IP Library › Granted Patent US 12,428,793
Granted Patent B2
US 12,428,793 · App. 18/195,988 · Granted Sep 30, 2025

Microtrench gravel installer and method of filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct using the microtrench gravel installer

Inventor: Angelo J. Pino, Jr. (New York, NY)
Assignee: CCIIP LLC
E01C23/0973
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,428,793
App. No.
18/195,988
Granted
Sep 30, 2025
Kind
B2
Abstract

A microtrench gravel installer configured to install gravel into a microtrench at a precise gravel layer thickness using a gravel leveler and/or a premeasured gravel box. A hot patch fill wand and box surrounding the wand configured for installing a hot patch fill sealant into a microtrench. A method of filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct using the microtrench gravel installer to precisely fill a microtrench to a desired gravel layer thickness.

Claims (42)

1. A method of continuously filling and sealing a microtrench in a shoulder of a roadway containing an optical fiber and/or innerduct or microduct to return the shoulder to substantially an original state comprising:

flowing gravel from a gravel dispenser into a microtrench containing the optical fiber and/or innerduct or microduct to provide a gravel layer over the optical fiber and/or i innerduct or microduct in the microtrench, and the gravel dispenser travelling in a first direction;

scraping the gravel layer in the first direction with a gravel leveler having a scraping surface and a bottom surface;

adjusting a distance between the bottom surface and a bottom of the microtrench to provide a gravel layer thickness, gravel below the bottom surface remaining in place during scraping to provide the gravel layer and gravel above the bottom surface contacting the scraping surface and moving in the first direction;

tamping the gravel layer with a gravel tamper that contacts a top surface of the gravel layer and travels in the first direction; and

installing a fill sealant above the gravel layer to seal and fill the microtrench to substantially return the shoulder of the roadway back to an original state with a filled and sealed microtrench that protects the optical fiber and/or innerduct or microduct in the microtrench from weather and traffic travelling on the shoulder.

2. The method according to claim 1 , wherein the shoulder comprises asphalt and/or cement.

3. The method according to claim 1 , wherein the scraping surface has a spatula shape, a convex shape, or a concave shape.

4. The method according to claim 1 , wherein the gravel leveler has a wheel that contacts a surface of the shoulder and the gravel leveler is biased towards the bottom of the microtrench.

5. The method according to claim 4 , wherein the biasing is provided by a spring, air pressure, hydraulic pressure, or weight.

6. The method according to claim 4 , wherein the biasing is weight provided by added weight.

7. The method according to claim 4 , wherein the biasing is provided a gravel leveler connection to the gravel dispenser.

8. The method according to claim 1 , further comprising vibrating the gravel leveler.

9. The method according to claim 1 , wherein the gravel layer thicknesses is from about 1 inch to about 12 inches.

10. The method according to claim 1 , wherein a top surface of the gravel layer is about 1 to about 6 inches below a surface of the shoulder.

11. The method according to claim 1 , wherein the gravel tamper comprises a wheel.

12. The method according to claim 11 , wherein the gravel tamper is biased towards the bottom of the microtrench to provide pressure against the gravel layer.

13. The method according to claim 12 , wherein the biasing is provided by a spring, air pressure, hydraulic pressure, or weight.

14. The method according to claim 1 , further comprising flowing gravel from the gravel dispenser into a premeasured gravel box to form a premeasured amount of gravel, and then flowing the premeasured amount of gravel into the microtrench.

15. The method according to claim 1 , wherein the fill sealant comprises a hot patch fill sealant, and the method comprising applying the hot patch fill sealant into the microtrench using a wand surrounded by a hot patch box that contains overfill or spillage of the hot patch fill sealant.

16. The method according to claim 1 , wherein the microtrench has a width of 1 to 3 inches and the gravel has a size of 0.5 to 0.75 inches.

17. The method according to claim 1 , wherein the microtrench has a width of 3 to 6 inches and the gravel has a size of 0.75 to 1 inches.

18. A method of continuously filling and sealing a microtrench in a shoulder of a roadway containing an optical fiber and/or innerduct or microduct to return the shoulder to substantially an original state comprising:

flowing gravel from a gravel dispenser into a premeasured gravel box to form a premeasured amount of gravel;

flowing the premeasured amount of gravel from the premeasured gravel box into a microtrench containing the optical fiber and/or innerduct or microduct to provide a gravel layer over the optical fiber and/or innerduct or microduct in the microtrench;

tamping the gravel layer with a gravel tamper that contacts a top surface of the gravel layer and travels in the first direction; and

installing a fill sealant above the gravel layer to seal and fill the microtrench to substantially return the shoulder back to an original state with a filled and sealed microtrench that protects the optical fiber and/or innerduct or microduct in the microtrench from weather and traffic travelling on the shoulder.

