IP Library Granted Patent US 10,036,678
Granted Patent B2
US 10,036,678 · App. 14/059,215 · Granted Jul 31, 2018

Automated control of toolface while slide drilling

Inventors: Gary Verdean Fisher, Jr. (Houston, TX); Graham Hunter (Houston, TX); Mahmoud Hadi (Richmond, TX); Carlos Rolong (Houston, TX)
Assignee: NABORS DRILLING TECHNOLOGIES USA, INC.
G01L5/0004E21B7/068E21B44/005E21B47/024E21B49/003
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,036,678
App. No.
14/059,215
Granted
Jul 31, 2018
Kind
B2
Abstract

Apparatuses, systems, and methods for controlling slide drilling on a drilling rig are described. The methods include detecting current differential pressure of a mud motor and/or weight on bit (WOB) at a surface of a borehole, predicting current reactive torque of the mud motor based on the current differential pressure and/or WOB, and automatically adjusting surface torque and/or angular offset of a tubular adjacent the surface to counteract the current reactive torque and to keep the mud motor at a desired toolface orientation in the borehole.

Claims (53)

1. A method of slide drilling, which method comprises:

determining, with a controller, using surface readings obtained adjacent a surface of a borehole, current differential pressure of a mud motor determined by calculating a difference between a measured off-bottom surface standpipe pressure and a measured on-bottom surface standpipe pressure, weight on bit (WOB) determined by a surface WOB sensor, or both;

predicting, with the controller, using the surface readings obtained adjacent the surface of the borehole, current downhole reactive torque of the mud motor based on a first predetermined relationship with either the determined current differential pressure, the WOB, or both, wherein the current downhole reactive torque is generated by sliding and causes a change in toolface orientation from a desired toolface orientation;

determining, with the controller, a downhole length of the tubular string;

determining, with the controller, based on a second predetermined relationship with the predicted current downhole reactive torque, the downhole length of the tubular string and a change of friction in the tubular string, a specific amount of surface torque, angular offset, or both to apply to a tubular adjacent the surface to counteract the current downhole reactive torque to correct for the change in toolface orientation caused by the current downhole reactive torque and to position the mud motor at the desired toolface orientation in the borehole;

generating and sending, with the controller, a control signal to a top drive to apply the specific amount of surface torque, angular offset, or both to the tubular; and

controlling, via the control signal, the top drive to apply the specific amount of surface torque, angular offset, or both to the tubular.

2. The method of claim 1 , wherein the first predetermined relationship differs in response to a mud motor used, formation drilled, drill bit used, or combination thereof.

3. The method of claim 1 , wherein the first predetermined relationship is determined by fitting data points to a curve.

4. The method of claim 3 , wherein the predicting the current downhole reactive torque further comprises using the curve to interpolate or extrapolate the current downhole reactive torque based on the current differential pressure, WOB, or both.

5. The method of claim 2 , further comprising selecting a specific first predetermined relationship from a plurality of predetermined relationships in response to the formation drilled, drill bit used, mud motor used, or a combination thereof.

6. The method of claim 5 , wherein the plurality of predetermined relationships are determined by fitting measured differential pressure data, WOB, or both and reactive torque data to a curve for each of the different formations, drill bits, mud motors, or a combination thereof.

7. The method of claim 1 , wherein determining the current differential pressure, WOB, or both further comprises measuring surface standpipe pressure, WOB, or both, at predetermined time intervals.

