IP Library › Granted Patent US 9,539,767
Granted Patent B2
US 9,539,767 · App. 14/561,900 · Granted Jan 10, 2017

Forming of staged thermoset composite materials

Inventor: Geoffrey A. Butler (Seattle, WA)
Assignee: The Boeing Company
B29C70/30B29C35/02B29C35/0222B29C35/0288B29C70/44B29C73/10B29C73/12B29C66/73754B29K2105/243
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,539,767
App. No.
14/561,900
Granted
Jan 10, 2017
Kind
B2
Abstract

A method of forming a composite article may include initially curing a composite laminate at an initial temperature to an initial cure stage of 30-50 percent of full cure and beyond a gel point to form an initially-cured composite laminate. The method may initially include heating the initially-cured composite laminate to an intermediate temperature higher than the initial temperature and above a resin glass transition temperature. In addition, the method may include intermediately curing the composite laminate to an intermediate cure stage of 50-70 percent of full cure while on a final forming tool to form an intermediately-cured composite laminate. Furthermore, the method may include removing the intermediately-cured composite laminate from the final forming tool, and finally curing the intermediately-cured composite laminate at a final temperature higher than the intermediate temperature to a final cure stage.

Claims (54)

1. A method of forming a composite article, comprising:

initially curing a composite laminate at an initial temperature to an initial cure stage of 30-50 percent of full cure and beyond a gel point to form an initially-cured composite laminate;

heating the initially-cured composite laminate to an intermediate temperature higher than the initial temperature and above a resin glass transition temperature;

intermediately curing the composite laminate to an intermediate cure stage of 50-70 percent of full cure while on a final forming tool to form an intermediately-cured composite laminate;

removing the intermediately-cured composite laminate from the final forming tool; and

finally curing the intermediately-cured composite laminate at a final temperature higher than the intermediate temperature to a final cure stage.

2. The method of claim 1 , further including the step of:

laying up the composite laminate on a flat initial forming tool prior to initially curing the composite laminate.

3. The method of claim 1 , further including the step of:

laying up multiple plies of thermoset prepreg to form the composite laminate prior to initially curing the composite laminate.

4. The method of claim 1 , further including the step of:

laying up multiple plies of dry fiber; and

infusing the plies with resin to form the composite laminate prior to initially curing the composite laminate.

5. The method of claim 1 , further including the step of:

consolidating the composite laminate prior to and/or during the initially curing of the composite laminate.

6. The method of claim 5 , wherein the step of consolidating includes:

consolidating the composite laminate with vacuum pressure applied by a bagging assembly.

7. The method of claim 1 , further including the step of:

trimming the initially-cured composite laminate into a perimeter shape prior to intermediately curing the composite laminate.

8. The method of claim 1 , wherein the step of heating the initially-cured composite laminate to the intermediate temperature comprises:

heating the initially-cured composite laminate to at least approximately 20 degrees F. above the resin glass transition temperature.

9. The method of claim 1 , wherein the step of initially curing the composite laminate comprises:

initially curing the composite laminate to approximately 40 percent of full cure.

10. The method of claim 1 , wherein the step of intermediately curing the composite laminate comprises:

intermediately curing the composite laminate to 60 percent of full cure.

11. A method of reworking an existing composite structure, comprising:

heating a thermoset composite laminate to an initial temperature for an initial dwell time period;

initially curing the composite laminate at the initial temperature to an initial cure stage of 30-50 percent of full cure and beyond a gel point to form an initially-cured composite laminate;

heating the initially-cured composite laminate to a temperature higher than the initial temperature and above a resin glass transition temperature;

forming the initially-cured composite laminate at the higher temperature to a contour of an existing composite structure; and

finally curing the composite laminate at the higher temperature to a final cure stage with the composite laminate conformed and joined to the contour of the existing composite structure.

12. The method of claim 11 , wherein the step of heating the composite laminate to the temperature higher than the initial temperature and finally curing the composite laminate includes:

heating the composite laminate to an intermediate temperature and holding for an intermediate dwell time during forming of the composite laminate to the contour; and

directly ramping from the intermediate temperature to a final temperature above the intermediate temperature to finally cure the composite laminate.

13. The method of claim 11 , further including the step of:

consolidating the composite laminate prior to and/or during the initially curing of the composite laminate.

14. The method of claim 13 , wherein the step of consolidating includes:

consolidating the composite laminate with vacuum pressure applied by a bagging assembly.

15. The method of claim 11 , wherein the step of initially curing the composite laminate comprises:

initially curing the composite laminate to approximately 40 percent of full cure.

16. The method of claim 11 , further including the step of:

trimming the initially-cured composite laminate into a perimeter shape to form a patch complementary to a rework area of the existing composite structure.

17. The method of claim 16 , wherein the step of trimming the initially-cured composite laminate into a patch includes:

machining an edge treatment onto a perimeter edge of the patch to match a scarf angle formed in the rework area of the existing composite structure.

18. The method of claim 11 , wherein the step of heating the initially-cured composite laminate comprises:

heating the initially-cured composite laminate to at least approximately 20 degrees F. above the resin glass transition temperature.

19. The method of claim 11 , further including the step of:

laying up multiple plies of thermoset prepreg to form the composite laminate prior to initially curing the composite laminate.

20. A method of reworking an existing composite structure, comprising:

heating a composite laminate to an initial temperature;

initially curing the composite laminate at the initial temperature to an initial cure stage of 30-50 percent of full cure and beyond a gel point to form an initially-cured composite laminate;

heating the composite laminate to an intermediate temperature and holding for an intermediate dwell time while forming to a contour of the existing composite structure;

ramping up the temperature of the composite laminate from the intermediate temperature to a final temperature above the intermediate temperature and holding for a final dwell time; and

finally curing the composite laminate at the final temperature to a final cure stage while bonding to the existing composite structure during the final dwell time.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 5, 2014
From: BUTLER, GEOFFREY A.
To: THE BOEING COMPANY
Reel/Frame 034392/0192 →
Continuity (1)
Related Publication 20160159057A1 · Jun 9, 2016