IP Library Granted Patent US 9,245,086
Granted Patent B2
US 9,245,086 · App. 14/266,499 · Granted Jan 26, 2016

Techniques for electromigration stress mitigation in interconnects of an integrated circuit design

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,245,086
App. No.
14/266,499
Granted
Jan 26, 2016
Kind
B2
Abstract

A technique for electromigration stress mitigation in interconnects of an integrated circuit design includes generating a maximal spanning tree of a directed graph, which represents an interconnect network of an integrated circuit design. A first point on the spanning tree having a lowest stress and a second point on the spanning tree having a highest stress are located. A maximum first stress between the first and second points is determined. In response to determining the maximum first stress between the first and second points is greater than a critical stress, a stub is added to the spanning tree at a node between the first and second points. The maximum first stress between the first and second points is re-determined subsequent to adding the stub.

Claims (63)

1. A method of electromigration stress mitigation in interconnects of an integrated circuit design, comprising:

generating, using a data processing system, a maximal spanning tree of a directed graph, wherein the directed graph represents an interconnect network of an integrated circuit design;

locating, using the data processing system, a first point on the spanning tree having a lowest stress and a second point on the spanning tree having a highest stress;

determining, using the data processing system, a maximum first stress between the first and second points;

in response to determining the maximum first stress between the first and second points is greater than a critical stress, adding, using the data processing system, a stub to the spanning tree at a node between the first and second points;

re-determining, using the data processing system, the maximum first stress between the first and second points subsequent to adding the stub; and

in response to the maximum first stress between the first and second points being less than the critical stress subsequent to adding the stub, storing, using the data processing system, the interconnect network for the integrated circuit design.

2. The method of claim 1 , further comprising:

indicating, using the data processing system, a pass condition in response to the re-determined maximum first stress being less than the critical stress.

3. The method of claim 1 , further comprising:

determining, using the data processing system, whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress; and

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being less than the critical stress, a passing condition on an edge connected to the node.

4. The method of claim 1 , further comprising:

adjusting the stub in response to the re-determined maximum first stress being greater than or equal to the critical stress;

re-determining, using the data processing system, the maximum first stress between the first and second points subsequent to adjusting the stub;

determining, using the data processing system, whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress subsequent to adjusting the stub;

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being less than the critical stress subsequent to adjusting the stub, a passing condition on an edge connected to the node; and

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being greater than or equal to the critical stress subsequent to adjusting the stub a predetermined number of times, a failing condition on the edge connected to the node.

5. The method of claim 1 , wherein the lowest stress occurs at a highest potential and the highest stress occurs at a lowest potential.

6. The method of claim 1 , wherein the interconnect network includes one or more metal segments.

7. The method of claim 6 , wherein the interconnect network also includes one or more passive components.

8. A data processing system configured to mitigate electromigration stress in interconnects of an integrated circuit design, the data processing system comprising:

a storage subsystem; and

a processor coupled to the storage subsystem, wherein the processor is configured to:

create a maximal spanning tree of a directed graph that represents an interconnect network of an integrated circuit design;

find a first point on the spanning tree having a lowest stress and a second point on the spanning tree having a highest stress;

ascertain a maximum first stress between the first and second points;

in response to ascertaining the maximum first stress between the first and second points is greater than a critical stress, add a stub to the spanning tree at a node between the first and second points;

re-ascertain the maximum first stress between the first and second points subsequent to adding the stub; and

in response to the maximum first stress between the first and second points being less than the critical stress subsequent to adding the stub, create at least a portion of a mask set for the integrated circuit design that includes the interconnect network with the added stub.

9. The data processing system of claim 8 , wherein the processor is further configured to indicate a pass condition in response to the re-ascertained maximum first stress being less than the critical stress.

10. The data processing system of claim 8 , wherein the processor is further configured to:

determine whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress; and

indicate a passing condition on an edge connected to the node in response to the second stress at the node along the path between the first and second points being less than the critical stress.

11. The data processing system of claim 8 , wherein the processor is further configured to:

adjust the stub in response to the re-ascertained maximum first stress being greater than or equal to the critical stress;

re-determine the maximum first stress between the first and second points subsequent to adjusting the stub;

determine whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress subsequent to adjusting the stub;

indicate a passing condition on an edge connected to the node in response to the second stress at the node along the path between the first and second points being less than the critical stress subsequent to adjusting the stub; and

indicate a failing condition on the edge connected to the node in response to the second stress at the node along the path between the first and second points being greater than or equal to the critical stress subsequent to adjusting the stub a predetermined number of times.

12. The data processing system of claim 8 , wherein the lowest stress occurs at a highest potential and the highest stress occurs at a lowest potential.

13. The data processing system of claim 8 , wherein the interconnect network includes one or more passive components.

14. The data processing system of claim 13 , wherein the interconnect network also includes one or more metal segments.

15. A method of mitigating electromigration stress in interconnects of an integrated circuit design, comprising:

generating, using a data processing system, a maximal spanning tree of a directed graph, wherein the directed graph represents an interconnect network of an integrated circuit design;

locating, using the data processing system, a first point on the spanning tree having a lowest stress and a second point on the spanning tree having a highest stress;

determining, using the data processing system, whether a maximum first stress between the first and second points is less than a critical stress;

in response to determining the maximum first stress between the first and second points is greater than a critical stress, adding, using the data processing system, a stub to the spanning tree at a node between the first and second points;

re-determining, using the data processing system, the maximum first stress between the first and second points subsequent to adding the stub;

indicating, using the data processing system, a pass condition in response to the maximum first stress being less than the critical stress; and

in response to the maximum first stress between the first and second points being less than the critical stress subsequent to adding the stub, generating, using the data processing system, at least a portion of a mask set for the integrated circuit design that includes the interconnect network with the added stub.

