US 9,959,515 · App. 14/796,704 · Granted May 1, 2018

Optimized asset maintenance and replacement schedule

Inventors: Dung Phan (Ossining, NY); Jinjun Xiong (White Plains, NY)
Assignee: International Business Machines Corporation
G06Q10/06312G01M99/008G06Q10/20Y02P90/86
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,959,515
App. No.
14/796,704
Filed
Jul 10, 2015
Granted
May 1, 2018
Kind
B2
Examiner
YI, ROY Y
Art Unit
2896
USPC
702/184
Abstract

There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals t k and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.

Claims (280)

1. A method for decreasing a failure rate of each asset of a set of assets comprising:

receiving, at a programmed hardware processor, data regarding an asset, said data including a failure rate function capturing a condition of said asset up to a point in time, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset;

receiving, at said programmed hardware processor, a further input specifying a time horizon;

determining, at said programmed hardware processor, whether there is a need to replace said asset, and when a replacement of said asset is needed:

computing, at said programmed hardware processor, a mean cost-rate optimization problem formulated as an objective function of a total cost of the asset over said specified time horizon, said total cost being a function of a cost of preventative maintenance (PM) of said asset for K−1 PMs, and an expected cost of repairs for an asset failure computed as a function of said failure rate function, and the cost of replacing an asset;

computing, using the programmed hardware processor, an optimal number of preventative maintenance actions K and time intervals t k for each asset independently by minimizing said objective function with respect to an age of the electrical asset y k , where k represents a k th PM, wherein said schedule is formed without considering a labor and budget resource constraint; and

the programmed hardware processor device further storing said optimal number of preventative maintenance time intervals for each asset as data in a memory storage device operatively coupled with said processor device; and

the programmed hardware processor device generating a final maintenance schedule for the system of assets based on stored said optimal number of preventative maintenance time intervals by minimizing a deviation from the computed optimal PM time intervals subject to the labor and budget resource constraints.

2. The method of claim 1 , wherein said optimal number of preventative maintenance time intervals includes: a number K of PM intervals and an indication of a possible replacement; and a time interval t k for the k th PM.

3. The method of claim 2 , further comprising:

receiving, at said programmed hardware processor, an input specifying a time horizon;

determining, at said programmed hardware processor, by said processor device, whether there is a need to replace said asset, and with no replacement needed,

determining, at said programmed hardware processor, the optimal scheduled intervals t k by minimizing a first mean cost-rate optimization problem formulated as a first objective function of a total cost of the asset over said specified time horizon, said total cost being a function of a cost of preventative maintenance (PM) of said asset for K−1 PMs, and an expected cost of repairs for an asset failure computed as a function of a failure rate function.

4. The method of claim 3 , wherein the first objective function of a total cost of the asset to be minimized is represented as f 1 (y, K) such that:

min

y

,

K

⁢

⁢

f

1

⁡

(

y

,

K

)

=

c

p

⁡

(

K

-

1

)

+

c

m

⁢

∑

k

=

1

K

⁢

∫

b

k

-

1

⁢

y

k

-

1

y

k

⁢

h

k

⁡

(

t

)

⁢

d

⁢

⁢

t

subject to at least one constraint, wherein c p is a cost of a preventive maintenance (PM) for said asset, K is the number of PMs for said asset, c m is the cost of an asset failure, h k (t) is a failure rate function of said asset at the k th PM, y k is the electrical age of said asset just before the k th PM, and b k is an adjustment factor in electrical age due to the k th PM.

5. The method of claim 1 , wherein the objective function of a total cost of the asset to be minimized is represented as f 2 (y, K) such that:

min

y

,

K

⁢

⁢

f

2

⁢

(

y

,

K

)

=

c

p

⁡

(

K

-

1

)

+

c

r

+

c

m

⁢

∑

k

=

1

K

⁢

∫

b

k

-

1

⁢

y

k

-

1

y

k

⁢

h

k

⁡

(

t

)

⁢

d

⁢

⁢

t

y

K

+

∑

k

=

1

K

-

1

⁢

(

1

-

b

k

-

1

)

⁢

y

k

-

1

subject to at least one constraint, wherein c p is a cost of a preventive maintenance (PM) for said asset, K is the number of PMs and a possible replacement for said asset, c r is the cost of replacing the asset, c m is the cost of an asset failure, h k (t) is a failure rate function of said asset at the k th PM, y k is the electrical age of said asset just before the k th PM, and b k is an adjustment factor in electrical age due to the k th PM.

6. The method of claim 1 , wherein computing a failure rate function h 0 (t) of an asset comprises:

receiving, at said programmed hardware processor, parameter values comprising: Weibull parameter input values α, β, a current age t 0 of the asset, a number of simulation intervals N, a time interval Δt for simulation, an asset aging factor acc_factor, and a given time t wherein

N

0

=

[

t

Δ

⁢

⁢

t

]

;

and

computing, at said programmed hardware processor:

h

acc

⁡

(

t

)

=

β

⁡

(

t

0

+

Δ

⁢

⁢

t

⁢

∑

i

=

1

N

0

⁢

acc_factor

i

″

″

+

acc_factor

N

0

+

1

″

″

⁢

(

t

-

N

0

⁢

Δ

⁢

⁢

t

)

)

α

wherein said failure rate function h 0 (t) is said h acc (t) when t is less than or equal to said specified time horizon.

7. The method of claim 1 , wherein said minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints comprises: solving, using parallel integer linear programming at said programmed hardware processor:

min

x

i

k

,

n

∈

{

0

,

1

}

⁢

∑

i

∈

I

,

n

∈

N

,

k

n

∈

K

n

⁢

w

n

⁢

x

i

k

n

,

n

⁢

i

-

t

k

n

,

n

,

subject to constraints, wherein

w n is an impact weight of the n-th asset; t k,n is the optimal PM intervals for the n-th asset; and x i k,n binary variable indicating whether the k-th PM or a replacement is conducted for the n-th asset during an i-th interval, and said labor and budget resource constraints comprises: a number of PMs for the n-th asset, a k th PM being performed within a lower bound and upper bound deviation of the k th PM of the n-th asset, a total budget constraint, a maximum manpower availability at the i-th interval, and a maximum budget availability at the i-th interval.

8. The method of claim 7 further comprising:

comparing, at said programmed hardware processor, said impact weight w n against a threshold; and if the impact is bigger than said threshold:

fixing, using said programmed hardware processor, a maintenance schedule computed for the n-the asset; and

selecting, by said programmed hardware processor, values for said lower and upper bounds for PM intervals to reduce a size of integer linear programming problem.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2015
From: PHAN, DUNG; XIONG, JINJUN
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 036061/0628 →
Continuity (2)
Continuation 14551522 · Nov 24, 2014
Related Publication 20160148137A1 · May 26, 2016