IP Library › Granted Patent US 9,942,421
Granted Patent B2
US 9,942,421 · App. 15/412,164 · Granted Apr 10, 2018

Information processing system, information processing method, and computer program product

Inventors: Shunsuke Hayashi (Kanagawa, JP); Takenori Oku (Saitama, JP); Satoshi Mizuno (Tokyo, JP)
Assignee: Ricoh Company, Ltd.
H04N1/00344H04N1/00323H04N1/00832H04N2201/0094
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,942,421
App. No.
15/412,164
Granted
Apr 10, 2018
Kind
B2
Abstract

An information processing system includes a determining unit configured to determine, based on use amounts, for predetermined respective periods, of a device, whether a period during which a use amount of the device increases is present; a deciding unit configured to determine whether maintenance work is to be performed on the device in a case where the determining unit determines that the period during which the use amount of the device increases is present and to decide details of the maintenance work; and an outputting unit configured to output the details of the maintenance work. The deciding unit decides the details of the maintenance work including at least one of a check item name that is in accordance with the device and a replacement component name that is in accordance with a predicted use amount of the device in the period.

Claims (44)

1. An information processing system including at least one information processing apparatus, the information processing system comprising:

a memory; and

a processor that is coupled to the memory and that is configured to

determine, based on use amounts, for predetermined respective past periods, of a device, whether a period during which a use amount of the device increased is present among the past periods;

determine whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present and to decide details of the maintenance work based on a result determined;

output the details of the maintenance work when the details of the maintenance work for the device are decided;

predict, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and

report the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work,

wherein the processor decides the details of the maintenance work including at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period.

2. The information processing system according to claim 1 , wherein the period during which the use amount of the device increased is present based on the use amounts for respective past months of the device.

3. The information processing system according to claim 1 , wherein the use amounts are print volumes of the device.

4. The information processing system according to claim 1 ,

wherein the processor determines whether the maintenance work is to be performed on the device based on a check condition, which represents a condition of a case of requiring a predetermined check, and device information, which represents operating status of the device, and

wherein, in a case where the device information satisfies the check condition, the processor decides the details of the maintenance work including the check item name corresponding to the predetermined check.

5. The information processing system according to claim 1 ,

wherein the processor determines, for each component included in the device, whether the maintenance work is to be performed on the device based on a maximum use amount of the component and the predicted future use amount of the device in the future busy period, and

wherein, in a case where the predicted use amount exceeds the maximum use amount, the processor decides the details of the maintenance work including the replacement component name corresponding to the component.

6. The information processing system according to claim 1 , wherein, when the details of the maintenance work for the device are decided, the outputting unit reports the details of the maintenance work to the electronic apparatus that the workman, who performs the maintenance work for the device, uses.

7. The information processing system according to claim 1 ,

wherein the processor determines, for each device, whether the period during which the use amount of the device increased is present, and

wherein the processor determines, for each device, whether the maintenance work is to be performed on the device when the processor determines that the period during which the use amount of the device increased is present and decides, for each device, the details of the maintenance work based on the result determined.

8. The information processing system according to claim 1 ,

wherein the processor is configured to determine whether the component of the device is to be replaced based on the future use amount and a remaining amount of the component, and

wherein, when the future use amount exceeds the remaining amount, the processor is configured to determined that the component is to be replaced.

9. The information processing system according to claim 8 ,

wherein, when the processor determines that the component is to be replaced, the processor is configured to display, on the electronic apparatus, a screen including the replacement component name of the component to be replaced.

10. The information processing system according to claim 1 ,

wherein the processor is configured to calculate an average of the use amounts for the predetermined respective past periods, and

wherein the use amount of the busy period, during which the use amount of the device increased, is larger than the average by a predetermined amount or more.

11. An information processing method executed by a computer including a memory and a processor coupled to the memory, the information processing method comprising:

determining, based on use amounts, for predetermined respective past periods, of a device, whether a period during which an use amount of the device increased is present among the past periods;

determining whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present;

deciding details of the maintenance work based on a result determined;

outputting the details of the maintenance when the details of the maintenance work for the device are decided;

predicting, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and

reporting the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work,

wherein the details of the maintenance work includes at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period are decided.

12. A non-transitory computer readable storage medium storing a program for causing a computer including a memory and a processor coupled to the memory to execute a process, the process comprising:

determining, based on use amounts, for predetermined respective past periods, of a device, whether a period during which an use amount of the device increased is present among the past periods;

determining whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present and deciding details of the maintenance work based on a result determined; and

outputting the details of the maintenance when the details of the maintenance work for the device are decided;

predicting, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and

reporting the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work,

wherein the details of the maintenance work includes at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2017
From: HAYASHI, SHUNSUKE; OKU, TAKENORI; MIZUNO, SATOSHI
To: RICOH COMPANY, LTD.
Reel/Frame 041044/0190 →
Priority Claims (1)
JP 2016-020878 · Feb 5, 2016 · national
Continuity (1)
Related Publication 20170230521A1 · Aug 10, 2017