IP Library Granted Patent US 7,367,349
Granted Patent B2
US 7,367,349 · App. 11/180,836 · Granted May 6, 2008

Method for opening tank shut-off valves in gas feeding systems with connected tanks

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,367,349
App. No.
11/180,836
Granted
May 6, 2008
Kind
B2
Abstract

A method for opening tank shut-off valves in a fuel cell system that includes multiple pressurized tanks. A flow control device is positioned in a supply line downstream of the tank shut-off valves. When the system is started up, only one of the tank shut-off valves is opened to allow the pressure in the supply line to increase between the tank shut-off valves and the flow control device before the other tank shut-off valves are opened. Therefore, only one of the tank shut-off valves is subjected to the high pressure difference that induces significant valve wear and tear. The valve opening sequence is controlled so each of the tank shut-off valves is selected as the one to be opened at system start-up by a cycling process.

Claims (36)

1. A method for opening tank shut-off valves in a system including a plurality of compressed gas tanks, where each tank includes a shut-off valve, said method comprising:

providing a pressure drop device downstream of the shut-off valves;

determining which one of the plurality of tank shut-off valves will be opened first at a next start-up of the system;

opening the determined valve at start-up to allow a pressure build-up in a supply line between the shut-off valves and the pressure drop device; and

opening the remaining shut-off valves after the pressure in the supply line between the opened shut-off valve and the pressure drop device has reached a predetermined pressure.

2. The method according to claim 1 wherein opening the remaining shut-off valves includes waiting a certain period of time for the pressure in the supply line to reach the predetermined pressure.

3. The method according to claim 1 wherein opening the remaining shut-off valves includes measuring the pressure in the supply line to determine if the pressure in the supply line has reached the predetermined pressure.

4. The method according to claim 1 wherein determining which one of the plurality of tank shut-off valves will be opened first includes opening the shut-off valves by a predetermined sequence so that all of the shut-off valves are opened once before any of the shut-off valves are opened another time.

5. The method according to claim 1 wherein the predetermined pressure is about the same as the pressure in the tanks.

6. The method according to claim 1 wherein providing a pressure drop device includes providing a secondary shut-off valve.

7. The method according to claim 1 wherein providing a pressure drop device includes providing a flow restrictor.

8. The method according to claim 1 wherein providing a pressure drop device includes providing a pressure regulator.

9. The method according to claim 1 wherein the compressed gas tanks are compressed hydrogen gas tanks in a fuel cell system.

10. A method for opening tank shut-off valves in a fuel cell system including a plurality of compressed hydrogen gas tanks, where each tank includes a shut-off valve, said method comprising:

providing a pressure drop device downstream of the shut-off valves;

determining which one of the plurality of tank shut-off valves will be opened first at a next start-up of the system, wherein determining which one of the plurality of tank shut-off valves will be opened first includes opening the shut-off valves by a predetermined sequence so that all of the shut-off valves are opened once before any of the shut-off valves are opened another time;

opening the determined valve at start-up to allow a pressure build-up in a supply line between the shut-off valves and the pressure drop device; and

opening the remaining shut-off valves after the pressure in the supply line between the opened shut-off valve and the pressure drop device has reached a predetermined pressure.

11. The method according to claim 10 wherein opening the remaining shut-off valves includes waiting a certain period of time for the pressure in the supply line to reach the predetermined pressure.

12. The method according to claim 10 wherein opening the remaining shut-off valves includes measuring the pressure in the supply line to determine if the pressure in the supply line has reached the predetermined pressure.

13. The method according to claim 10 wherein the predetermined pressure is about the same as the pressure in the tanks.

14. The method according to claim 10 wherein providing a pressure drop device includes providing a secondary shut-off valve.

15. The method according to claim 10 wherein providing a pressure drop device includes providing a flow restrictor.

16. The method according to claim 10 wherein providing a pressure drop device includes providing a pressure regulator.

17. A fuel cell system comprising:

a plurality of compressed hydrogen tanks;

a tank shut-off valve for each tank;

a pressure drop device downstream of the shut-off valves; and

a controller for determining which one of the plurality of tank shut-off valves will be opened first at a next start-up of the system, said controller opening the determined valve at start-up to allow a pressure build-up in a supply line between the shut-off valves and the pressure drop device and then opening the remaining shut-off valves after the pressure in a supply line between the opened shut-off valve and the pressure drop device has reached a predetermined pressure.

18. The fuel cell system according to claim 17 wherein the controller opens the remaining shut-off valves after waiting a certain period of time for the pressure in the supply line to reach the predetermined pressure.

19. The fuel cell system according to claim 17 further comprising a pressure sensor for measuring the pressure within the supply line between the shut-off valves and the pressure drop device, wherein the controller opens the remaining shut-off valves when the measured pressure in the supply line has reached the predetermined pressure.

20. The fuel cell system according to claim 17 wherein the controller opens the shut-off valves by a predetermined sequence so that all of the shut-off valves are opened once before any of the shut-off valves are opened another time.

21. The fuel cell system according to claim 17 wherein the predetermined pressure is about the same as the pressure in the tanks.

22. The fuel cell system according to claim 17 wherein the pressure drop device is a secondary shut-off valve.

23. The fuel cell system according to claim 17 wherein the pressure drop device is a flow restrictor.

24. The fuel cell system according to claim 17 wherein the pressure drop device is a pressure regulator.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034371/0676 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025780/0936 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025327/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 5, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025314/0901 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0587 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0093 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0142 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023127/0402 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0519 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022553/0493 →
SECURITY AGREEMENT Recorded Feb 3, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022195/0334 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 11, 2005
From: THYROFF, JURGEN
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 016632/0962 →