IP Library Granted Patent US 11,790,124
Granted Patent B2
US 11,790,124 · App. 17/140,493 · Granted Oct 17, 2023

Systems and methods for coordinating initiation, preparing, vetting, scheduling, constructing, and implementing a power plant implementation

Inventor: Lee Priest (Charlotte, NC)
Assignee: ETAK Systems, LLC
G06F30/13B64C39/024G06Q10/06313G06Q50/06G06Q50/32G06T17/05B64U2101/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,790,124
App. No.
17/140,493
Granted
Oct 17, 2023
Kind
B2
Abstract

A method for preparing and vetting a power plant for implementation at a telecommunications site is disclosed. The method includes assessing the power plant and a location for the power plant at the telecommunications site. The method also includes obtaining data from the location utilizing one or more data capture techniques, the one or more data capture techniques including capturing one or more of photos and videos of existing infrastructure at the telecommunications site. The method further includes generating one of a 360 degree view and a model of the existing infrastructure. The method also includes identifying installation obstacles and flaws utilizing the model including the conditions of the existing infrastructure selected to receive and interface with the power plant. The method further includes re-designing the power plant installation based on the obstacles and flaws identified. The method also includes developing a project plan for the power plant installation.

Claims (33)

1. A method for preparing and vetting a power plant for implementation at a telecommunications site, the method comprising:

assessing the power plant and a location for the power plant at the telecommunications site for compliance with customer requirements prior to initiating installation planning;

obtaining data from the location utilizing one or more data capture techniques, the one or more data capture techniques including capturing one or more of photos and videos of existing infrastructure at the telecommunications site selected to receive and interface with the power plant, the obtaining data being via one or more of an Unmanned Aerial Vehicle (UAV), a satellite, a camera apparatus, and a telescoping apparatus;

generating one of a 360 degree view and a model of the existing infrastructure selected to receive and interface with the power plant;

identifying installation obstacles and flaws utilizing the model including the conditions of the existing infrastructure selected to receive and interface with the power plant;

re-designing the power plant installation based on the obstacles and flaws identified; and

developing a project plan for the power plant installation.

2. The method of claim 1 , wherein the location for the power plant is in a shelter or cabinet housing or supporting telecommunications equipment.

3. The method of claim 1 , wherein the power plant is modeled based on the construction plans and inserted into the generated one of the 360 degree view and the model.

4. The method of claim 3 , wherein re-designing the power plant installation plan utilizes the model of the power plant inserted into the one of the 360 degree view to reconfigure the power plant.

5. The method of claim 1 , wherein identifying obstacles and flaws includes identifying missing installation materials or items based on the one or more of the 360 degree view and the model and identifying parties responsible for those materials or items, and the method further comprising providing data necessary to remedy the missing materials or items to the parties identified.

6. The method of claim 5 , wherein the data provided to the parties identified includes the model of the telecommunications site, and wherein the method further comprises:

Utilizing one or more location identifiers associated with the one or more of photos and videos to process the one or more of photos and videos to define a digital model of the telecommunications site.

7. The method of claim 1 , wherein the installation location is selected from one of a plurality of locations and the plurality of locations are assessed by capturing data including one or more of photos and videos of each of the plurality of locations and vetting the plurality of locations to select the location based on models generated of the plurality of locations.

8. The method of claim 1 , wherein developing the project plan for the power plant installation is at least partially based on the model.

9. The method of claim 1 , further comprising identifying installation tasks, division thereof, reconfiguring the power plant based thereon, and validating the power plant with the reconfigurations by reconfiguring the model therewith.

10. The method of claim 9 , wherein installation documents, at least some of the data captured, and the model are provided to sub-contractors identified for performing the installation tasks.

11. The method of claim 10 , wherein identifying the installation tasks includes requesting feedback from the sub-contractors, revising the model based on the feedback, and revising the installation documents based on the model revised based on the feedback.

