IP Library › Granted Patent US 11,009,260
Granted Patent B2
US 11,009,260 · App. 16/243,276 · Granted May 18, 2021

System and method for accellerated heating of a fluid

Inventor: Ray Oliver Knoeppel (Hartland, WI)
Assignee: A. O. SMITH CORPORATION
F24H9/2021F24H1/202F24H9/02F24H9/1818G01D3/028G01D3/08G05B15/02G06F1/206
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,009,260
App. No.
16/243,276
Filed
Jan 9, 2019
Granted
May 18, 2021
Kind
B2
Art Unit
2116
USPC
700/300
Abstract

A water heating system including a tank, a first heating element, a second heating element, a first temperature sensor, a second temperature sensor, a controller having an electronic processor and a memory. The controller is configured to determine an output temperature setpoint, determine whether a period of expected high water demand is approaching, and in response to determining that the period of expected high water demand is approaching, activate the second heating element. The controller is further configured to deactivate the second heating element when a second temperature sensed by the second temperature sensor crosses a second temperature threshold, activate the first heating element when the second temperature crosses the second temperature threshold, and deactivate the first heating element. Wherein the first temperature threshold is lower than the second temperature threshold and the first and second temperature thresholds are higher than the output temperature setpoint.

Claims (48)

1. A water heating system comprising:

a tank;

a first heating element coupled to an upper portion of the tank;

a second heating element coupled to a lower portion of the tank;

a first temperature sensor configured to sense a first temperature of fluid within the upper portion of the tank;

a second temperature sensor configured to sense a second temperature of fluid within the lower portion of the tank; and

a controller having an electronic processor and a memory, the controller configured to:

receive the first temperature from the first temperature sensor;

receive the second temperature from the second temperature sensor;

determine an output temperature setpoint; and

determine whether a period of expected high water demand is approaching, and in response to determining that a period of expected high water demand is approaching:

set a first temperature threshold higher than the output temperature setpoint,

set a second temperature threshold higher than the first temperature threshold,

operate the second heating element until the second temperature reaches the first temperature threshold,

operate the first heating element after the second temperature reaches the first temperature threshold until the first temperature reaches the second temperature threshold, and

maintain the fluid within the lower portion of the tank at a lower temperature than the fluid within the upper portion of the tank during the period of expected high water demand.

2. The water heating system of claim 1 , further comprising an input/output device operably coupled to the controller and configured to provide the output temperature setpoint to the controller.

3. The water heating system of claim 1 , wherein the controller is further configured to compare a current day and time to one or more schedules stored in the memory in order to determine whether the period of expected high water demand is approaching.

4. The water heating system of claim 1 , wherein the controller is further configured to monitor water usage over a period of time in order to determine whether the period of expected high water demand is approaching.

5. The water heating system of claim 1 , wherein the controller is further configured to maintain the fluid at the output temperature setpoint after determining that the period of expected high water demand has elapsed.

6. The water heating system of claim 1 , wherein the second temperature threshold is at least 30° F. higher than the predetermined setpoint temperature.

7. The water heating system of claim 1 , wherein the first temperature threshold is at least 10° F. higher than the predetermined setpoint temperature.

8. The water heating system of claim 1 , wherein the first temperature threshold is no more than 30° F. higher than the predetermined setpoint temperature.

9. The water heating system of claim 1 , wherein a difference between the predetermined setpoint temperature and the first temperature threshold is greater than a difference between the first temperature threshold and the second temperature threshold.

10. A method of heating a fluid within a tank, comprising:

determining, via an electronic processor, that a period of expected high water demand is approaching;

determining, via the electronic processor, a predetermined setpoint temperature;

setting a first and a second temperature threshold, the first temperature threshold being higher than the predetermined setpoint temperature and the second temperature threshold being higher than the first temperature threshold;

activating a lower heating element of the tank until a lower temperature of the tank reaches the first temperature threshold; and

activating an upper heating element of the tank after the lower temperature reaches the first temperature threshold, until an upper temperature of the tank reaches the second temperature threshold.

11. The method of claim 10 , wherein the second temperature threshold is at least 30° F. higher than the predetermined setpoint temperature.

12. The method of claim 11 , wherein the first temperature threshold is at least 10° F. higher than the predetermined setpoint temperature.

13. The method of claim 12 , wherein the first temperature threshold is no more than 30° F. higher than the predetermined setpoint temperature.

14. The method of claim 11 , wherein a difference between the predetermined setpoint temperature and the first temperature threshold is greater than a difference between the first temperature threshold and the second temperature threshold.

15. The method of claim 10 , further comprising:

during the period of expected high water demand, calculating a first difference between the predetermined setpoint temperature and the upper temperature of the tank and a second difference between the predetermined setpoint temperature and the lower temperature of the tank; and

during the period of expected high water demand, activating the upper element only when the first difference exceeds a first differential and activating the lower element only when the second difference exceeds a second differential,

wherein the second differential is greater than the first differential.

16. The method of claim 15 , wherein the second differential is at least 10° F.

17. The method of claim 10 , further comprising:

determining that the period of expected high water demand has elapsed; and

maintaining the temperature of fluid within the tank at the predetermined setpoint temperature after determining that the period of expected high water demand has elapsed.

18. The method of claim 10 , wherein the step of determining that a period of expected high water demand is approaching includes determining a current day and time, and comparing the current day and time to one or more stored schedules.

19. The method of claim 10 , wherein the step of determining that a period of expected high water demand is approaching includes:

monitoring water usage over a period of time to learn when periods of expected high water demand may occur;

storing the periods of expected high water demand in a memory;

determining a current day and time; and

comparing the current day and time to the periods stored in the memory.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2019
From: KNOEPPEL, RAY OLIVER
To: A. O. SMITH CORPORATION
Reel/Frame 050922/0027 →
Continuity (2)
Provisional Application 62615171 · Jan 9, 2018
Related Publication 20190212035A1 · Jul 11, 2019
Cited By (1)
US 12,392,525