US 9,638,171 · App. 13/980,476 · Granted May 2, 2017

System and methods for controlling wind turbine

Inventors: Xiongzhe Huang (Shanghai, CN); Danian Zheng (Simpsonville, SC); Wei Xiong (Sichuan, CN)
Assignee: General Electric Company
F03D7/0276F05B2270/32F05B2270/322F05B2270/404F05B2270/8042Y02E10/723
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,638,171
App. No.
13/980,476
Granted
May 2, 2017
Kind
B2
Abstract

A method of operating a wind turbine is provided. The wind turbine includes a rotor that is rotatably coupled to a generator that is positioned within a nacelle. The rotor includes one or more rotor blades that are coupled to a hub. The method includes transmitting, from a first sensor to a control system, at least a first monitoring signal indicative of a first wind condition at a first distance from the wind turbine. A second sensor transmits at least a second monitoring signal that is indicative of a second wind condition at a second distance from the wind turbine that is longer than the first distance to the control system. The control system calculates a wind turbine operating command based at least in part on the first monitoring signal and the second monitoring signal. One or more wind turbine components are operated based on the calculated wind turbine operating command.

Claims (64)

1. A method of operating a wind turbine, the wind turbine including a rotor rotatably coupled to a generator positioned within a nacelle, the rotor including one or more rotor blades coupled to a hub, said method comprising:

transmitting, from a first sensor to a control system, at least a first monitoring signal indicative of a first wind condition at a first distance from the wind turbine;

calculating a first generator torque command based on the first monitoring signal;

transmitting, from a second sensor to the control system, at least a second monitoring signal indicative of a second wind condition at a second distance from the wind turbine that is longer than the first distance;

calculating a second generator torque command based on the second monitoring signal;

calculating, by the control system, a collective generator torque command based on the first generator torque command and the second generator torque command; and,

operating one or more wind turbine components based on the calculated collective generator torque command.

2. A method in accordance with claim 1 , further comprising:

calculating a first wind turbine operating command based at least in part on the first monitoring signal to facilitate increasing a performance of the wind turbine;

calculating a second wind turbine operating command based at least in part on the second monitoring signal to facilitate reducing an overspeed of the wind turbine; and,

calculating the collective wind turbine operating command based at least in part on the calculated first wind turbine operating command and the calculated second wind turbine operating command.

3. A method in accordance with claim 2 , further comprising calculating the second wind turbine operating command signal when the second wind condition is different than a predefined wind condition.

4. A method in accordance with claim 1 , further comprising sensing a first wind condition and a second wind condition with one or more light detection and ranging (LIDAR) devices.

5. A method in accordance with claim 1 , wherein the wind condition includes one of a wind speed, a wind direction, a wind turbulence intensity, and a wind gust.

6. A method in accordance with claim 1 , wherein the wind turbine includes a pitch control system coupled to at least one rotor blade, said method further comprises:

calculating a first blade pitch command based at least in part on the first monitoring signal;

calculating a second blade pitch command based at least in part on the second monitoring signal;

calculating a collective blade pitch command based at least in part on the calculated first blade pitch command and the calculated second blade pitch command; and,

operating the pitch control system to adjust the pitch of the rotor blade based on the calculated collective blade pitch command.

7. A method in accordance with claim 1 , further comprising

operating the generator to adjust an air-gap torque of the generator based on the calculated collective generator torque command.

8. A wind turbine control system for use with a wind turbine, the wind turbine including a rotor rotatably coupled to a generator positioned within a nacelle, the rotor including one or more rotor blades coupled to a hub, said wind turbine control system comprising:

a first sensor configured to sense a first wind condition at a first distance from the wind turbine;

a second sensor configured to sense a second wind condition at a second distance from the wind turbine that is longer than the first distance; and,

a controller coupled to said first sensor and said second sensor, said controller configured to:

calculate a first generator torque command based on the sensed first wind condition;

calculate a second generator torque command based on the sensed second wind condition; and,

calculate a collective generator torque command based on the first generator torque command and the second generator torque command; and,

operate one or more wind turbine components based on the calculated collective generator torque command.

