Binder composition for improved tack coat and stress absorbing membrane interlayer application for road construction

Inventors: Anthony J. Kriech (Indianapolis, IN); Marvin Exline (Terre Haute, IN); James Joseph Cunningham (Greensburg, PA); Andreas Redick Horton (Plainfield, IN)
Assignee: Heritage Research Group
E01C7/325C08L95/00E01C7/185E01C7/187E01C7/32E01C19/12C08L2555/50C08L2555/54C08L2555/60C08L2555/80
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,487,459
App. No.
16/283,114
Granted
Nov 26, 2019
Kind
B2
Abstract

A method of installing an asphalt pavement, which method involves: identifying a surface to be paved; applying a non-tracking layer of binder composition to the surface; and permitting the application of an asphalt layer over the non-tracking layer of binder composition. The binder composition consists essentially of: at least one asphalt binder; at least one elastomer; and ethylene bis stearamide. In a further embodiment the binder composition consists essentially of: at least one asphalt binder; at least one elastomer; sulfur; and ethylene bis stearamide. The composition is applied as a tack coat and/or a stress absorbing membrane interlayer and is non-tracking.

Claims (31)

1. A method of installing an asphalt pavement, comprising:

identifying a surface to be paved;

applying a non-tracking layer of binder composition to the surface, wherein the binder composition consists essentially of:

at least one asphalt binder,

at least one elastomer, and

ethylene bis stearamide; and

permitting the application of an asphalt layer over the non-tracking layer of binder composition.

2. The method of claim 1 , wherein the at least one elastomer comprises an SBS polymer.

3. The method of claim 1 , wherein the at least one elastomer comprises about 2 to about 5 wt. % of the binder composition.

4. The method of claim 1 , wherein the at least one asphalt binder comprises about 85 to about 97 wt. % of the binder composition.

5. The method of claim 1 , wherein the surface comprises a pre-existing asphalt surface.

6. The method of claim 1 , wherein the asphalt layer is applied directly onto the non-tracking layer.

7. The method of claim 6 , wherein the asphalt layer comprises a hot-mix asphalt.

8. The method of claim 1 , wherein the ethylene bis stearamide comprises about 1 to about 5 wt. % of the binder composition.

9. The method of claim 1 , wherein the method further comprises permitting the binder composition to migrate upward into the asphalt layer.

10. A method of installing an asphalt pavement, comprising:

identifying a surface to be paved;

applying a non-tracking layer of binder composition to the surface, wherein the binder composition consists essentially of:

at least one asphalt binder,

at least one elastomer,

sulfur, and

ethylene bis stearamide; and

permitting the application of an asphalt layer over the non-tracking layer of binder composition.

11. The method of claim 10 , wherein the at least one elastomer comprises an SBS polymer.

12. The method of claim 10 , wherein the at least one elastomer comprises about 2 to about 5 wt. % of the binder composition.

13. The method of claim 10 , wherein the at least one asphalt binder comprises about 85 to about 97 wt. % of the binder composition.

14. The method of claim 10 , wherein the surface comprises a pre-existing asphalt surface.

15. The method of claim 10 , wherein the asphalt layer is applied directly onto the non-tracking layer.

16. The method of claim 15 , wherein the asphalt layer comprises a hot-mix asphalt.

17. The method of claim 10 , wherein the ethylene bis stearamide comprises about 1 to about 5 wt. % of the binder composition.

18. The method of claim 10 , wherein the method further comprises permitting the binder composition to migrate upward into the asphalt layer.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2021
From: HERITAGE RESEARCH GROUP
To: HERITAGE RESEARCH GROUP, LLC
Reel/Frame 057264/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 4, 2019
From: KRIECH, ANTHONY J.; EXLINE, MARVIN K.; CUNNINGHAM, JAMES JOSEPH; HORTON, ANDREAS REDICK
To: HERITAGE RESEARCH GROUP
Reel/Frame 048793/0995 →
Continuity (4)
Continuation 16105093 · Aug 20, 2018
Continuation 15622604 · Jun 14, 2017
Provisional Application 62349875 · Jun 14, 2016
Related Publication 20190186080A1 · Jun 20, 2019