IP Library Granted Patent US 10,977,090
Granted Patent B2
US 10,977,090 · App. 16/566,836 · Granted Apr 13, 2021

System and method for managing a hybrid compute environment

Inventor: David Brian Jackson (Spanish Fork, UT)
Assignee: III Holdings 12, LLC
G06F9/5077G06F9/5083
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,977,090
App. No.
16/566,836
Granted
Apr 13, 2021
Kind
B2
Abstract

Disclosed are systems, hybrid compute environments, methods and computer-readable media for dynamically provisioning nodes for a workload. In the hybrid compute environment, each node communicates with a first resource manager associated with the first operating system and a second resource manager associated with a second operating system. The method includes receiving an instruction to provision at least one node in the hybrid compute environment from the first operating system to the second operating system, after provisioning the second operating system, pooling at least one signal from the resource manager associated with the at least one node, processing at least one signal from the second resource manager associated with the at least one node and consuming resources associated with the at least one node having the second operating system provisioned thereon.

Claims (37)

1. An apparatus comprising:

a processor; and

a memory including instructions that when executed by the processor cause the processor to:

receive an instruction from a workload manager to switch a computing node of a plurality of computing nodes from a first operating system to a second operating system;

provision the computing node with the second operating system;

allocate, to latency pool, data relating to a first signal from a first resource manager associated with the first operating system indicating a status of the computing node;

process a second signal from a second resource manager associated with the second operating system; and

resolve a conflict based on receiving a first indication from the first resource manager that the computing node is down and a second indication from the second resource manager that the computing node is active by ignoring the first indication, wherein the conflict is resolved by the apparatus, and wherein the apparatus is separate from the first and second resource managers.

2. The apparatus of claim 1 , wherein the instructions when executed further cause the processor to instruct, in response to processing the second signal from the second resource manager, the computing node to consume resources associated with the second operating system.

3. The apparatus of claim 1 , wherein the instructions when executed further cause the processor to allocate resources associated with the second operating system to the computing node.

4. The apparatus of claim 1 , wherein the instructions when executed further cause the processor to identify attributes that should persist to provision the computing node with an operating system different from the second operating system.

5. The apparatus of claim 1 , wherein the instructions when executed further cause the processor to generate a list of possible versions of a resource.

6. The apparatus of claim 5 , wherein the instructions when executed further cause the processor to generate one or more lists of attribute pools for each potential operating system.

7. The apparatus of claim 6 , wherein the generated lists of attribute pools are accessed when the computing node is provisioned with the second operating system.

8. The apparatus of claim 1 , wherein the first signal from the first resource manager includes one or more of a state, an attribute, a policy, or a constraint.

9. A method comprising:

switching a computing node from a first operating system to a second operating system;

allocating, to a latency pool, data relating to a first signal from a first resource manager associated with the first operating system, wherein the first signal from the first resource manager indicates a status of the computing node;

processing a second signal from a second resource manager associated with the second operating system;

instructing, in response to processing the second signal from the second resource manager, the computing node to consume resources associated with the second operating system; and

resolving a conflict based on receiving a first indication from the first resource manager that the computing node is down and a second indication from the second resource manager that the computing node is active by ignoring the first indication, wherein the conflict is resolved by an entity separate from the first and second resource managers.

10. The method of claim 9 , further comprising allocating resources associated with the second operating system to the computing node.

11. The method of claim 9 , further comprising identifying attributes that should persist to provision the computing node with an operating system different from the second operating system.

12. The method of claim 9 , further comprising generating a list of possible versions of a resource.

13. The method of claim 12 , further comprising generating one or more lists of attribute pools for each potential operating system.

14. The method of claim 13 , further comprising accessing the generated lists of attribute pools when the computing node is provisioned with the second operating system.

15. The method of claim 9 , wherein the first signal from the first resource manager includes one or more a state, an attribute, a policy, or a constraint.

16. A non-transitory computer readable medium having instructions stored thereon that, upon execution by a computing device, causes the computing device to perform operations comprising:

receiving an instruction from a workload manager to switch a computing node of a plurality of computing nodes from a first operating system to a second operating system;

provisioning the computing node with the second operating system;

allocating, to a latency pool, data relating to a first signal from a first resource manager associated with the first operating system indicating a status of the computing node;

processing a second signal from a second resource manager associated with the second operating system; and

resolving a conflict based on receiving a first indication from the first resource manager that the computing node is down and a second indication from the second resource manager that the computing node is active by ignoring the first indication, wherein the conflict is resolved by the computing device, and wherein the computing device is separate from the first and second resource managers.

17. The non-transitory computer-readable storage medium of claim 16 having instructions stored thereon that, upon execution by a computing device, causes the computing device to perform operations further comprising instructing, in response to processing the second signal from the second resource manager, the computing node to consume resources associated with the second operating system.

18. The non-transitory computer-readable storage medium of claim 16 having instructions stored thereon that, upon execution by a computing device, causes the computing device to perform operations further comprising allocating resources associated with the second operating system to the computing node.

19. The non-transitory computer-readable storage medium of claim 16 having instructions stored thereon that, upon execution by a computing device, causes the computing device to perform operations further comprising identifying attributes that should persist to provision the computing node with an operating system different from the second operating system.

20. The non-transitory computer-readable storage medium of claim 16 having instructions stored thereon that, upon execution by a computing device, causes the computing device to perform operations further comprising generating a list of possible versions of a resource.

Continuity (10)
Continuation 15478467 · Apr 4, 2017
Continuation 14833673 · Aug 24, 2015
Continuation 14513589 · Oct 14, 2014
Continuation 12023722 · Jan 31, 2008
Continuation In Part 11276855 · Mar 16, 2006
Continuation In Part 11276853 · Mar 16, 2006
Continuation In Part 11276856 · Mar 16, 2006
Continuation In Part 11276852 · Mar 16, 2006
Continuation In Part 11276854 · Mar 16, 2006
Related Publication 20200004599A1 · Jan 2, 2020