IP Library › Granted Patent US 10,289,107
Granted Patent B2
US 10,289,107 · App. 15/307,342 · Granted May 14, 2019

System and method for fault analysis and prioritization

Inventors: Gregory C. Warner (Indianapolis, IN); Henrik Cohen (Copenhagen, DK); Robert Gartner (Oberageri, CH)
Assignee: Siemens Scweiz AG
G05B23/0224G05B15/02G05B23/0208G06Q10/06312G06Q50/06G05B2219/24048G05B2219/2642Y02P90/845
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,289,107
App. No.
15/307,342
Filed
Oct 27, 2016
Granted
May 14, 2019
Kind
B2
Art Unit
2193
USPC
700/79
Abstract

Methods for system management and corresponding systems and computer-readable mediums. A method includes detecting, in the management system, a fault condition in a management system device during an analysis period. The method includes determining the duration of the fault condition in the management system device during the analysis period. The method includes determining a total duration of a system state during the analysis period in which the management system device could produce the fault condition. The method includes assigning a prioritization to the fault condition according to the duration of the fault condition and the total duration of the system state. The method includes storing the prioritization of the fault condition.

Claims (30)

1. A method for fault analysis in a building management system, comprising:

detecting, in the building management system, a fault condition in a management system device during an analysis period;

determining, by the building management system, the duration of the fault condition in the management system device during the analysis period;

determining, by the building management system, a total duration of a system state during the analysis period in which the management system device could produce the fault condition;

assigning a prioritization to the fault condition, by the building management system, according to the duration of the fault condition and the total duration of the system state;

storing the prioritization for operating the building management system;

wherein a plurality of fault conditions for different management system devices are detected, and the plurality of fault conditions are ranked according to the respective prioritizations; and

wherein the total duration of the system state during the analysis period in which the management system device could produce the fault condition is less than the total analysis period.

2. The method of claim 1 , wherein the prioritization is assigned according to a ratio of the duration of the fault condition to the total duration.

3. The method of claim 1 , wherein the management system is a building management system and the system state is one of heating, cooling, ventilating, access control, intrusion detection, lighting, or elevator operation.

4. The method of claim 1 , wherein the management system device is one of a boiler, management station, chiller, pump, valve, thermostat, fire panel, smoke detector, meter, motor, fan, fire sensor, smoke sensor, temperature sensor, lighting equipment, intrusion sensor, elevator sensor, or controller.

5. The method of claim 1 , wherein a higher prioritization is assigned to a fault condition with a higher ratio of the duration of the fault condition to the total duration.

6. A building management system comprising:

a processor; and

an accessible memory, the processor particularly configured to perform by:

detecting a fault condition in a management system device during an analysis period;

determining the duration of the fault condition in the management system device during the analysis period;

determining a total duration of a system state during the analysis period in which the management system device could produce the fault condition;

assigning a prioritization to the fault condition according to the duration of the fault condition and the total duration of the system state;

storing the prioritization for operating the building management system;

wherein a plurality of fault conditions for different management system devices are detected, and the plurality of fault conditions are ranked according to the respective prioritizations; and

wherein the total duration of the system state during the analysis period in which the management system device could produce the fault condition is less than the total analysis period.

7. A non-transitory computer-readable medium encoded with executable instructions that, when executed, cause one or more processors to perform by:

detecting a fault condition in a management system device during an analysis period;

determining the duration of the fault condition in the management system device during the analysis period;

determining a total duration of a system state during the analysis period in which the management system device could produce the fault condition;

assigning a prioritization to the fault condition according to the duration of the fault condition and the total duration of the system state;

storing the prioritization for operating a building management system;

wherein a plurality of fault conditions for different management system devices are detected, and the plurality of fault conditions are ranked according to the respective prioritizations; and

wherein the total duration of the system state during the analysis period in which the management system device could produce the fault condition is less than the total analysis period.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2016
From: COHEN, HENRIK
To: COHENWARE APS
Reel/Frame 040155/0428 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2016
From: COHENWARE APS
To: SIEMENS SCHWEIZ AG
Reel/Frame 040155/0507 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2016
From: WARNER, GREGORY C.
To: SIEMENS INDUSTRY INC.
Reel/Frame 040155/0598 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2016
From: SIEMENS INDUSTRY, INC.
To: SIEMENS SCHWEIZ AG
Reel/Frame 040155/0616 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 27, 2016
From: GARTNER, ROBERT
To: SIEMENS SCHWEIZ AG
Reel/Frame 040155/0663 →
Continuity (2)
Provisional Application 62003928 · May 28, 2014
Related Publication 20170052536A1 · Feb 23, 2017
Cited By (3)
US 12,198,529 US 12,341,676 US 12,456,077