19. The method according to claim 18 , further comprising inserting a gravel box guide into the microtrench and guiding the premeasured gravel box with the gravel box guide.

20. The method according to claim 18 , wherein the shoulder comprises asphalt and/or cement.

21. The method according to claim 18 , wherein the microtrench has a width of 1 to 3 inches and the gravel has a size of 0.25 to 1 inch.

22. The method according to claim 18 , wherein the microtrench has a width of 3 to 6 inches and the gravel has a size of 0.25 to 1.5 inches.

23. The method according to claim 18 , wherein the scraping surface has a spatula shape, a convex shape, or a concave shape.

24. The method according to claim 18 , wherein the gravel leveler has a wheel that contacts a surface of the shoulder and the gravel leveler is biased towards the bottom of the microtrench.

25. The method according to claim 24 , wherein the biasing is provided by a spring, air pressure, hydraulic pressure, or weight.

26. The method according to claim 24 , wherein the biasing is weight provided by added weight.

27. The method according to claim 24 , wherein the biasing is provided a gravel leveler connection to the gravel dispenser.

28. The method according to claim 18 , further comprising vibrating the gravel leveler.

29. The method according to claim 18 , wherein the gravel layer thicknesses is from about 1 inch to about 12 inches.

30. The method according to claim 18 , wherein a top surface of the gravel layer is about 1 to about 6 inches below a surface of the shoulder.

31. The method according to claim 18 , wherein the gravel tamper comprises a wheel.

32. The method according to claim 31 , wherein the gravel tamper is biased towards the bottom of the microtrench to provide pressure against the gravel layer.

