IP Library Granted Patent US 8,445,145
Granted Patent B2
US 8,445,145 · App. 11/534,272 · Granted May 21, 2013

Stack shutdown purge method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,445,145
App. No.
11/534,272
Granted
May 21, 2013
Kind
B2
Abstract

A method of purging residual hydrogen from a fuel cell stack is disclosed. The method includes providing an air stream, providing a temporary nitrogen stream by removing oxygen from the air stream with an adsorbent bed and passing the nitrogen stream through the fuel cell stack.

Claims (31)

1. A method of purging residual hydrogen from a hydrogen fuel cell stack, comprising:

providing an air stream;

providing an adsorbent material comprising CeO;

providing a nitrogen stream by removing oxygen from said air stream by passing said air stream through said adsorbent material; and

passing said nitrogen stream through said fuel cell stack anode.

2. The method of claim 1 further comprising re-generating said adsorbent material by providing a hydrogen stream and passing said hydrogen stream through said adsorbent material.

3. The method of claim 2 wherein said passing said nitrogen stream through said fuel cell stack anode comprises passing said nitrogen stream through said fuel cell stack anode after shutdown of said fuel cell stack.

4. The method of claim 2 wherein said passing said hydrogen stream through said adsorbent material comprises passing said hydrogen stream through said adsorbent material after shutdown of said fuel cell stack.

5. The method of claim 2 further comprising flowing a stream exiting the adsorbent material through said fuel cell stack.

6. The method of claim 2 further comprising heating said adsorbent material during said passing said hydrogen stream through said adsorbent material.

7. The method of claim 2 wherein said passing said air stream through said adsorbent material comprises passing said air stream through said adsorbent material during start-up of said fuel cell stack.

8. The method of claim 7 wherein said re-generating said adsorbent material comprises re-generating said adsorbent material after startup of said fuel cell stack.

9. The method of claim 2 further comprising heating said adsorbent material during said passing said hydrogen stream through said adsorbent material.

10. The method of claim 1 wherein said adsorbent material further comprises a catalyst capable of accelerating reactions on CeO.

11. A method of purging residual hydrogen from a fuel cell stack anode, comprising;

providing an air stream;

providing an oxygen adsorbent material capable of removing at least a substantial portion of oxygen from an air stream to provide substantially a nitrogen stream;

providing a nitrogen stream by passing said air stream through said adsorbent material;

passing said nitrogen stream through said fuel cell stack; and

re-generating said oxygen adsorbent material by providing cathode exhaust from said fuel cell stack and passing said cathode exhaust through said adsorbent material before venting cathode exhaust.

12. The method of claim 11 wherein said adsorbent material comprises CeO.

13. The method of claim 11 further comprising heating said adsorbent material during said passing said cathode exhaust through said adsorbent material.

14. A method of purging residual hydrogen from a hydrogen fuel cell stack anode, comprising:

providing an air stream;

providing a first adsorbent material and a second adsorbent material; each of said first and second adsorbent materials is capable of removing a substantial portion of oxygen from an air stream to provide substantially a nitrogen stream;

providing a first nitrogen stream by passing said air stream through said first adsorbent material and passing said first nitrogen stream through said fuel cell stack during shutdown of said fuel cell stack;

providing a second nitrogen stream by passing said air stream through said second adsorbent material and passing said second nitrogen stream through said fuel cell stack during start-up of said fuel cell stack; and

re-generating said first adsorbent material and said second adsorbent material by providing a hydrogen stream and passing said hydrogen stream through said first adsorbent material and said second adsorbent material, respectively.

15. The method of claim 14 wherein said hydrogen stream is vented from the first adsorbent material and second adsorbent material through said fuel cell stack.

16. The method of claim 14 wherein said first adsorbent material and said second adsorbent material each comprises at least one of a carbon structure, carbon molecular sieve, a zeolite, CeO or an oxygen adsorbing material.

17. The method of claim 14 further comprising heating said first adsorbent material and said second adsorbent material during said passing said hydrogen stream through said first adsorbent material and said second adsorbent material.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034184/0001 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025781/0001 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025327/0041 →
RELEASE OF SECURITY INTEREST Recorded Nov 5, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025314/0901 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0656 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0140 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0264 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023155/0663 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0563 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022553/0540 →
SECURITY AGREEMENT Recorded Feb 4, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022201/0610 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 22, 2006
From: SALVADOR, JOHN P.; GITTLEMAN, CRAIG S.; VOECKS, GERALD E.
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 018290/0122 →