IP Library › Granted Patent US 10,641,414
Granted Patent B2
US 10,641,414 · App. 16/000,628 · Granted May 5, 2020

Method of filling and sealing a microtrench

Inventors: Angelo J. Pino, Jr. (New York, NY); Daniel Urban (Austin, TX)
Assignee: CCIIP LLC
F16L1/11E02F5/08E02F5/10E02F5/101E02F5/12E02F5/226E02F9/245F16L1/028H02G1/06H02G9/02H02G9/025H02G9/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,641,414
App. No.
16/000,628
Granted
May 5, 2020
Kind
B2
Abstract

Provided is a microtrench fill comprising concrete, a polymer, and a colorant. Also provided is a method of using the microtrench fill to fill a microtrench in a street or walkway.

Claims (38)

1. A method of simultaneously filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct on a roadway to return the roadway to substantially an original state with a color-matched, filled and sealed microtrench comprising:

forming a flowable concrete-based fill comprising cement, a polymer bonding agent, a colorant, an aggregate, and water, wherein the colorant provides the fill with a color substantially matching the color of the roadway, the polymer bonding agent provides adhesion to the existing roadway, and the flowable concrete-based fill is configured to flow into the microtrench from a fill device; and

filling the microtrench with the flowable concrete-based fill material from the fill device to cover the optical fiber and/or innerduct/microduct, fill and seal the microtrench and return the roadway back to an original state with the color-matched, filled and sealed microtrench in one step.

2. The method according to claim 1 , wherein the aggregate comprises sand.

3. The method according to claim 1 , wherein the aggregate comprises spoil formed by ground up roadway from cutting the mictrotrench in the roadway.

4. The method according to claim 1 , wherein the bonding agent bonds to the microtrench and provides a seal to the roadway.

5. The method according to claim 1 , further comprising altering a slump or viscosity of the flowable concrete-based fill by altering a water content to control a flow rate and application of the flowable concrete-based fill into the mictrotrench.

6. The method according to claim 1 , further comprising forming the flowable concrete-based fill so that the flowable concreted-based fill flows from the fill device into the microtrench having a width of less than 2 inches and a depth of 2 inches to 20 inches.

7. The method according to claim 1 , further comprising cutting the microtrench using a microtrencher, and laying the optical fiber cable or innerduct/microduct within the microtrench.

8. The method according to claim 7 , further comprising forming the flowable concrete-based fill so that the flowable concreted-based fill flows from the fill device into the microtrench having a width of less than 2 inches and a depth of 2 inches to 20 inches.

9. The method according to claim 1 , wherein the roadway comprises asphalt or cement.

10. The method according to claim 1 , further comprising transporting at least a portion of a spoil from the micro-trencher to a first container constructed to contain the spoil using at least one spoil transporting device; and laying the cable and/or innerduct/microduct in the micro-trench from a reel device.

11. The method according to claim 10 , wherein the steps of transporting the spoil from the micro-trencher to the first container constructed to contain spoil using a first spoil transporting device and laying at least one of the cable and innerduct/microduct in the micro-trench from a reel device are conducted using the micro-trencher using a multifunctional reel carrier, spoil material handling container device comprising:

a first truck or first trailer;

the first container constructed to contain the spoil being on the first truck or first trailer; and

the at least one spoil transporting device constructed to transfer the spoil from the micro trencher and deposit the spoil in the first container.

12. The method according to claim 11 , further comprising using the at least one spoil transporting device to transport the at least a portion of the spoil from the first container to the fill device, wherein the fill comprises at least a portion of the spoil.

13. The method according to claim 11 , wherein the at least one spoil transporting device comprises at least one vacuum device and using the first vacuum device to vacuum spoil from the micro trencher and deposit the spoil into the first container.

14. The method according to claim 11 , wherein the at least one spoil transporting device comprises a second spoil transporting device comprising at least one second vacuum device, and using the at least one second vacuum device to transfer at least a portion of the spoil from the first container to the fill device.

