IP Library Granted Patent US 9,115,579
Granted Patent B2
US 9,115,579 · App. 13/629,114 · Granted Aug 25, 2015

Apparatus and method for downhole steam generation and enhanced oil recovery

Inventors: Fred Schneider (Calgary, CA); Lynn P Tessier (Eckville, CA)
Assignee: R.I.I. NORTH AMERICA INC
E21B43/243E21B36/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,115,579
App. No.
13/629,114
Granted
Aug 25, 2015
Kind
B2
Abstract

A burner is arranged for access to a cavity in a target zone of a hydrocarbon reservoir. The burner is operated into the cavity to create and sustain hot combustion gases at a steady state for flowing into and permeating through the target zone. Water is injected into the target zone and permeates laterally therein. The hot combustion gases and the water in the target zone interact to form a steam drive front in the hydrocarbon reservoir.

Claims (38)

1. A process for creating a drive front in a hydrocarbon reservoir for enhanced oil recovery comprising:

accessing a cavity within the hydrocarbon reservoir with a wellbore;

arranging a burner assembly in the wellbore uphole of the cavity;

creating hot combustion gases with the burner assembly, directing the hot combustion gases from the burner assembly into the cavity and sustaining hot combustion gases therein;

injecting water into the hydrocarbon reservoir uphole of the cavity, the water entering into and permeating into the hydrocarbon reservoir and interacting with the hot combustion gases therein for creating steam in the hydrocarbon reservoir; and

forming a steam drive front in the hydrocarbon reservoir.

2. The process of claim 1 further comprising artificially creating the cavity in the hydrocarbon reservoir.

3. The process of claim 2 wherein creating the artificially-created cavity comprises extending a combustion zone of the burner assembly into the cavity.

4. The process of claim 2 wherein creating the artificially-created cavity comprises forming an interface area between the hot combustion gases from the burner assembly and the hydrocarbon reservoir.

5. The process of claim 2 wherein creating the artificially-created cavity comprises mechanically-forming the cavity.

6. The process of claim 5 wherein creating the mechanically-created cavity comprises reaming the target zone.

7. The process of claim 5 wherein creating the mechanically-created cavity comprises

accessing the target zone with a wellbore;

running a reaming tool downhole of the wellbore; and

actuating the reaming tool and reaming the target zone to form the cavity.

8. The process of claim 2 wherein creating the artificially-created cavity comprises hydraulic washing of the target zone.

9. The process of claim 2 wherein creating the artificially-created cavity comprises

accessing the target zone with a wellbore;

running a washing tool downhole of the wellbore; and

actuating the washing tool for hydraulic washing the target zone to form the cavity.

10. The process of claim 2 wherein creating the artificially-created cavity comprises

reaming the hydrocarbon reservoir downhole of the wellbore; and

actuating a washing tool for hydraulic washing the reamed hydrocarbon reservoir to form the cavity.

11. The process of claim 2 wherein creating the artificially-created cavity comprises:

operating the burner assembly at a first condition for directing combustion into wellbore to form the cavity.

12. The process of claim 11 further comprising:

operating the burner assembly at a second condition for directing combustion into the created cavity to form the hot combustion gases.

13. The process of claim 1 wherein the cavity is a pre-existing cavity comprising:

accessing the pre-existing cavity with a wellbore; and

running the burner assembly down the wellbore to access the cavity.

14. The process of claim 13 wherein the pre-existing cavity is a naturally-forming cavity.

15. The process of claim 13 wherein the hydrocarbon reservoir is a Cold Heavy Oil Production with Sand (CHOPS) reservoir and prior to arranging the burner assembly comprising

producing from the wellbore and forming the pre-existing cavity in the hydrocarbon reservoir thereabout.

16. The process of claim 1 wherein injecting water into the hydrocarbon reservoir further comprises injecting water from a wellbore annulus between the burner assembly and the wellbore.

17. The process of claim 16 further comprising:

sealing the wellbore annulus with an annular seal at about the burner assembly; and wherein the injecting water from the annulus further comprises

injecting water into the target zone uphole of an annular seal.

18. The process of claim 1 wherein the burner assembly further comprises a shroud disposed at a downhole end of the burner assembly and surrounding a combustion zone thereof, and wherein the injecting water from the wellbore annulus further comprises injecting water into the hydrocarbon reservoir from about the shroud.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 26, 2021
From: R.I.I. NORTH AMERICA INC.
To: ESPRESSO CAPITAL LTD.
Reel/Frame 058213/0162 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2015
From: SCHNEIDER, FRED; TESSIER, LYNN P
To: RESOURCE INNOVATIONS INC.
Reel/Frame 036092/0203 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 10, 2014
From: RESOURCE INNOVATIONS INC.
To: R.I.I. NORTH AMERICA INC.
Reel/Frame 033932/0587 →
Continuity (3)
Continuation In Part 12687711 · Jan 14, 2010
Provisional Application 61560468 · Nov 16, 2011
Related Publication 20130020076A1 · Jan 24, 2013