IP Library Granted Patent US 11,242,677
Granted Patent B2
US 11,242,677 · App. 16/352,316 · Granted Feb 8, 2022

Corrugated stormwater chamber having sub-corrugations

Inventors: David J. Mailhot (Coventry, CT); Nimish Gandhi (Wethersfield, CT); Timothy J. McGrath (Arlington, MA)
Assignee: STORMTECH LLC
E03F1/003E02B11/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,242,677
App. No.
16/352,316
Granted
Feb 8, 2022
Kind
B2
Abstract

A plastic arch-shape cross section corrugated stormwater chamber has a multiplicity of crest corrugations and valley corrugations which run transverse to its length. Sub-corrugations run along part or all of the arch-curve lengths of either crest corrugations or valley corrugations, or along both of them. A sub-corrugations are smaller in dimension than an associated crest corrugation or valley corrugation. Sub-corrugations may taper in width and depth and may taper to nothingness. A compound convex shape end cap, useful for closing off the ends of stormwater chambers, has substantially vertical corrugations with analogous sub-corrugations.

Claims (40)

1. A chamber, comprising:

a first side base;

a second side base;

sidewalls extending from the first and second side bases;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber;

a plurality of crest sub-corrugations, wherein each crest sub-corrugation runs along a crest corrugation from the first side base to the second side base, wherein a width of each crest sub-corrugation is constant along the entire crest sub-corrugation; and

a plurality of valley sub-corrugations, wherein each valley sub-corrugation runs along a valley corrugation from the first side base to the second side base, wherein a width of each valley sub-corrugation is constant along the entire valley sub-corrugation.

2. The chamber of claim 1 , wherein a height of each crest sub-corrugation is less than a local height of the crest corrugation along which the crest sub-corrugation runs.

3. The chamber of claim 1 , wherein a height of each crest sub-corrugation is constant along the entire crest sub-corrugation.

4. The chamber of claim 1 , wherein the valley corrugations increase in width with elevation from the first and second side bases.

5. The chamber of claim 1 , wherein the crest corrugations decrease in width with elevation from the first and second side bases.

6. The chamber of claim 1 , wherein a height of each valley sub-corrugation is less than a depth of the valley corrugation along which the valley sub-corrugation runs.

7. The chamber of claim 1 , wherein a height of each valley sub-corrugation decreases as the valley sub-corrugation approaches the first and second side bases.

8. The chamber of claim 1 , wherein each crest sub-corrugation includes a first terminal end at the first side base and a second terminal end at the second side base.

9. The chamber of claim 1 , wherein each valley sub-corrugation includes a first terminal end above the first side base and a second terminal end above the second side base.

10. The chamber of claim 1 , wherein each valley sub-corrugation runs parallel with at least one adjacent crest corrugation.

11. A chamber, comprising:

a first side base;

a second side base;

sidewalls extending from the first and second side bases;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber;

a plurality of crest sub-corrugations, wherein each crest sub-corrugation includes a first terminal end at the first side base and a second terminal end at the second side base, wherein a width of each crest sub-corrugation is constant along the entire crest sub-corrugation; and

a plurality of valley sub-corrugations, wherein each valley sub-corrugation runs along a valley corrugation and includes a first terminal end at the first side base and a second terminal end at the second side base, wherein a width of each valley sub-corrugation is constant along the entire valley sub-corrugation.

12. The chamber of claim 11 , wherein a height of each crest sub-corrugation is less than a local height of the crest corrugation along which the crest sub-corrugation runs.

13. The chamber of claim 11 , wherein a height of each crest sub-corrugation is constant along the entire crest sub-corrugation.

14. The chamber of claim 11 , wherein each crest sub-corrugation runs along a crest corrugation from the first side base to the second side base.

15. The chamber of claim 11 , wherein each valley sub-corrugation includes a first terminal end above the first side base and a second terminal end above the second side base.

16. The chamber of claim 11 , wherein each valley sub-corrugation runs parallel with at least one adjacent crest corrugation.

17. A chamber, comprising:

opposing side bases;

a chamber top;

sidewalls extending from the opposing side bases to the chamber top;

a plurality of crest corrugations and a plurality of valley corrugations positioned along a length of the chamber;

a plurality of crest sub-corrugations, wherein each crest sub-corrugation is positioned on a crest corrugation and runs along the chamber top, wherein a width of each crest sub-corrugation is constant along the entire crest sub-corrugation; and

a plurality of valley sub-corrugations, wherein each valley sub-corrugation is positioned on a valley corrugation and runs along the chamber top and extends from a first opposing side base to a second opposing side base, wherein a width of each valley sub-corrugation is constant along the entire valley sub-corrugation.

18. The chamber of claim 17 , wherein each crest sub-corrugation extends from the first opposing side base to the second opposing side base.

19. The chamber of claim 17 , wherein each crest sub-corrugation includes a first terminal end at the first opposing side base and a second terminal end at the second opposing side base.

20. The chamber of claim 17 , wherein each valley sub-corrugation includes a first terminal end at the first opposing side base and a second terminal end at the second opposing side base.

21. The chamber of claim 17 , wherein each valley sub-corrugation includes a first terminal end above the first opposing side base and a second terminal end above the second opposing side base.

22. The chamber of claim 17 , wherein each valley sub-corrugation runs parallel with at least one adjacent crest corrugation.

Assignments (1)
SECURITY INTEREST Recorded Dec 13, 2019
From: STORMTECH LLC
To: BARCLAYS BANK PLC, AS ADMINISTRATIVE AGENT
Reel/Frame 051282/0496 →
Continuity (6)
Continuation 15497341 · Apr 26, 2017
Continuation 15017509 · Feb 5, 2016
Continuation 14165503 · Jan 27, 2014
Continuation 12802483 · Jun 7, 2010
Provisional Application 61217905 · Jun 5, 2009
Related Publication 20200056360A1 · Feb 20, 2020