL INDUSTRIES, INC.
To: SAMSUNG C&T CORPORATION
Reel/Frame 039153/0961 →
MERGER AND CHANGE OF NAME Recorded Jun 20, 2016
From: SAMSUNG C&T CORPORATION; CHEIL INDUSTRIES, INC.
To: CHEIL INDUSTRIES, INC.
Reel/Frame 038951/0565 →
CHANGE OF NAME Recorded Jun 20, 2016
From: CHEIL INDUSTRIES, INC.
To: SAMSUNG C&T CORPORATION
Reel/Frame 039078/0441 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2013
From: MOON, KI HO; WI, KWANG HO; YANG, SEONG MIN; SHIN, HO JOON; AN, SU HYUK; KIM, KIL HONG; JUNG, HEON JOONG; JANG, JAE HYUK; MOON, CHUL JIN; LEE, JAE HEON; CHO, HYUN SANG; LEE, SUNG UK
To: SAMSUNG C&T CORPORATION
Reel/Frame 031154/0474 →
Priority Claims (1)
KR 10-2010-0139361 · Dec 30, 2010 · national
Continuity (1)
Related Publication 20130333397A1 · Dec 19, 2013