IP Library Granted Patent US 11,582,772
Granted Patent B2
US 11,582,772 · App. 16/882,319 · Granted Feb 14, 2023

Advanced dual band virtual concurrent for WiFi

Inventors: Ying Lu (Eastwood, AU); Richard Kinder (Eastwood, AU)
Assignee: SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC
H04W72/1205H04B7/155H04W48/10H04W84/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,582,772
App. No.
16/882,319
Granted
Feb 14, 2023
Kind
B2
Abstract

Example methods of advanced DBVC for WiFi relate to one or more of avoiding beacon collisions between a repeater and a root AP, optimizing traffic flows based on buffers queued within hardware, optimizing TCP throughput through DPI and prioritization of TCP ACK packets, or optimizing transmissions through a trigger-based mechanism. An example method may include receiving a transmission from a root AP. The method may include obtaining a next root AP TBTT of a next beacon to be sent by the root AP from the transmission. The method may include determining an amount of time to delay a next repeater TBTT of a next beacon to be sent by a repeater to avoid conflict between the next root AP TBTT and the next repeater TBTT. The method may include delaying the next repeater TBTT based on the determined amount of time.

Claims (76)

1. A method comprising:

receiving, by a repeater configured to communicate according to a dual band virtual concurrent (DBVC) protocol, a transmission from a root access point (AP);

obtaining a next root AP target beacon transmission time (TBTT) of a next beacon to be sent by the root AP from the transmission;

determining an amount of time to delay a next repeater TBTT of a next beacon to be sent by the repeater to avoid conflict between the next root AP TBTT and the next repeater TBTT; and

delaying the next repeater TBTT based on the determined amount of time,

wherein determining the amount of time to delay comprises:

determining the next repeater TBTT;

determining a repeater beacon interval of the repeater;

determining a first amount of time for the repeater to perform DBVC off channel operations;

determining a second amount of time that will cause the next repeater TBTT to avoid occurring during DBVC off channel operations of the repeater;

summing the next root AP TBTT with the repeater beacon interval to generate an intermediate sum; and

subtracting from the intermediate sum the first amount of time, the second amount of time, and the next repeater TBTT to generate a difference, the difference being the amount of time to delay.

2. The method of claim 1 , further comprising setting the repeater beacon interval equal to a root AP beacon interval of the root AP such that repeater TBTTs that follow the next repeater TBTT are out of phase with root AP TBTTs that follow the next root AP TBTT.

3. The method of claim 1 , further comprising setting the repeater beacon interval to a different value than a root AP beacon interval of the root AP such that at least some repeater TBTTs that follow the next repeater TBTT are out of phase with root AP TBTTs that follow the next root AP TBTT.

4. The method of claim 1 , wherein delaying the next repeater TBTT based on the determined amount of time comprises delaying the next repeater TBTT by the determined amount of time.

5. The method of claim 1 , wherein delaying the next repeater TBTT based on the determined amount of time comprises delaying the next repeater TBTT by a portion of the determined amount of time, the method further comprising delaying each of a plurality of subsequent repeater TBTTs that follow the next repeater TBTT by a portion of the determined amount of time, wherein a sum of the portions of the determined amount of time equals the determined amount of time.

6. A method comprising:

determining a load on an upstream buffer within a repeater that is configured to communicate according to a dual band virtual concurrent (DBVC) protocol, wherein the load on the upstream buffer corresponds to data to be transmitted within an upstream network;

determining a load on a downstream buffer within the repeater that corresponds to data to be transmitted within a downstream network;

determining whether to adjust a DBVC duty cycle of the repeater based on the load on the upstream buffer and the load on the downstream buffer, wherein the DBVC duty cycle includes at least one of:

an on channel duty cycle comprising a ratio of time spent on an on channel to total time spent on both the on channel and an off channel; and

an off channel duty cycle comprising a ratio of time spent on the off channel to total time spent on both the on channel and the off channel; and

adjusting the DBVC duty cycle of the repeater.

7. The method of claim 6 , wherein the load on the downstream buffer comprises data to be sent by the repeater to one or more client devices within the downstream network.

8. The method of claim 6 , wherein:

determining the load on the upstream buffer comprises identifying a priority of the data within the upstream buffer based on a type of the data within the upstream buffer and calculating the load on the upstream buffer based on the identified priority of the data within the upstream buffer, a given amount of data with higher priority contributing more to the determined load than a same amount of data with lower priority; and

determining the load on the downstream buffer comprises identifying a priority of the data within the downstream buffer based on a type of the data within the downstream buffer and calculating the load on the downstream buffer based on the identified priority of the data within the downstream buffer, a given amount of data with higher priority contributing more to the determined load than a same amount of data with lower priority.

9. The method of claim 8 , wherein the priority of the data within the upstream buffer and the priority of the data within the downstream buffer is determined based on access categories associated with the data.

10. The method of claim 6 , wherein determining whether to adjust the DBVC duty cycle of the repeater based on the load on the upstream buffer and the load on the downstream buffer comprises:

determining a ratio of the load on the upstream buffer to the load on the downstream buffer; and

one of:

determining to not adjust the DBVC duty cycle of the repeater if the ratio of the load on the upstream buffer to the load on the downstream buffer is within a predetermined range; or

determining to adjust the DBVC duty cycle of the repeater if the ratio of the load on the upstream buffer to the load on the downstream buffer is outside the predetermined range.

