IP Library Granted Patent US 10,577,674
Granted Patent B2
US 10,577,674 · App. 16/413,729 · Granted Mar 3, 2020

Coated steel strips, coated stamped products and methods

Inventors: Pascal Drillet (Rozerieulles, FR); Dominique Spehner (Balan, FR); Ronald Kefferstein (Saint Mitre les Ramparts, FR)
Assignee: ArcelorMittal
C21D9/46B32B15/012C23C2/12C23C2/26C23C2/40Y10T428/12389Y10T428/12396Y10T428/12757
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,577,674
App. No.
16/413,729
Granted
Mar 3, 2020
Kind
B2
Abstract

A pre-coated steel strip is provided. The steel strip includes a strip of base steel having a length, a width, a first side, and a second side. The length of the strip is at least 100 m and the width is at least 600 mm. An aluminum or an aluminum alloy pre-coating is on at least part of at least one of the first or second sides of the strip of base steel. A thickness t p of the pre-coating is from 20 to 33 micrometers at every location on at least one of the first or second sides. Processes, coated stamped products and land motor vehicles are also provided.

Claims (63)

1. A method for producing a precoated steel strip, the method comprising:

hot dip coating a strip of base steel having a length, a width, a first side, and a second side in an aluminum alloy to precoat at least one of the first and second sides of the strip of base steel with the aluminum alloy to define a precoating, the base steel including 0.15%<carbon<0.5% and 0.0005%<boron<0.08% by weight and the aluminum alloy including 8 to 11% silicon by weight, said length of said strip of base steel being at least 100 m and said width being at least 600 mm; and

controlling a thickness tp of the precoating to be between from 20 to 33 micrometers at every location on at least one of said first and second sides.

2. The method of claim 1 , wherein the controlling the thickness tp comprises controlling the thickness tp in both a longitudinal and a transverse direction of the strip.

3. The method of claim 1 , wherein the controlling the thickness tp comprises controlling the thickness tp to be from 20 to 33 micrometers at every location on both said first side and said second side.

4. The method of claim 1 , wherein the base steel further comprises the following components by weight based on total weight:

0.5%<manganese<3%;

0.1%<silicon<0.5%;

0.01%<chromium<1%;

titanium<0.2%;

aluminum<0.1%;

phosphorus<0.1%;

sulfur<0.05%;

iron;

and impurities inherent in processing.

5. The method of claim 4 , wherein the base steel comprises 20 ppm or less of sulfur.

6. The method of claim 1 , wherein the aluminum or aluminum alloy pre-coating further comprises from 2% to 4% iron by weight, the remainder being aluminum and impurities inherent in processing.

7. The method of claim 1 , further comprising measuring the thickness tp.

8. The method of claim 7 , wherein the measuring the thickness includes measuring the thickness with a plurality of thickness gauges located at different distances in a transverse direction of the strip.

9. The method of claim 1 , wherein the hot dip coating includes hot dip coating in a bath, and wherein the controlling the thickness tp includes blowing gas onto the strip after the strip exits from the bath.

10. The method of claim 9 , wherein the blowing includes blowing gas with a system of nozzles.

11. A method for producing a precoated steel strip, the method comprising:

coating a strip of base steel having a length, a width, a first side, and a second side in an aluminum alloy to precoat at least one of the first and second sides of the strip of base steel with the aluminum alloy to define a precoating, the base steel including 0.15%<carbon<0.5% and 0.0005%<boron<0.080% by weight and the aluminum alloy includes 8 to 11% silicon by weight, said length of said strip of base steel being at least 100 m and said width being at least 600 mm; and

controlling a thickness tp of the precoating to be between from 20 to 33 micrometers at every location on at least one of said first and second sides.

12. The method of claim 11 , wherein the controlling the thickness tp comprises controlling the thickness tp in both a longitudinal and a transverse direction of the strip.