8. A method of slide drilling, which method comprises:

determining, with a controller using surface readings obtained adjacent a surface of a borehole to reduce lag time between receiving sensed or calculated data and adjusting a drilling toolface, current differential pressure of a mud motor determined by calculating a difference between a measured off-bottom surface standpipe pressure and a measured on-bottom surface standpipe pressure, weight on bit (WOB) determined by a surface WOB sensor, or both;

predicting, within the controller using the surface readings obtained adjacent the surface of the borehole, current downhole reactive torque of the mud motor based on a first predetermined relationship with either the determined current differential pressure, the WOB, or both, wherein the current downhole reactive torque is generated by sliding and causes a change in toolface orientation from a desired toolface orientation;

determining, with the controller, a downhole length of the tubular string;

determining, with the controller, based on a second predetermined relationship with the predicted current downhole reactive torque, the downhole length of the tubular string and a change of friction in the tubular string, a specific amount of surface torque, angular offset, or both, to apply to of a tubular adjacent the surface to counteract the current downhole reactive torque to correct for the change in toolface orientation caused by the current downhole reactive torque and to position the mud motor at the desired toolface orientation in the borehole;

generating and sending, with the controller, a control signal to a top drive to apply the specific amount of surface torque, angular offset, or both to the tubular; and

controlling, via the control signal, the top drive to apply the specific amount of surface torque, angular offset, or both to the tubular.

9. The method of claim 8 , wherein the first predetermined relationship differs in response to a mud motor used, formation drilled, drill bit used, or combination thereof.

10. The method of claim 9 , further comprising selecting a specific first predetermined relationship from a plurality of predetermined relationships in response to the formation drilled, drill bit used, mud motor used, or a combination thereof.

11. The method of claim 10 , wherein the plurality of first predetermined relationships are determined by fitting measured differential pressure data, WOB, or both and reactive torque data to a curve for each of the different formations, drill bits, mud motors, or a combination thereof.

12. The method of claim 8 , wherein the first predetermined relationship is determined by fitting data points to a curve.

13. The method of claim 12 , wherein the predicting the current downhole reactive torque further comprises using the curve to interpolate or extrapolate the current downhole reactive torque based on the current differential pressure, WOB, or both.

14. A control system configured to perform slide drilling comprising:

a computer system configured to predict, using surface readings obtained adjacent a surface of a borehole, current downhole reactive torque of a mud motor based on a first predetermined relationship with current differential pressure determined by calculating a difference between a measured off-bottom surface standpipe pressure and a measured on-bottom surface standpipe pressure, weight on bit (WOB) values determined by a surface WOB sensor, or both, wherein the current downhole reactive torque is generated by sliding and causes a change in toolface orientation from a desired toolface orientation;

a sensor engine in communication with the computer system, the sensor engine being configured to sense the surface readings of the current differential pressure, WOB, or both, adjacent the surface of the borehole; and

an operational equipment engine in communication with the computer system, the operational equipment engine being configured to receive input from the computer system to:

determine, with a controller, a downhole length of the tubular string;

determine, based on a second predetermined relationship with the predicted current downhole reactive torque, the downhole length of the tubular string and a change of friction in the tubular string, a specific amount of surface torque, angular offset, or both, of a tubular adjacent the surface to counteract the current downhole reactive torque to correct for the change in toolface orientation caused by the current downhole reactive torque and to position the mud motor at the desired toolface orientation in the borehole;

generate and send a control signal to a top drive to apply the specific amount of surface torque, angular offset, or both to the tubular; and

control, via the control signal, the top drive to apply the specific amount of surface torque, angular offset, or both to the tubular.

15. The control system of claim 14 , wherein the computer system is configured to predict current downhole reactive torque using previously measured differential pressure data, WOB, or both and reactive torque data from the sensor engine.

16. The control system of claim 15 , wherein the computer system is further configured to fit the previously measured differential pressure data, WOB, or both and reactive torque data to a curve.

17. The control system of claim 16 , wherein the computer system is further configured to use the curve to estimate the current downhole reactive torque based on the current differential pressure, WOB, or both.

18. The control system of claim 14 , wherein the computer system is further configured to predict the current downhole reactive torque for different formations, drill bits, mud motors, or combinations thereof.

19. The control system of claim 14 , wherein the sensor engine is configured to detect the current differential pressure, WOB, or both, by measuring surface standpipe pressure, WOB, or both, at predetermined time intervals.