15. A method of simultaneously filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct on a roadway to return the roadway to substantially an original state with a filled and sealed microtrench comprising:

forming a flowable concrete-based fill comprising cement, a polymer bonding agent, an aggregate, and water, wherein the polymer bonding agent provides adhesion to the existing roadway, and the flowable concrete-based fill is configured to flow into the microtrench from a fill device; and

filling the microtrench with the flowable concrete-based fill material from the fill device to simultaneously cover the optical fiber and/or innerduct/microduct, fill and seal the microtrench and return the roadway back to an original state with the filled and sealed microtrench in one step.

16. The method according to claim 15 , wherein the aggregate comprises sand.

17. The method according to claim 15 , wherein the aggregate comprises spoil formed by ground up roadway from cutting the mictrotrench in the roadway.

18. The method according to claim 15 , wherein the bonding agent bonds to the microtrench and provides a seal to the roadway.

19. The method according to claim 15 , further comprising altering a slump or viscosity of the flowable concrete-based fill by altering a water content to control a flow rate and application of the flowable concrete-based fill into the mictrotrench.

20. The method according to claim 15 , further comprising forming the flowable concrete-based fill so that the flowable concreted-based fill flows from the fill device into the microtrench having a width of less than 2 inches and a depth of 2 inches to 20 inches.

21. The method according to claim 15 , further comprising cutting the microtrench using a microtrencher, and laying the optical fiber cable or innerduct/microduct within the microtrench.

22. The method according to claim 21 , further comprising forming the flowable concrete-based fill so that the flowable concreted-based fill flows from the fill device into the microtrench having a width of less than 2 inches and a depth of 2 inches to 20 inches.

23. The method according to claim 15 , wherein the roadway comprises asphalt or cement.

24. The method according to claim 15 , further comprising transporting at least a portion of a spoil from the micro-trencher to a first container constructed to contain the spoil using at least one spoil transporting device; and laying the cable and/or innerduct/microduct in the micro-trench from a reel device.

25. The method according to claim 24 , wherein the steps of transporting the spoil from the micro-trencher to the first container constructed to contain the spoil using a first spoil transporting device and laying at least one of the cable and innerduct/microduct in the micro-trench from a reel device are conducted using the micro-trencher using a multifunctional reel carrier, spoil material handling container device comprising:

a first truck or first trailer;

the first container constructed to contain the spoil being on the first truck or first trailer; and

the at least one spoil transporting device constructed to transfer the spoil from the micro trencher and deposit the spoil in the first container.

26. The method according to claim 24 , further comprising using the at least one spoil transporting device to transport at least a portion of the spoil from the first container to the fill device, wherein the fill comprises at least a portion of the spoil.

27. The method according to claim 24 , wherein the at least one spoil transporting device comprises the at least one vacuum device and using the first vacuum device to vacuum spoil from the micro trencher and deposit the spoil into the first container.

28. The method according to claim 24 , wherein the at least one spoil transporting device comprises a second spoil transporting device comprising at least one second vacuum device, and using the at least one second vacuum device to transfer at least a portion of the spoil from the first container to the fill device.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2019
From: CORBEL COMMUNICATIONS INDUSTRIES, LLC
To: CCIIP LLC
Reel/Frame 051166/0397 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 1, 2019
From: PINO, ANGELO J., JR.; URBAN, DANIEL
To: CORBEL COMMUNICATIONS INDUSTRIES, LLC
Reel/Frame 048756/0627 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 24, 2018
From: PINO, ANGELO J.; URBAN, DANIEL
To: CORBEL COMMUNICATIONS INDUSTRIES, LLC
Reel/Frame 047295/0190 →
Continuity (9)
Continuation 15878945 · Jan 24, 2018
Continuation In Part 15785967 · Oct 17, 2017
Provisional Application 62458370 · Feb 13, 2017
Provisional Application 62537723 · Jul 27, 2017
Provisional Application 62551311 · Aug 29, 2017
Provisional Application 62554562 · Sep 5, 2017
Provisional Application 62409486 · Oct 18, 2016
Provisional Application 62432428 · Dec 9, 2016
Related Publication 20180292027A1 · Oct 11, 2018
Cited By (4)
US 12,281,459 US 12,398,074 US 12,420,451 US 12,428,793