13. The method of claim 11 , wherein the controlling the thickness tp comprises controlling the thickness tp to be from 20 to 33 micrometers at every location on both said first side and said second side.

14. The method of claim 11 , wherein the base steel further comprises the following components by weight based on total weight:

0.5%<manganese<3%;

0.1%<silicon<0.5%;

0.01%<chromium<1%;

titanium<0.2%;

aluminum<0.1%;

phosphorus<0.1%;

sulfur<0.05%;

iron;

and impurities inherent in processing.

15. The method of claim 14 , wherein the base steel comprises 20 ppm or less of sulfur.

16. The method of claim 11 , wherein the aluminum or aluminum alloy pre-coating further comprises from 2% to 4% iron by weight, the remainder being aluminum and impurities inherent in processing.

17. The method of claim 11 , further comprising measuring the thickness tp.

18. The method of claim 17 , wherein the measuring the thickness includes measuring the thickness with a plurality of thickness gauges located at different distances in a transverse direction of the strip.

19. The method of claim 11 , wherein the coating includes hot dip coating in a bath, and the controlling the thickness tp includes blowing gas onto the strip after the strip exits from the bath.

20. The method of claim 19 , wherein the blowing includes blowing gas with a system of nozzles.

21. A method for producing a precoated steel strip, the method comprising:

coating a strip of base steel having a length, a width, a first side, and a second side in aluminum or an aluminum alloy to precoat at least one of the first and second sides of the strip of base steel with the aluminum or aluminum alloy to define a precoating, the base steel including 0.15%<carbon<0.5% and 0.0005%<boron<0.08% by weight, the aluminum or aluminum alloy including at least 85% aluminum, said length of said strip of base steel being at least 100 m and said width being at least 600 mm; and

controlling a thickness tp of the precoating to be between from 20 to 33 micrometers at every location on at least one of said first and second sides.

22. The method of claim 21 , wherein the controlling the thickness tp comprises controlling the thickness tp in both a longitudinal and a transverse direction of the strip.

23. The method of claim 20 , wherein the controlling the thickness tp comprises controlling the thickness tp to be from 20 to 33 micrometers at every location on both said first side and said second side.

24. The method of claim 21 , wherein the base steel further comprises the following components by weight based on total weight:

0.5%<manganese<3%;

0.1%<silicon<0.5%;

0.01%<chromium<1%;

titanium<0.2%;

aluminum<0.1%;

phosphorus<0.1%;

sulfur<0.05%;

iron;

and impurities inherent in processing.

25. The method of claim 24 , wherein the base steel comprises 20 ppm or less of sulfur.

26. The method of claim 21 , wherein the aluminum or aluminum alloy pre-coating further comprises from 8 to 11% silicon by weight and from 2% to 4% iron by weight, the remainder being aluminum and impurities inherent in processing.

27. The method of claim 21 , further comprising measuring the thickness tp.

28. The method of claim 27 , wherein the measuring the thickness includes measuring the thickness with a plurality of thickness gauges located at different distances in a transverse direction of the strip.

29. The method of claim 21 , wherein the coating includes hot dip coating in a bath, and wherein the controlling the thickness tp includes blowing gas onto the strip after the strip exits from the bath.

30. The method of claim 29 , wherein the blowing includes blowing gas with a system of nozzles.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2019
From: SPEHNER, DOMINIQUE
To: ARCELORMITTAL FRANCE
Reel/Frame 051163/0977 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2019
From: DRILLET, PASCAL; KEFFERSTEIN, RONALD
To: ARCELORMITTAL
Reel/Frame 051164/0159 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2019
From: ARCELORMITTAL FRANCE
To: ARCELORMITTAL
Reel/Frame 051170/0556 →
Continuity (4)
Continuation 15606770 · May 26, 2017
Continuation 13621015 · Sep 15, 2012
Division 12447777
Related Publication 20190276912A1 · Sep 12, 2019