IP Library Granted Patent US 9,997,920
Granted Patent B2
US 9,997,920 · App. 14/860,159 · Granted Jun 12, 2018

System and method for islanding detection and prevention in distributed generation

Inventors: Shibashis Bhowmik (Charlotte, NC); Iman Mazhari (Charlotte, NC); Babak Parkhideh (Charlotte, NC)
Assignees: SINEWATTS, INC.; THE UNIVERSITY OF NORTH CAROLINA AT CHARLOTTE
H02J3/381H02J3/383H02J2003/388Y02E10/563
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,997,920
App. No.
14/860,159
Granted
Jun 12, 2018
Kind
B2
Abstract

Various examples are directed to systems and methods for detecting an islanding condition at an inverter configured to couple a distributed generation system to an electrical grid network. A controller may determine a command frequency and a command frequency variation. The controller may determine that the command frequency variation indicates a potential islanding condition and send to the inverter an instruction to disconnect the distributed generation system from the electrical grid network. When the distributed generation system is disconnected from the electrical grid network, the controller may determine whether the grid network is valid.

Claims (22)

1. A system for detecting an islanding condition at a distributed generation system, the system comprising:

a distributed generation system comprising at least one photovoltaic system;

an inverter electrically coupled to the distributed generation system to connect the distributed generation system to an electrical grid network;

a controller in communication with the inverter, wherein the controller comprises at least one processor and is programmed to:

periodically sample a grid frequency of the electrical grid network;

filter a first sample of the grid frequency to determine a filtered grid frequency for the first sample;

determine a command frequency for the first sample by summing:

a filtered grid frequency for the first sample; and

a value proportional to a difference between the filtered grid frequency for the first sample and the grid frequency for the first sample;

send the command frequency for the first sample to the inverter;

determine a difference between the command frequency for the first sample and a command frequency for a second sample immediately preceding the first sample to generate a command frequency variation;

determine that the command frequency variation has been within a locking frequency band for more than a threshold time period, wherein the threshold time period is less than two seconds;

instruct the inverter to disconnect the distributed generation system from the electrical grid network;

determine that the electrical grid network at the inverter is not disconnected from a main power system; and

instruct the inverter to re-connect the distributed generation system to the electrical grid network.

2. The system of claim 1 , wherein the controller is further programmed to execute over frequency protection/under frequency protection (OFP/UFP) by:

determining that the command frequency for the first sample is outside of a threshold frequency range for the grid network; and

instructing the inverter to disconnect the distributed generation system from the electrical grid network.

3. The system of claim 1 , wherein the controller is further programmed to:

periodically sample a phase of a signal at a point of common coupling (PCC) between the inverter and the electrical grid network; and

determine that the phase has been within a locking phase band for more than a second threshold time period, wherein the second threshold time period is less than two seconds.

4. The system of claim 3 , wherein the controller is programmed to determine that the phase has been within the locking phase band for more than the second threshold time period before instructing the inverter to disconnect the distributed generation system from the electrical grid network.

Assignments (3)
CONFIRMATORY LICENSE Recorded Dec 8, 2020
From: UNIVERSITY OF NORTH CAROLINA CHARLOTTE
To: UNITED STATES DEPARTMENT OF ENERGY
Reel/Frame 054574/0877 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 13, 2018
From: MAZHARI, IMAN; PARKHIDEH, BABAK
To: THE UNIVERSITY OF NORTH CAROLINA AT CHARLOTTE
Reel/Frame 045535/0293 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 13, 2018
From: BHOWMIK, SHIBASHIS
To: SINEWATTS, INC.
Reel/Frame 045535/0685 →
Continuity (3)
Continuation In Part 14737468 · Jun 11, 2015
Provisional Application 62010518 · Jun 11, 2014
Related Publication 20160013650A1 · Jan 14, 2016