20. The control system of claim 14 , wherein the the first predetermined relationship differs in response to a mud motor used, formation drilled, drill bit used, or combination thereof.

21. The control system of claim 14 , wherein the operational equipment engine is further configured to:

determine a downhole length of the tubular, wherein the specific amount of surface torque, angular offset, or both is determined based additionally on the downhole length of the tubular.

22. A non-transitory computer-readable medium configured to extend a borehole with a rig comprising a plurality of computer-readable instructions which, when executed by one or more processors, are configured to cause the one or more processors to perform a method which comprises:

predicting, using surface readings measured adjacent a surface of a borehole, current downhole reactive torque of a mud motor based on a first predetermined relationship with current differential pressure determined by calculating a difference between a measured off-bottom surface standpipe pressure and a measured on-bottom surface standpipe pressure, weight on bit (WOB) determined by a surface WOB sensor, or both, wherein the current downhole reactive torque is generated by sliding and causes a change in toolface orientation from a desired toolface orientation;

determining, with a controller, a downhole length of the tubular string;

determining, based on a second predetermined relationship with the predicted current downhole reactive torque, the downhole length of the tubular string and a change of friction in the tubular string, a specific amount of surface torque, angular offset, or both to apply to of a tubular adjacent the surface to counteract the current downhole reactive torque to correct for the change in toolface orientation caused by the current downhole reactive torque and to position the mud motor at the desired toolface orientation in the borehole;

generating and sending a control signal to a top drive to apply the specific amount of surface torque, angular offset, or both to the tubular; and

controlling, via the control signal, the top drive to apply the specific amount of surface torque, angular offset, or both to the tubular.

23. The non-transitory computer-readable medium of claim 22 , wherein the first predetermined relationship differs in response to a mud motor used, formation drilled, drill bit used, or combination thereof.

24. The non-transitory computer-readable medium of claim 22 , wherein the first predetermined relationship is determined by fitting data points to a curve.

25. The non-transitory computer-readable medium of claim 24 , wherein the predicting the current downhole reactive torque further comprises using the curve to interpolate or extrapolate the current downhole reactive torque.

26. The non-transitory computer-readable medium of claim 23 , wherein the method further comprises:

selecting a specific first predetermined relationship from a plurality of predetermined relationships in response to the formation drilled, drill bit used, mud motor used, or a combination thereof.

27. The non-transitory computer-readable medium of claim 26 , wherein the plurality of predetermined relationships are determined by fitting measured differential pressure data, WOB, or both and reactive torque data to a curve for each of the different formations, drill bits, mud motors, or a combination thereof.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED AT REEL: 032096 FRAME: 0542. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Mar 7, 2017
From: FISHER, GARY VERDEAN, JR.; HUNTER, GRAHAM; HADI, MAHMOUD; ROLONG, CARLOS
To: RYAN DIRECTIONAL SERVICES, INC.
Reel/Frame 041901/0458 →
MERGER AND CHANGE OF NAME Recorded Nov 3, 2016
From: RYAN DIRECTIONAL SERVICES, INC.; NDUSA HOLDINGS CORP; NABORS DRILLING USA INC.
To: NABORS DRILLING TECHNOLOGIES USA, INC.
Reel/Frame 040459/0513 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2014
From: FISHER, GARY VERDEAN, JR.; HUNTER, GRAHAM; HADI, MAHMOUD; ROLONG, CARLOS
To: RYAN DIRECTIONAL SERVICES
Reel/Frame 032096/0542 →
Continuity (1)
Related Publication 20150107899A1 · Apr 23, 2015
Cited By (13)
US 12,196,069 US 12,203,358 US 12,203,361 US 12,241,356 US 12,297,736 US 12,338,724 US 12,366,156 US 12,516,596 US 12,595,730 US 12,716,348 US 12,719,392 US 12,723,501 US 12,735,973