16. The method of claim 15 , further comprising:

determining, using the data processing system, whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress; and

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being less than the critical stress, a passing condition on an edge connected to the node.

17. The method of claim 15 , further comprising:

adjusting the stub in response to the re-determined maximum first stress being greater than or equal to the critical stress;

re-determining, using the data processing system, the maximum first stress between the first and second points subsequent to adjusting the stub;

determining, using the data processing system, whether a second stress at a node along a path between the first and second points is less than the critical stress in response to the re-determined maximum first stress being greater than or equal to the critical stress subsequent to adjusting the stub;

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being less than the critical stress subsequent to adjusting the stub, a passing condition on an edge connected to the node; and

indicating, using the data processing system, in response to the second stress at the node along the path between the first and second points being greater than or equal to the critical stress subsequent to adjusting the stub a predetermined number of times, a failing condition on the edge connected to the node.

18. The method of claim 15 , wherein the lowest stress occurs at a highest potential and the highest stress occurs at a lowest potential.

19. The method of claim 15 , wherein the interconnect network includes one or more metal segments.

20. The method of claim 15 , wherein the interconnect network includes one or more passive components.

Assignments (25)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 11759915 AND REPLACE IT WITH APPLICATION 11759935 PREVIOUSLY RECORDED ON REEL 040925 FRAME 0001. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF SECURITY INTEREST. Recorded Feb 17, 2020
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP, B.V. F/K/A FREESCALE SEMICONDUCTOR, INC.
Reel/Frame 052917/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 11759915 AND REPLACE IT WITH APPLICATION 11759935 PREVIOUSLY RECORDED ON REEL 040928 FRAME 0001. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF SECURITY INTEREST. Recorded Jan 17, 2020
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 052915/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 042985 FRAME 0001. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051029/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 039361 FRAME 0212. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051029/0387 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051030/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 042762 FRAME 0145. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051145/0184 →
RELEASE OF SECURITY INTEREST Recorded Sep 10, 2019
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 050745/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12681366 PREVIOUSLY RECORDED ON REEL 039361 FRAME 0212. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded May 9, 2017
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 042762/0145 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12681366 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded May 9, 2017
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 042985/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 15, 2017
From: NORTH STAR INNOVATIONS INC.
To: TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.
Reel/Frame 041717/0736 →
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2016
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 040928/0001 →
RELEASE OF SECURITY INTEREST Recorded Sep 21, 2016
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP, B.V., F/K/A FREESCALE SEMICONDUCTOR, INC.
Reel/Frame 040925/0001 →
PATENT RELEASE Recorded Aug 17, 2016
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 039707/0471 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 14/258,829 AND REPLACE ITWITH 14/258,629 PREVIOUSLY RECORDED ON REEL 037444 FRAME 0082. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT AND ASSUMPTION OFSECURITY INTEREST IN PATENTS. Recorded Aug 10, 2016
From: CITIBANK, N.A.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 039639/0332 →
CORRECTIVE ASSIGNMENT OF INCORRECT APPLICATION 14/258,829 PREVIOUSLY RECORDED ON REEL 037444 FRAME 0109. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT AND ASSUMPTION OF SECURITY INTEREST IN PATENTS. Recorded Aug 10, 2016
From: CITIBANK, N.A.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 039639/0208 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12092129 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Jul 14, 2016
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 039361/0212 →
SECURITY AGREEMENT SUPPLEMENT Recorded Mar 7, 2016
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 038017/0058 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 4, 2016
From: FREESCALE SEMICONDUCTOR, INC.
To: NORTH STAR INNOVATIONS INC.
Reel/Frame 037694/0264 →
ASSIGNMENT AND ASSUMPTION OF SECURITY INTEREST IN PATENTS Recorded Jan 5, 2016
From: CITIBANK, N.A.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 037444/0109 →
ASSIGNMENT AND ASSUMPTION OF SECURITY INTEREST IN PATENTS Recorded Jan 5, 2016
From: CITIBANK, N.A.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 037444/0082 →
PATENT RELEASE Recorded Dec 21, 2015
From: CITIBANK, N.A., AS COLLATERAL AGENT
To: FREESCALE SEMICONDUCTOR, INC.
Reel/Frame 037357/0903 →
SUPPLEMENT TO IP SECURITY AGREEMENT Recorded Aug 1, 2014
From: FREESCALE SEMICONDUCTOR, INC.
To: CITIBANK, N.A., AS NOTES COLLATERAL AGENT
Reel/Frame 033462/0293 →
SUPPLEMENT TO IP SECURITY AGREEMENT Recorded Aug 1, 2014
From: FREESCALE SEMICONDUCTOR, INC.
To: CITIBANK, N.A., AS NOTES COLLATERAL AGENT
Reel/Frame 033462/0267 →
SUPPLEMENT TO IP SECURITY AGREEMENT Recorded Aug 1, 2014
From: FREESCALE SEMICONDUCTOR, INC.
To: CITIBANK, N.A., AS NOTES COLLATERAL AGENT
Reel/Frame 033460/0337 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2014
From: DEMIRCAN, ERTUGRUL; SHROFF, MEHUL D.
To: FREESCALE SEMICONDUCTOR, INC.
Reel/Frame 032794/0198 →