11. The method of claim 6 , wherein:

determining the load on the upstream buffer comprises calculating a buffer size of the upstream buffer based on access category factors associated with the data and a number of packets within the load on the upstream buffer; and

determining the load on the downstream buffer comprises calculating a buffer size of the downstream buffer based on access category factors associated with the data and a number of packets within the load on the downstream buffer.

12. The method of claim 6 , wherein adjusting the DBVC duty cycle of the repeater comprises adjusting at least one of:

a number of times per target beacon transmission time (TBTT) to switch between communication within the downstream network and the upstream network; or

an off channel dwell time of the repeater.

13. A method comprising:

determining traffic is to be transmitted by a first wireless communication device to a second wireless communication device configured to communicate according to a dual band virtual concurrent (DBVC) protocol during a period of time that the second wireless communication device is not to perform operations on a first channel;

switching to a second channel;

providing a trigger frame to the second wireless communication device over the second channel;

receiving an acknowledge (ACK) frame from the second wireless communication device, the ACK frame being sent by the second wireless communication device to the first wireless communication device in response to the second wireless communication device receiving the trigger frame;

transmitting data to the second wireless communication device over the second channel;

transmitting an end frame to the second wireless communication device over the second channel; and

switching to the first channel in response to transmitting the end frame.

14. The method of claim 13 further comprising:

receiving a second trigger frame from the second wireless communication device over the first channel according to the DBVC protocol during a period of time that the first wireless communication device is not to perform operations on the second channel;

receiving data from the second wireless communication device over the first channel; and

receiving a second end frame from the second wireless communication device, wherein the second end frame indicates that the second wireless communication device is to switch to the second channel.

15. The method of claim 13 , further comprising receiving a second ACK frame from the second wireless communication device in response to the end frame.

16. The method of claim 13 , further comprising:

providing one or more other trigger frames to the second wireless communication device over the second channel prior to providing the trigger frame; and

determining that an ACK frame has not been received from the second wireless communication device for the one or more other trigger frames,

wherein the first wireless communication device provides the trigger frame to the second wireless communication device in response determining that an ACK frame has not been received from the second wireless communication device for the one or more other trigger frames.

17. The method of claim 13 , further comprising:

switching to the second channel;

providing a plurality of trigger frames to the second wireless communication device over the second channel;

determining that an ACK frame has not been received from the second wireless communication device for any of the plurality of trigger frames;

switching back to the first channel; and

communicating with the second wireless communication device over the first channel.

18. The method of claim 13 , wherein the first wireless communication device comprises a root AP and the second wireless communication device comprises a repeater configured to communicate with the root AP within an upstream network and with a client device within a downstream network according to the DBVC protocol.

19. A method comprising:

performing deep packet inspection (DPI) to observe, at a repeater that is configured to communicate according to a dual band virtual concurrent (DBVC) protocol, transmission control protocol (TCP) connections through the repeater and TCP window sizes of the TCP connections; and

setting or adjusting an on/off channel dwell time of the repeater based on the TCP window sizes of the TCP connections.

20. The method of claim 19 , further comprising determining an average TCP window size of the TCP window sizes of the TCP connections, wherein setting or adjusting the on/off channel dwell time of the repeater based on the TCP window sizes comprises setting or adjusting the on/off channel dwell time of the repeater based on the average TCP window size.

21. The method of claim 20 , wherein setting or adjusting the on/off channel dwell time of the repeater based on the average TCP window size comprises:

setting or adjusting the on/off channel dwell time of the repeater to relatively longer on/off channel dwell times in response to the average TCP window size being relatively larger;

setting or adjusting the on/off channel dwell time of the repeater to relatively shorter on/off channel dwell times in response to the average TCP window size being relatively smaller; or

setting or adjusting the on/off channel dwell time of the repeater to relatively shorter on/off channel dwell times in response to the average TCP window size being relatively larger to throttle TCP streams.

22. The method of claim 19 , further comprising:

performing DPI to inspect upstream and downstream packets that contain TCP acknowledge (ACK) packets; and

reducing overhead by coalescing TCP ACK packets.

23. The method of claim 22 , wherein reducing overhead by coalescing TCP ACK packets comprises compressing multiple TCP ACK packets into a single TCP ACK packet.

24. The method of claim 23 , further comprising sending the single TCP ACK packet compressed from multiple TCP ACK packets as a last transmission prior to switching from an off channel to an on channel or from the on channel to the off channel.

Assignments (5)
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL 053613, FRAME 0621 Recorded Aug 17, 2023
From: DEUTSCHE BANK AG NEW YORK BRANCH, AS COLLATERAL AGENT
To: SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC; FAIRCHILD SEMICONDUCTOR CORPORATION
Reel/Frame 064618/0942 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 8, 2023
From: SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC
To: MAXLINEAR, INC.
Reel/Frame 063572/0701 →
RELEASE OF SECURITY INTEREST Recorded May 2, 2023
From: DEUTSCHE BANK AG NEW YORK BRANCH
To: SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC
Reel/Frame 063516/0756 →
SECURITY INTEREST Recorded Aug 27, 2020
From: FAIRCHILD SEMICONDUCTOR CORPORATION; SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC
To: DEUTSCHE BANK AG NEW YORK BRANCH, AS COLLATERAL AGENT
Reel/Frame 053613/0621 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2020
From: LU, YING; KINDER, RICHARD
To: SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC
Reel/Frame 052738/0689 →
Continuity (3)
Provisional Application 62969229 · Feb 3, 2020
Provisional Application 62890970 · Aug 23, 2019
Related Publication 20210058943A1 · Feb 25, 2021
Cited By (1)
US 12,659,945