IP Library Granted Patent US 9,888,447
Granted Patent B2
US 9,888,447 · App. 15/139,849 · Granted Feb 6, 2018

Base station

Inventors: Masato Fujishiro (Yokohama, JP); Chiharu Yamazaki (Tokyo, JP)
Assignee: KYOCERA Corporation
H04W52/346H04W16/28H04W52/143H04W52/243H04W52/34H04W52/40H04W52/46H04W52/54H04W72/1226H04B7/024H04W92/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,888,447
App. No.
15/139,849
Granted
Feb 6, 2018
Kind
B2
Abstract

A base station includes: a controller configured to perform Coordinated Multi-Point (CoMP) communication with a user terminal; and a transmitter configured to transmit, to a neighbor base station, transmission power information that indicates restriction of downlink transmission power related to the CoMP communication. The transmission power information comprises: a threshold; a bit string that indicates, for each resource block, whether the downlink transmission power exceeds the threshold; and start subframe information that indicates a start subframe at which the restriction becomes valid.

Claims (46)

1. A base station comprising:

a controller configured to perform Coordinated Multi-Point (CoMP) communication with a user terminal using a radio frame configuration including a plurality of subframes arranged in a time domain, wherein each subframe has a subframe number, and each subframe includes a plurality of resource blocks arranged in a frequency domain; and

a transmitter configured to transmit, to a neighbor base station, a single message that indicates restriction of downlink transmission power of the base station in the CoMP communication, the restriction being a frequency domain restriction in which the downlink transmission power is restricted per resource block, wherein

the single message comprises:

restriction information including:

a threshold value; and

a bit string that indicates, for each resource block, whether the downlink transmission power exceeds the threshold value; and

subframe information including:

a start subframe number, selected from among the plurality of subframes, at which the frequency domain restriction, as indicated by the bit string, becomes valid; and

subframe period information indicating a period of subframes over which the frequency domain restriction is active, including the start subframe number, such that the valid time of the frequency domain restriction can be known by the neighbor base station, and

wherein the single message is configured to cause the neighbor base station to perform scheduling upon receiving the single message.

2. The base station according to claim 1 , wherein the controller is further configured to start the frequency domain restriction indicated by the single message at a subframe indicated by the subframe number.

3. A base station using a radio frame configuration including a plurality of subframes arranged in a time domain, wherein each subframe has a subframe number, and each subframe includes a plurality of resource blocks arranged in a frequency domain, the base station comprising:

a receiver configured to receive, from a neighbor base station performing Coordinated Multi-Point (CoMP) communication with a user terminal, a single message that restriction of downlink transmission power of the base station in the CoMP communication, the restriction being a frequency domain restriction in which the downlink transmission power is restricted per resource block, wherein

the single message comprises:

restriction information including:

a threshold value; and

a bit string that indicates, for each resource block, whether the downlink transmission power exceeds the threshold value; and

subframe information including:

a start subframe number, selected from among the plurality of subframes, at which the frequency domain restriction, as indicated by the bit string, becomes valid; and

subframe period information indicating a period of subframes over which the frequency domain restriction is active, including the start subframe number, such that the valid time of the frequency domain restriction can be known by the neighbor base station, and

a controller configured to perform scheduling based on the single message, wherein the controller determines that the frequency domain restriction becomes valid starting from the start subframe.

4. The base station according to claim 3 , wherein the controller is further configured to start using the threshold value and the bit string at a subframe indicated by the subframe number.

5. A chipset to be equipped in a base station, comprising:

a processor and a memory, the processor configured to execute instructions stored in the memory to perform processes of:

performing Coordinated Multi-Point (CoMP) communication with a user terminal using a radio frame configuration including a plurality of subframes arranged in a time domain, wherein each subframe has a subframe number, and each subframe includes a plurality of resource blocks arranged in a frequency domain; and

transmitting, to a neighbor base station, a single message that indicates restriction of downlink transmission power of the base station in the CoMP communication, the frequency domain restriction being a frequency domain restriction in which the downlink transmission power is restricted per resource block, wherein

the single message comprises:

restriction information including:

a threshold value; and

a bit string that indicates, for each resource block, whether the downlink transmission power exceeds the threshold value; and

subframe information including:

a start subframe number, selected from among the plurality of subframes, at which the frequency domain restriction, as indicated by the bit string, becomes valid; and

subframe period information indicating a period of subframes over which the frequency domain restriction is active, including the start subframe number, such that the valid time of the frequency domain restriction can be known by the neighbor base station, and

wherein the single message is configured to cause the neighbor base station to perform scheduling upon receiving the single message.

6. A chipset to be equipped in a base station using a radio frame configuration including a plurality of subframes arranged in a time domain, wherein each subframe has a subframe number, and each subframe includes a plurality of resource blocks arranged in a frequency domain, the chipset comprising:

a processor and a memory, the processor configured to execute instructions stored in the memory to perform processes of:

receiving, from a neighbor base station performing Coordinated Multi-Point (CoMP) communication with a user terminal, a single message that indicates restriction of downlink transmission power of the base station in the CoMP communication, the restriction being a frequency domain restriction in which the downlink transmission power is restricted per resource block, wherein

the single message comprises:

restriction information including:

a threshold value; and

a bit string that indicates, for each resource block, whether the downlink transmission power exceeds the threshold value; and

subframe information including:

a start subframe number, selected from among the plurality of subframes, at which the frequency domain restriction, as indicated by the bit string, becomes valid; and

subframe period information indicating a period of subframes over which the frequency domain restriction is active, including the start subframe number, such that the valid time of the frequency domain restriction can be known by the neighbor base station, and

performing scheduling based on the single message, wherein the processor determines that the frequency domain restriction becomes valid starting from the start subframe.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2016
From: FUJISHIRO, MASATO; YAMAZAKI, CHIHARU
To: KYOCERA CORPORATION
Reel/Frame 038395/0159 →
Priority Claims (1)
JP 2013-224773 · Oct 29, 2013 · national
Continuity (2)
Continuation PCTJP2014078243 · Oct 23, 2014
Related Publication 20160242126A1 · Aug 18, 2016