12. A non-transitory computer-readable storage medium having computer readable code stored thereon for programming a computer for a power plant installation via steps comprising:

subsequent to assessing the power plant and a location for the power plant at the telecommunications site for compliance with customer requirements prior to initiating installation planning;

obtaining data from the location captured utilizing one or more data capture techniques, the one or more data capture techniques including capturing one or more of photos and videos of existing infrastructure at the telecommunications site selected to receive and interface with the power plant, the obtaining data being via one or more of an Unmanned Aerial Vehicle (UAV), a satellite, a camera apparatus, and a telescoping apparatus;

generating one of a 360 degree view and a model of the existing infrastructure selected to receive and interface with the power plant;

identifying installation obstacles and flaws utilizing the model including the conditions of the existing infrastructure selected to receive and interface with the power plant;

re-designing the power plant installation based on the obstacles and flaws identified; and

developing a project plan for the power plant installation.

13. The non-transitory computer-readable storage medium of claim 12 , wherein the location for the power plant is in a shelter or cabinet housing or supporting telecommunications equipment.

14. The non-transitory computer-readable storage medium of claim 12 , wherein the power plant is modeled based on the construction plans and inserted into the generated one of the 360 degree view and the model.

15. The non-transitory computer-readable storage medium of claim 14 , wherein re-designing the power plant installation plan utilizes the model of the power plant to reconfigure the power plant.

16. The non-transitory computer-readable storage medium of claim 12 , wherein identifying obstacles and flaws includes identifying missing installation materials or items based on the one or more of the 360 degree view and the model and identifying parties responsible for those materials or items, and the method further comprising providing data necessary to remedy the missing materials or items to the parties identified.

17. The non-transitory computer-readable storage medium of claim 16 , wherein the data provided to the parties identified includes the model of the telecommunications site, and wherein the steps further comprise:

Utilizing one or more location identifiers associated with the one or more of photos and videos to process the one or more of photos and videos to define a digital model of the telecommunications site.

18. The non-transitory computer-readable storage medium of claim 12 , wherein the installation location is selected from one of a plurality of locations and the plurality of locations are assessed by capturing data including one or more of photos and videos of each of the plurality of locations and vetting the plurality of locations to select the location based on models generated of the plurality of locations.

19. The non-transitory computer-readable storage medium of claim 12 , wherein developing the project plan for the power plant installation is at least partially based on the model.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Mar 24, 2026
From: KEYBANK NATIONAL ASSOCIATION, AS AGENT
To: ETAK SYSTEMS, LLC
Reel/Frame 074818/0664 →
PATENT SECURITY AGREEMENT Recorded Mar 20, 2026
From: ETAK SYSTEMS, LLC
To: AQUARIAN CREDIT FUNDING LLC, AS ADMINISTRATIVE AGENT AND COLLATERAL AGENT
Reel/Frame 075246/0859 →
PATENT SECURITY AGREEMENT Recorded Apr 22, 2021
From: ETAK SYSTEMS, LLC
To: KEYBANK NATIONAL ASSOCIATION
Reel/Frame 056003/0641 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 4, 2021
From: PRIEST, LEE
To: ETAK SYSTEMS, LLC
Reel/Frame 054799/0494 →
Continuity (18)
Continuation In Part 16881623 · May 22, 2020
Continuation In Part 16881565 · May 22, 2020
Continuation In Part 16881510 · May 22, 2020
Continuation In Part 16861537 · Apr 29, 2020
Continuation In Part 16750301 · Jan 23, 2020
Continuation In Part 15968131 · May 1, 2018
Continuation In Part 15926533 · Mar 20, 2018
Continuation In Part 15898695 · Feb 19, 2018
Continuation In Part 15235686 · Aug 12, 2016
Continuation In Part 15877555 · Jan 23, 2018
Continuation In Part 15815786 · Nov 17, 2017
Continuation In Part 15675930 · Aug 14, 2017
Continuation In Part 15283699 · Oct 3, 2016
Continuation In Part 15241239 · Aug 19, 2016
Continuation In Part 15168503 · May 31, 2016
Continuation In Part 15160890 · May 20, 2016
Continuation In Part 14685720 · Apr 14, 2015
Related Publication 20210150097A1 · May 20, 2021