IP Library Granted Patent US 8,742,415
Granted Patent B2
US 8,742,415 · App. 13/894,051 · Granted Jun 3, 2014

Test circuitry coupled to embedded circuit input/output unconnected to pads

Inventors: Lee D. Whetsel (Parker, TX); Richard L. Antley (Richardson, TX)
Assignee: Texas Instruments Incorporated
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,742,415
App. No.
13/894,051
Granted
Jun 3, 2014
Kind
B2
Abstract

Timely testing of die on wafer reduces the cost to manufacture ICs. This disclosure describes a die test structure and process to reduce test time by adding test pads on the top surface of the die. The added test pads allow a tester to probe and test more circuits within the die simultaneously. Also, the added test pads contribute to a reduction in the amount of test wiring overhead traditionally required to access and test circuits within a die, thus reducing die size.

Claims (7)

1. A die of semiconductor material, comprising:

A. die pads arranged at the periphery of the die;

B. a first embedded circuit having functional inputs and outputs, at least one of the functional inputs and at least one of the functional outputs being unconnected to a die pad;

C. test circuitry coupled to the one of the functional inputs of the first embedded circuit that is unconnected to a die pad, the one of the functional outputs of the first embedded circuit that is unconnected to a die pad; and the test circuitry having an enable input; and

D. test enable circuitry having an input connected to an enable test pad, separate from the die pads, and an output coupled to the test circuitry enable input.

2. The die of claim 1 in which the test circuitry includes a first test isolation buffer coupled to the one of the functional inputs and a second test isolation buffer coupled to the one of the functional outputs, and the test enable circuitry includes a series connection of an input buffer having an input connected to the enable test pad, a first OR gate having an output connected to the first test isolation buffer, and a second OR gate having an output connected to the second test isolation buffer.

3. The die of claim 1 in which the embedded circuit is one of a digital signal processor core, a microprocessor core, mixed signal circuitry, peripheral circuitry, and memory circuitry.

Continuity (9)
Division 13432667 · Mar 28, 2012
Division 13097352 · Apr 29, 2011
Division 12495060 · Jun 30, 2009
Division 12047907 · Mar 13, 2008
Division 11279509 · Apr 12, 2006
Division 10610437 · Jun 30, 2003
Division 10051536 · Jan 18, 2002
Provisional Application 60263134 · Jan 19, 2001
Related Publication 20130248864A1 · Sep 26, 2013