IP Library Granted Patent US 10,890,294
Granted Patent B2
US 10,890,294 · App. 15/831,522 · Granted Jan 12, 2021

Virtual gaseous fuel pipeline

Inventors: Pedro T. Santos (Houston, TX); Scott Rackey (Bedford, MA); Jeremy Pitts (Boston, MA); Aaron Hilber (Houston, TX); Kolar L. Seshasai (Houston, TX); Pedro Vergel (Houston, TX); Jimmy Romanos (Houston, TX)
Assignee: NEARSHORE NATURAL GAS, LLC
F17C13/00F17C5/02F17C5/06F17C7/00F17C2201/0109F17C2201/035F17C2201/054F17C2205/0107F17C2205/0111F17C2205/0142F17C2205/0146F17C2205/0161F17C2205/0176F17C2205/0352F17C2205/0397F17C2221/033F17C2223/0123F17C2223/0161F17C2223/033F17C2223/035F17C2225/0123F17C2225/0161F17C2225/033F17C2225/035F17C2227/0346F17C2227/0397F17C2250/034F17C2250/036F17C2250/043F17C2250/0439F17C2250/0443F17C2250/0447F17C2250/0456F17C2250/0478F17C2250/0652F17C2265/061F17C2265/063F17C2265/065F17C2270/0171Y10T137/0318
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,890,294
App. No.
15/831,522
Granted
Jan 12, 2021
Kind
B2
Abstract

Various embodiments provide an end-to-end gaseous fuel transportation solution without using physical pipelines. A virtual pipeline system and methods thereof may involve transportation of gaseous fuels including compressed natural gas (CNG), liquefied natural gas (LNG), and/or adsorbed natural gas (ANG). An exemplary pipeline system may include a gas supply station, a mother station for treating gaseous fuels from the gas supply station, a mobile transport system for receiving and transporting the gaseous fuels, and user site for unloading the gaseous fuels from the mobile transport system. The unloaded gaseous fuels can be further used or distributed.

Claims (10)

1. A system for transferring compressed gas from a gas supply to a destination storage vessel, the system comprising:

first and second flow paths each extending from the gas supply to the destination storage vessel, wherein the first and second flow paths diverge from each other downstream from the gas supply and then converge with each other upstream from the destination storage vessel;

a refrigeration unit operatively connected to the second flow path at a location between the divergence and convergence, wherein the refrigeration unit is configured to cool compressed gas within the second flow path; and

at least one valve configured to control which of the first and second flow paths is used to transfer compressed gas from the gas supply to the destination storage vessel,

wherein the at least one valve comprises an automated valve that is configured to shift from transferring a compressed gas along the first flow path to transferring compressed gas along the second flow path in response to a pressure of compressed gas in the destination storage vessel rising above a predetermined pressure.

2. The system of claim 1 , further comprising a compressor that is disposed in both the first and second flow paths.

3. The system of claim 1 , wherein the first flow path is an uncooled flow path.

4. The system of claim 1 , further comprising an uncooled storage vessel disposed in the first flow path.

5. The system of claim 1 , wherein the second flow path comprises a cooled storage vessel that is configured to be cooled by the refrigeration unit.

6. The system of claim 1 , wherein the at least one valve comprises an automated valve that is configured to shift from transferring a compressed gas along the first flow path to transferring compressed gas along the second flow path in response to a temperature of compressed gas in the destination storage vessel rising above a predetermined temperature.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2021
From: ROMANOS, JIMMY; SANTOS, PEDRO T.; RACKEY, SCOTT
To: OSCOMP SYSTEMS INC.
Reel/Frame 055690/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2021
From: SANTOS, PEDRO T.; RACKEY, SCOTT; PITTS, JEREMY; HILBER, AARON; SESHASAI, KOLAR L.; VERGEL, PEDRO
To: OSCOMP SYSTEMS INC.
Reel/Frame 055690/0057 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2021
From: HICOR TECHNOLOGIES, INC.
To: OSCOMP HOLDINGS LLC
Reel/Frame 055690/0170 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2021
From: OSCOMP HOLDINGS, LLC
To: NEARSHORE NATURAL GAS, LLC
Reel/Frame 055690/0209 →
CHANGE OF NAME Recorded Mar 23, 2021
From: OSCOMP SYSTEMS INC.
To: HICOR TECHNOLOGIES, INC.
Reel/Frame 055695/0149 →
Continuity (6)
Division 14423609
Provisional Application 61787503 · Mar 15, 2013
Provisional Application 61799229 · Mar 15, 2013
Provisional Application 61737531 · Dec 14, 2012
Provisional Application 61693193 · Aug 24, 2012
Related Publication 20180094772A1 · Apr 5, 2018
Cited By (8)
US 12,315,317 US 12,418,633 US 12,544,601 US 12,553,626 US 12,605,572 US 12,658,019 US 12,664,870 US 12,734,376