Anchor line tensioning method

Inventor: Michael Macrae (Nice, FR)
Assignee: SINGLE BUOY MOORINGS INC.
B63B21/50B63B2021/505Y10T29/49826
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,340,261
App. No.
14/130,976
Granted
May 17, 2016
Kind
B2
Abstract

Method for mooring an offshore structure includes: providing a mooring line having one end connected to the sea bed and a connector at a free end; lifting the free end onto a deck of an anchor line handling vessel; connecting on the anchor line handling vessel a chain tensioner with a connection side to the connector; providing a working chain having a short tensioning part and a long installation part into the entry side of the chain tensioner; holding a free end of the installation part while lowering the chain tensioner below water level; picking up a free end of a pendant attached to the offshore structure, and attaching it to the free end of the installation part in an interconnect position on the anchor line handling vessel; placing the interconnect position overboard; connecting a lifting cable on the anchor line handling vessel to the tensioning part below water level; and exerting an upward tensioning force on the tensioning chain part.

Claims (19)

1. Anchor line installation method for mooring an offshore structure ( 1 ) to a mooring line ( 7 , 8 , 11 ) comprising the steps of:

providing a mooring line ( 11 ), with one end connected to a sea bed and comprising at a free end ( 13 , 15 ) a connector member ( 14 , 22 ),

lifting the free end ( 13 , 15 ) onto a deck of an anchor line handling vessel ( 12 ),

connecting on the anchor line handling vessel a chain tensioner ( 17 ) with a connection side ( 18 ) to the connector member ( 14 , 22 ),

providing a working chain ( 20 ) into the entry side ( 19 ) of the chain tensioner ( 17 ), the working chain having a tensioning chain part ( 28 ) and a installation chain part ( 21 ), the tensioning chain part being shorter than the installation chain part,

holding a free end of the installation chain part ( 21 ) connected to the anchor line handling vessel while lowering the chain tensioner ( 17 ) below water level ( 46 ),

picking up a free end of a pendant ( 32 ) attached on one end to the offshore structure that is to be moored, and attaching the free end of the pendant ( 32 ) to the free end of the installation chain part ( 21 ) in an interconnect position ( 52 ) on the anchor line handling vessel ( 12 ) and,

placing the interconnect position ( 52 ) overboard from the anchor handling vessel ( 12 ),

connecting a lifting cable ( 34 ) of a lifting device ( 33 ) on the anchor line handling vessel ( 12 ) to the tensioning chain part ( 28 ) below water level, and

Exerting an upward tensioning force on the tensioning chain part ( 28 ) via the lifting cable ( 34 ).

2. Method according to claim 1 , wherein an upward tensioning force on the tensioning chain part ( 28 ) is derived from operating the lifting device ( 33 ) on the anchor line handling vessel ( 12 ).

3. Method according to claim 1 , wherein the installation chain part ( 21 ) of the working chain ( 20 ) is at least 0.5 times the length of the pendant ( 32 ).

4. Method according to claim 1 , wherein the anchor line handling vessel ( 12 ) is connected to the offshore structure ( 1 ) in a holding point ( 53 ) via a holding line ( 57 ) that is connected to a pulling device ( 31 ) on the anchor line handling vessel, wherein an upward tensioning force is exerted on the tensioning chain part ( 28 ) by the pulling device ( 31 ) exerting a pulling force on the anchor line handling vessel ( 12 ) in the direction of the offshore structure ( 1 ) via the holding line ( 57 ).

5. Method according to claim 4 , wherein the length of the holding line ( 57 ) is shorter than a horizontal distance of the chain tensioner ( 17 ) from the holding point ( 53 ) such that the tensioning chain part ( 28 ) line extends substantially in line with the mooring line ( 11 ).

6. Method according to claim 4 , wherein the holding point ( 53 ) is situated above water level ( 46 ).

7. Method according to claim 6 , wherein the holding point ( 53 ) is situated substantially at the height of the anchor line handling vessel such that the holding line has a substantially horizontal orientation.

8. Method according to claim 1 , wherein the mooring line ( 11 ) is for its larger part made of a synthetic material.

9. Method according to claim 5 , wherein the holding point ( 53 ) is situated above water level ( 46 ).

10. Method according to claim 8 wherein the synthetic material comprises a polyester wire rope material.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 20, 2014
From: MACRAE, MICHAEL
To: SINGLE BUOY MOORINGS INC.
Reel/Frame 032251/0209 →
Priority Claims (1)
EP 11172920 · Jul 6, 2011 · regional
Continuity (1)
Related Publication 20140216323A1 · Aug 7, 2014