33. The method according to claim 32 , wherein the biasing is provided by a spring, air pressure, hydraulic pressure, or weight.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 11, 2023
From: PINO, ANGELO J., JR
To: CCIIP LLC
Reel/Frame 063609/0726 →
Continuity (3)
Continuation In Part 17199494 · Mar 12, 2021
Provisional Application 63147828 · Feb 10, 2021
Related Publication 20230279621A1 · Sep 7, 2023
References Cited (67)
US 2910789A · Hopkins · 1959 [cited by examiner]
US 4028902A · Courson · 1977 [cited by examiner]
US 4434861A · Howeth · 1984 [cited by applicant]
US 4462715A · Ashbaugh · 1984 [cited by examiner]
US 4668548A · Lankard · 1987 [cited by applicant]
US 4744693A · Smith · 1988 [cited by applicant]
US 4806043A · Fournier · 1989 [cited by examiner]
US 4812078A · Rivard · 1989 [cited by applicant]
US 5174685A · Buchanan · 1992 [cited by examiner]
US 5244304A · Weil · 1993 [cited by applicant]
US 5452969A · Crook · 1995 [cited by examiner]
US 5556225A · Marino · 1996 [cited by examiner]
US 5879109A · Finzel · 1999 [cited by examiner]
US 5913638A · Lansdale · 1999 [cited by applicant]
US 6371691B1 · Finzel · 2002 [cited by examiner]
US 6604432B1 · Hamblen · 2003 [cited by examiner]
US 7914618B1 · Krozel · 2011 [cited by applicant]
US 8596914B2 · Baber · 2013 [cited by examiner]
US 9203226B2 · Miller · 2015 [cited by applicant]
US 9485468B2 · Pino · 2016 [cited by applicant]
US 9562343B2 · Paull · 2017 [cited by examiner]
US 10311102B2 · Pino · 2019 [cited by applicant]
US 10571045B2 · Pino · 2020 [cited by applicant]
US 10571047B2 · Pino · 2020 [cited by applicant]
US 10641414B2 · Pino · 2020 [cited by applicant]
US 20040149174A1 · Farrington · 2004 [cited by applicant]
US 20050036749A1 · Vogel · 2005 [cited by applicant]
US 20050189127A1 · Martin · 2005 [cited by applicant]
US 20070177945A1 · Paull · 2007 [cited by examiner]
US 20100028080A1 · Wallace · 2010 [cited by examiner]
US 20130011198A1 · Purcell · 2013 [cited by applicant]
US 20130284070A1 · Dubey · 2013 [cited by applicant]
US 20150125218A1 · Gustavsson · 2015 [cited by applicant]
US 20160108606A1 · Strutynsky · 2016 [cited by examiner]
US 20160369610A1 · Wright · 2016 [cited by applicant]
US 20160376767A1 · Miller · 2016 [cited by applicant]
US 20180106015A1 · Pino · 2018 [cited by examiner]
US 20180156357A1 · Pino · 2018 [cited by applicant]
US 20180292027A1 · Pino · 2018 [cited by applicant]
US 20190086002A1 · Pino · 2019 [cited by applicant]
US 20190226603A1 · Pino · 2019 [cited by applicant]
CA 2348062 · 2001 [cited by applicant]
WO 2016088083 · 2016 [cited by applicant]
Camplex Fiber Optic Extender, http://www.camplex.com/product.aspx?item=CMX-TACNGO-SDI, Oct. 17, 2017 pp. 1-2. [cited by applicant]
Corning Fiber Optic Extenders, https://www.corning.com/worldwide/en/products/communication-networks/products/fiber.html, Oct. 17, 2017 pp. 1-7. [cited by applicant]
SC Polymer, https://www.surecretedesign.com/product/liquid-concrete-polymer/, Oct. 17, 2017 p. 1. [cited by applicant]
SCAG Giant VAC, http://www.giant-vac.com/, Oct. 17, 2017 pp. 1-2. [cited by applicant]
DR Power Vacuum, https://www.drpower.com/, Oct. 17, 2017 pp. 1-2. [cited by applicant]
Billy Goat vaccum, www.billygoat.com, Oct. 17, 2017 pp. 1-2. [cited by applicant]
Ditch Witch, www.ditchwitch.com, Oct. 17, 2017 p. 1. [cited by applicant]
Trenchers, www.vermeer.com, Oct. 17, 2017 pp. 1-15. [cited by applicant]
Trenchers, www.samarais.com, Oct. 17, 2017 pp. 1-2 . [cited by applicant]
King, “Google Fiber finishes digging very shallow grave in Louisville, KY. #RIP,” https:/lwww.pocketables.com/2019/021 Joogle-fiber-finishes-digging-very-shallow-grave-in-louisville-ky-rip.html, published on Pocketable … [cited by applicant]
Blum, “Microtrenching fail drives Google Fiber out of Louisville,” https:/lwww.tellusventure.com/blog/microtrenching- ail-drives-google-fiber-out--of-louisville/, published on Tellus Venture Associates, Feb. 8, 2019, pp… [cited by applicant]
Otts, “Where is Google Fiber? Mostly in the Highlands, records show,” hllps://www.wdrb.com/news/business/sunday- 3edition-where-is-google-fiber-moslly-in-the-highlands/article _ 569112e0-421 e-58ef-be24-c2e42e5e53d2.htm… [cited by applicant]
FASTRACT 400 material data sheet Aug. 23, 2018, pp. 1-4. [cited by applicant]
https://www.youtube.com/watch?v=0CGi92UK4Tw, Optic Fiber nastro in Torino, published Mar. 7, 2016, Garbin Group, pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=klWluvLc5cl, The Ditch Witch MT12 MicroTrencher: Faster, Cleaner, Better, published Jun. 14, 2016, pp. 1-4. [cited by applicant]
https://www.youtube.com/watch?v=VWryq2nOA3U, Micro trenching | MTT-system, published Sep. 26, 2016, www.mttsystem.com, pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=7xf2Ujax9hU, published Nov. 10, 2011, Micro-Trenching—alternative Möglichkeit zur Verlegung von Glasfaserkabeln, [email protected], pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=OlxA3gqNPkE, BVS-net, microtrenching, published Nov. 29, 2014, www. bvs-net.eu, pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=929vJtv5Uxw, www, dellcron.com, published Feb. 10, 2018, pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=8p4xHlwuMhl, Americicom, www.americomtech.com, Microtrenching, published Jun. 10, 2017, pp. 1-3. [cited by applicant]
https://www.youtube.com/watch?v=57NBkB1y8iM, published Jan. 14, 2014, KNET Micro Trenching Solution, pp. 1-4. [cited by applicant]
Geophysical Survey Systems, www.geophysical.com/products, pp. 1-23, 2020. [cited by applicant]
UtilityScan DF, quick start guide, MN72-489, pp. 1-68, pp. 2017-2018. [cited by applicant]
Board of Appeals Decision issued in U.S. Appl. No. 17/199,494, Feb. 28, 2025, pp. 1-8. [cited by applicant]