IP Library › Granted Patent US 9,925,690
Granted Patent B2
US 9,925,690 · App. 15/505,500 · Granted Mar 27, 2018

Chute for cement truck and method of fabricating a chute for a cement truck

Inventor: Sylvain Morrissette (Sherbrooke, CA)
Assignee: GROUPE PPD INC.
B28C5/4248B28C5/0818B65G11/026B65G11/186
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,925,690
App. No.
15/505,500
Granted
Mar 27, 2018
Kind
B2
Abstract

A chute assembly for directing cement from a cement truck is disclosed. The chute comprises an elongate chute of generally u-shaped cross section fabricated from UHMWPe and comprising an upper end and a lower end, a plurality of reinforcing rods arranged along a length of and encased within the UHMWPe, one end of each of the rods adjacent the upper end and another end of each of the rods adjacent the lower end, a pair of u-shaped collars, an upper one of the collars adjacent the upper end and a lower one of the collars adjacent the lower end, and a fastener for securing each of the collars to their respective rod ends. A method of fabrication is also disclosed.

Claims (12)

1. A chute assembly for directing cement from a cement truck comprising:

an elongate chute of generally u-shaped cross section fabricated from UHMWPe and comprising an upper end and a lower end;

a plurality of reinforcing rods arranged along a length of and encased within said UHMWPe, one end of each of said rods adjacent said upper end and another end of each of said rods adjacent said lower end;

a pair of u-shaped collars, an upper one of said collars adjacent said upper end and a lower one of said collars adjacent said lower end; and

a fastener for securing each of said collars to their respective rod ends.

2. The chute assembly of claim 1 , wherein at least said upper one of said collars comprises a hook at either end adapted for attachment to the cement truck.

3. The chute assembly of claim 1 , wherein a pair of said rods are arranged adjacent respective long edges of said elongate chute and a third of said rods is arranged at a bottom of said chute.

4. The chute assembly of claim 1 , wherein said elongate chute is tapered.

5. The chute assembly of claim 1 , comprising three of said reinforcing rods.

6. The chute assembly of claim 1 , wherein each of said collars is manufactured from aluminium.

7. The chute assembly of claim 1 , wherein said reinforcing rods are manufactured from stainless steel.

8. The chute assembly of claim 1 , wherein each end of said rods comprises a threaded bore and said fastener comprises a bolt and washer.

Assignments (2)
SECURITY INTEREST Recorded Mar 10, 2023
From: GROUPE PPD INC.
To: NATIONAL BANK OF CANADA
Reel/Frame 062943/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Jun 29, 2017
From: MORRISSETTE, SYLVAIN
To: GROUPE PPD INC.
Reel/Frame 042867/0005 →
Continuity (2)
Provisional Application 62045250 · Sep 3, 2014
Related Publication 20170266843A1 · Sep 21, 2017