IP Library › Granted Patent US 9,587,395
Granted Patent B2
US 9,587,395 · App. 14/543,040 · Granted Mar 7, 2017

Housing manufacturing system and facility

Inventors: Peter Gilgan (Oakville, CA); Jurgen Dirks (Oakville, CA); William Meevis (Brantford, CA); Walter Mitchell (Richmond Hill, CA); Peter Vohsemer (Galt, CA)
Assignee: The Mattamy Corporation
E04B1/35B60P3/00E04B2001/3577Y10T29/49623Y10T29/49625Y10T29/49627Y10T29/49629Y10T29/49829Y10T29/5191Y10T29/534Y10T29/53365Y10T29/53435Y10T29/53539Y10T29/53548
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,587,395
App. No.
14/543,040
Granted
Mar 7, 2017
Kind
B2
Abstract

A system for manufacturing homes is provided. An embodiment includes a sub-assembly plant for assembling planar sections of a home according to production schedule for custom homes. The embodiment also includes at least one final assembly facility located proximal to a subdivision where a plurality of the custom homes are to be situated. The final assembly facility is for receiving the planar sections from the sub-assembly plant and for constructing the homes from planar portions according to the production schedule.

Claims (21)

1. A system for manufacturing homes comprising:

a sub-assembly plant for assembling planar sections of a home according to a production schedule for custom homes; and,

at least one final assembly facility located proximal to a subdivision where a plurality of said custom homes are to be situated; said final assembly facility comprising:

a crane section for receiving said planar sections from said sub-assembly plant for assembly of a home within said crane section from said planar sections according to said production schedule;

a final assembly section connected to said crane section at a first end and having an output port at a second end opposite said first end; said final assembly section containing a plurality of stations arranged from said first end to said second end, configured to receive said home from said crane section, to further finish said home and discharge said home from said output port.

2. The system of claim 1 wherein said planar sections include at least one of floor and walls.

3. The system of claim 1 wherein said sub-assembly plant includes an assembly line for producing at least a portion of said planar sections.

4. The system of claim 1 wherein said sub-assembly plant includes at least one of a framing station; a drywall application station; a mechanical services station; an insulation station and a covering station.

5. The system of claim 4 wherein the insulation station comprises an injector and a flowable closed cell foam dispenser for injecting said foam into a cavity defined by a frame and a drywall covering of said frame.

6. The system of claim 1 wherein planar sections comprise wall sections that are provided with a plurality of removable hangers.

7. The system of claim 6 wherein a truck for transporting said wall sections includes an overhead rail for receiving said hangers.

8. The system of claim 7 wherein said truck includes a plurality of floor rails, one said floor rail corresponding to each said overhead rail.

9. The system of claim 8 wherein said floor rails are complementary to a skate and wherein a plurality of a skates can be used to move each said wall section.

10. The system of claim 1 wherein the final assembly facility is movable.

11. The system of claim 1 wherein the crane section of the final assembly facility includes at least one area for building a roof for each said home and an overhead crane for placing said roof on said home according to said production schedule prior to said receiving of said home by said plurality of stations.

12. The system of claim 1 wherein each home in said production schedule is different.

13. A final assembly facility comprising:

a crane section for receiving planar sections and assembling said planar sections into a home according to a production schedule for custom homes; said planar sections received at said crane section from a sub-assembly plant that assembles said planar sections;

a final assembly section connected to said crane section at a first end and having an output port at a second end opposite said first end; said final assembly section containing a plurality of stations arranged from said first end to said second end, configured to receive said home from said crane section to further finish said home and discharge said home from said output port;

said final assembly facility located proximal to a subdivision where a plurality of said custom homes are to be situated.

14. The final assembly plant of claim 13 wherein the facility is movable.

Assignments (2)
MERGER AND CHANGE OF NAME Recorded Feb 11, 2026
From: MATTAMY CORPORATION, THE; MATTAMY HOMES LIMITED
To: MATTAMY HOMES LIMITED
Reel/Frame 074750/0823 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2014
From: DIRKS, JURGEN; GILGAN, PETER; MEEVIS, WILLIAM; MITCHELL, WALTER; VOHSEMER, PETER
To: THE MATTAMY CORPORATION
Reel/Frame 034187/0874 →
Priority Claims (1)
CA 2563187 · Oct 11, 2006 · national
Continuity (4)
Continuation 12900724 · Oct 8, 2010
Continuation 11852204 · Sep 7, 2007
Continuation In Part 11675938 · Feb 16, 2007
Related Publication 20150068005A1 · Mar 12, 2015