9. A wind turbine control system in accordance with claim 8 , wherein said wind turbine includes a pitch control system coupled to at least one rotor blade, said controller coupled to said pitch control system and configured to:

calculate a blade pitch command based at least in part on the sensed first wind condition and the sensed second wind condition; and,

adjust the pitch of the rotor blade based on the calculated blade pitch command.

10. A wind turbine control system in accordance with claim 9 , wherein said controller is further configured to:

calculate a first blade pitch command based at least in part on the sensed first wind condition;

calculate a second blade pitch command based at least in part on the sensed second wind condition; and,

calculate a collective blade pitch command based at least in part on the calculated first blade pitch command and the calculated second blade pitch command.

11. A wind turbine control system in accordance with claim 8 , wherein said controller is coupled to the generator and is configured to

adjust an air-gap torque of the generator based on the calculated generator torque command.

12. A wind turbine control system in accordance with claim 8 , wherein each of said first sensor and said second sensor comprises at least one of light detection and ranging (LIDAR) device, a radio detention and ranging (RADAR) device, and a sonic detection and ranging (SODAR) device.

13. A wind turbine control system in accordance with claim 8 , wherein the wind condition includes at least one of a wind speed, a wind direction, a wind turbulence intensity, and a wind gust.

14. A wind turbine system, comprising:

a tower;

a nacelle coupled to said tower;

a generator positioned within said nacelle;

a rotor coupled to said generator with a rotor shaft;

at least one rotor blade coupled to said rotor; and,

a wind turbine control system comprising:

a first sensor configured to sense a first wind condition at a first distance from the wind turbine;

a second sensor configured to sense a second wind condition at a second distance from the wind turbine that is longer than the first distance; and,

a controller coupled to said first sensor and said second sensor, said controller configured to:

calculate a first generator torque command based on the sensed first wind Condition;

calculate a second generator torque command based on the sensed second wind condition; and,

calculate a collective generator torque command based on the first generator torque command and the second generator torque command; and,

operate one or more wind turbine components based on the calculated collective generator torque command.

15. A wind turbine system in accordance with claim 14 , wherein each of said first sensor and said second sensor comprises at least one of a LIDAR device, a RADAR device, and a SODAR device.

16. A wind turbine system in accordance with claim 14 , further comprising a pitch control system coupled to said at least one rotor blade, said controller coupled to said pitch control system and configured to:

calculate a blade pitch command based at least in part on the sensed first wind condition and the sensed second wind condition; and,

adjust the pitch of the rotor blade based on the calculated blade pitch command.

17. A wind turbine system in accordance with claim 16 , wherein said controller is further configured to:

calculate a first blade pitch command based at least in part on the sensed first wind condition;

calculate a second blade pitch command based at least in part on the sensed second wind condition; and,

calculate a collective blade pitch command based at least in part on the calculated first blade pitch command and the calculated second blade pitch command.

18. A wind turbine system in accordance with claim 14 , wherein said controller is coupled to said generator and is configured to

adjust an air-gap torque of the generator based on the calculated generator torque command.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE LEAD INVENTORS NAME PREVIOUSLY RECORDED ON REEL 030827 FRAME 0656. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT IS ATTACHED AND THE CORRECTION IS MADE ON PAGE 1 OF 8.. Recorded Nov 22, 2013
From: HUANG, XIONGZHE; ZHENG, DANIAN; XIONG, WEI
To: GENERAL ELECTRIC COMPANY
Reel/Frame 031694/0842 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2013
From: XIONGZHE, HUANG; ZHENG, DANIAN; XIONG, WEI
To: GENERAL ELECTRIC COMPANY
Reel/Frame 030827/0656 →
Continuity (1)
Related Publication 20130297085A1 · Nov 7, 2013