IP Library Granted Patent US 9,884,356
Granted Patent B2
US 9,884,356 · App. 14/422,729 · Granted Feb 6, 2018

Wire drawing method

Inventors: Arnaud Verleene (Clermont-Ferrand, FR); Sébastien Noel (Clermont-Ferrand, FR)
Assignee: COMPAGNIE GENERALE DES ESTABLISSEMENTS MICHELIN
B21C1/04B21C1/003B21C9/00B21C37/045B21F19/00D07B1/066B60C9/0007B60C2009/0475B60C2009/2074B60C2009/2077
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,884,356
App. No.
14/422,729
Granted
Feb 6, 2018
Kind
B2
Abstract

A process for drawing a steel wire, in which the wire has a carbon content by weight C of 0.4%≦C≦0.74%, includes an uninterrupted series of drawing steps. The drawing steps draw the wire from a diameter d′ to a diameter d, with d′ and d being expressed in mm, and with a true strain ε′ of the steel wire being given by ε′=2×ln(d′/d), with ε′>4.

Claims (31)

1. A process for drawing a steel wire, the process comprising steps of:

providing a steel wire having a carbon content by weight C of 0.4%≦C<0.5%;

preliminarily drawing the steel wire in an uninterrupted series of preliminary drawing procedures to draw the steel wire from a diameter D to a diameter d′; and

drawing the steel wire in an uninterrupted series of drawing procedures, such that the steel wire is drawn from the diameter d′ to a diameter d,

wherein D is the diameter of the steel wire immediately before a first preliminary drawing procedure of the uninterrupted series of preliminary drawing procedures,

wherein d′ is the diameter of the steel wire immediately after a last preliminary drawing procedure of the uninterrupted series of preliminary drawing procedures and immediately before a first drawing procedure of the uninterrupted series of drawing procedures,

wherein d is the diameter of the steel wire immediately after a last drawing procedure of the uninterrupted series of drawing procedures,

wherein D, d′, and d are expressed in mm,

wherein a true strain ε′ of the steel wire is given by ε′=2×ln(d′/d), with ε′>4, and

wherein a total true strain εT of the steel wire is given by εT=2×ln(D/d), with εT≧6.75.

2. The process according to claim 1 , wherein ε′≧4.3.

3. The process according to claim 2 , wherein ε′≧4.5.

4. The process according to claim 3 , wherein ε′≧4.7.

5. The process according to claim 1 , wherein d′ is greater than or equal to 1 mm.

6. The process according to claim 1 , wherein d′ is less than or equal to 2.2 mm.

7. The process according to claim 1 , wherein d is greater than or equal to 0.10 mm.

8. The process according to claim 1 , wherein d is less than or equal to 0.25 mm.

9. The process according to claim 1 , wherein a microstructure of the steel wire is ferritic-pearlitic or pearlitic.

10. The process according to claim 1 , wherein the uninterrupted series of drawing procedures is carried out in a wet environment.

11. The process according to claim 1 , wherein a true strain ε of the preliminarily drawn steel wire is given by ε=2×ln(D/d′), with ε≦3.

12. The process according to claim 11 , wherein ε≦2.75.

13. The process according to claim 12 , wherein ε≦2.5.

14. The process according to claim 1 , wherein the uninterrupted series of preliminary drawing procedures is carried out in a dry environment.

15. The process according to claim 1 , wherein εT≧7.

16. The process according to claim 1 , wherein D is greater than or equal to 4 mm.

17. The process according to claim 1 , further comprising a step of, before the step of drawing the steel wire from the diameter d′ to the diameter d, heat treating the steel wire having the diameter d′.

18. The process according to claim 1 , further comprising a step of, before the step of drawing the steel wire from the diameter d′ to the diameter d, coating the steel wire having the diameter d′ with at least one metal layer.

19. The process according to claim 1 , wherein, after the drawing step, a maximum tensile strength of the steel wire is equal to or greater than 2950 MPa.

20. The process according to claim 1 , wherein, after the drawing step, a maximum tensile strength of the steel wire is in a range of from 2950 MPa to 3660 MPa.

21. The process according to claim 1 , wherein, in the step of providing the steel wire, the steel wire has a carbon content by weight C of 0.4%≦C≦0.48%.

22. The process according to claim 1 , wherein, in the step of providing the steel wire, the steel wire has a carbon content by weight C of 0.42%≦C≦0.48%.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 8, 2017
From: MICHELIN RECHERCHE ET TECHNIQUE S.A.
To: COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN
Reel/Frame 044069/0303 →
CORRECTIVE ASSIGNMENT TO ADD THE OMISSION OF THE SECOND ASSIGNEE'S DATA PREVIOUSLY RECORDED ON REEL 038075 FRAME 0227. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jul 28, 2017
From: VERLEENE, ARNAUD; NOEL, SÉBASTIEN
To: COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN; MICHELIN RECHERCHE ET TECHNIQUE S.A.
Reel/Frame 043364/0413 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2016
From: VERLEENE, ARNAUD; NOEL, SÉBASTIEN
To: COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN
Reel/Frame 038075/0227 →
Priority Claims (1)
FR 12 58399 · Sep 7, 2012 · national
Continuity (1)
Related Publication 20150239294A1 · Aug 27, 2015