IP Library Granted Patent US 9,429,923
Granted Patent B2
US 9,429,923 · App. 13/515,644 · Granted Aug 30, 2016

HVAC control system and method

Inventors: John Ward (New South Wales, AU); Joshua Wall (New South Wales, AU); Glenn Platt (New South Wales, AU)
Assignee: Commonwealth Scientific and Industrial Research Organisation
G05B15/02G05D23/1917F24F2011/0057F24F2011/0091G05B2219/2642
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,429,923
App. No.
13/515,644
Granted
Aug 30, 2016
Kind
B2
Abstract

A method of controlling the heating, ventilation and air conditioning (HVAC) system of a building, the method comprising the steps of: (a) developing an initial thermal model of the building, and continuously updating the thermal model over time; (b) utilising the thermal model to continuously develop a daily HVAC operating plan for the building; and (c) continuously examining a current HVAC operating plan and optimising the alignment of the current HVAC operation with the current HVAC operating plan.

Claims (102)

1. A method of controlling the heating, ventilation and air conditioning (HVAC) system of a building, the method comprising the steps of:

(a) developing an initial thermal model of the building, and continuously updating this thermal model substantially daily;

(b) utilising the thermal model to continuously develop a daily HVAC operating plan for the building wherein the daily HVAC operating plan includes the aggregate impact of multiple heating/cooling sources on a series of zone temperatures in said building, with the daily HVAC operating plan being recalculated substantially every 5 minutes; and

(c) continuously examining a current HVAC operating plan and optimising the alignment of the current HVAC operation with the current HVAC operating plan substantially on the basis of seconds.

2. The method of claim 1 , wherein said thermal model utilises a series of parameters, fitted to historical thermal data for the building.

3. The method of claim 1 , wherein said thermal model is a piecewise polynomial model.

4. The method of claim 1 , wherein said optimising the alignment of said current HVAC operation with the current HVAC operating plan is attempted substantially every 10 seconds.

5. The method of claim 1 , wherein the thermal model has substantially the following form:

T

int

(

z

)

=

F

amb

(

z

)

T

amb

(

z

)

-

10

P

coolTyp

F

Pcool

(

z

)

P

cool

(

z

)

+

1

P

heatTyp

F

Pheat

(

z

)

P

heat

(

z

)

+

B

(

z

)

Where:

T int (z) is an average internal building temperature;

T amb (z) is an ambient temperature;

P cool (z) is a HVAC cooling power consumption;

P coolTyp is a typical HVAC cooling power consumption;

P heat (z) is a HVAC heating power consumption;

P heatTyp is a typical HVAC heating power consumption;

F amb (z) captures an internal building temperature response to the ambient temperature;

F Pcool (z) captures an internal building temperature response to the HVAC cooling power consumption;

F Pheat (z) captures an internal building temperature response to HVAC heating power consumption;

B(z) is a baseline fucntion and captures factors other than those captured by F amb (z), F Pcool (z) and F Pheat (z); and

10 is a scaling factor.

6. The method of claim 5 , wherein the baseline function changes depending on the day of the week.

7. The method of claim 6 , wherein the baseline function is formed of a combination of triangular basis functions that are estimated at specific fixed points throughout a day.

8. The method of claim 1 , wherein said optimising the alignment of the current HVAC operation with the current HVAC operating plan is attempted substantially in increments of seconds.

9. The method of claim 1 , wherein the thermal model has substantially the following form:

T z = F A ( s )· T Amb +Baseline Fcn−F T ( s )·Δ T SS

where:

T z is a modelled aggregate zone temperature;

T Amb is an outside ambient air temperature;

ΔT ss is a steady state difference in zone temperature that would result from the current HVAC cooling and heating powers;

BaselineFcn is a learnt function of time, accounting for at least one of people, equipment, or sun;

F A (s) and F T (s) are linear time invariant filters, accounting for system dynamics.

10. The method of claim 9 , wherein ΔT ss has the form of an equation:

Δ T ss =∝ c ·μ c ·max{0 ,P cool −P cb }−∝ h ·μ h ·max{0 ,P Heat −P hb }

where:

the first part of the equation is an effective cooling temperature (ΔT cool );

the second part of the equation is an effective heating temperature (ΔT Heat );

P cool and P Heat are estimates of actual cooling power and actual heating power, respectively;

P cb and P hb are baseline cooling power and actual heating power, respectively;

∝ c , and ∝ h are nominal scaling for HVAC power effectiveness; and

μ c and μ h are HVAC efficiency de-ratings as a function of external temperature.

Assignments (2)
SECURITY AGREEMENT Recorded Sep 14, 2012
From: BUILDINGIQ PTY LIMITED
To: ONEVENTURES INNOVATION FUND LP
Reel/Frame 028973/0847 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 18, 2012
From: WARD, JOHN; WALL, JOSHUA; PLATT, GLENN
To: COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANISATION
Reel/Frame 028392/0022 →
Priority Claims (1)
AU 2009906122 · Dec 16, 2009 · national
Continuity (1)
Related Publication 20120259469A1 · Oct 11, 2012