IP Library › Granted Patent US 12,410,700
Granted Patent B2
US 12,410,700 · App. 17/808,527 · Granted Sep 9, 2025

Method of drilling a wellbore to a target

Inventors: Stefan Maus (Boulder, CO); Marc Ernest Willerth (San Luis Obispo, CA); Jarrod Shawn Deverse (Greenwood Village, CO)
Assignee: Magnetic Variation Services, LLC
E21B47/022E21B7/04E21B44/00E21B47/024E21B47/04G01V3/38E21B2200/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,410,700
App. No.
17/808,527
Granted
Sep 9, 2025
Kind
B2
Abstract

A method of drilling a wellbore to a target includes measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool. An actual change in wellbore position over a survey leg linking the two survey stations is determined. Corrections are applied to the measured attitude at one or both of the survey stations such that a modeled well path joining the survey stations reflects the determined actual change in wellbore positon between the two survey stations.

Claims (52)

1. A method of drilling a wellbore to a target, comprising:

receiving, from a computer system, attitudes at a first survey station and a second survey station along a wellbore path using a downhole surveying tool, wherein the first survey station and the second survey station are consecutive;

modeling, by the computer system, based on a first attitude of the wellbore at the first survey station, a first interval between the first survey station and the second survey station as a first modeled well path;

determining, by the computer system, based on the first modeled well path, a first positional vector of the wellbore at the first survey station;

modeling, by the computer system, based on a second attitude of the wellbore at the second survey station, a second interval between the second survey station and an estimated position of a third survey station as a second modeled well path;

determining, by the computer system, based on the second modeled well path, a second positional vector of the wellbore at the second survey station;

estimating, by the computer system, a position of the third survey station based on the first modeled well path, second modeled well path, first positional vector, and the second positional vector, wherein the third survey station is beyond the second survey station along the wellbore path; and

drilling in accordance with the estimated position of the third survey station.

2. The method of claim 1 , wherein estimating the position of the third survey station comprises determining a third attitude of the wellbore at the third survey station.

3. The method of claim 2 , wherein determining the third attitude of the wellbore at the third survey station comprises setting the third attitude to be the same as the second attitude of the wellbore at the second survey station.

4. The method of claim 1 , the method further comprising:

applying corrections to the second attitude of the wellbore at the second survey station based on drilling in accordance with the estimated position of the third survey station.

5. The method of claim 1 , wherein estimating the position of the third survey station further comprises using supplemental information outside of stationary survey data.

6. The method of claim 1 , the method further comprising:

after estimating the position of the third survey station, applying a minimum curvature solution to the first interval and the second interval such that the first modeled well path and the second modeled well path intersect at the second survey station.

7. The method of claim 1 , wherein a first measured depth of the first survey station is less than a second measured depth of the second survey station, and the second measured depth is less than a third measured depth of the third survey station.

8. The method of claim 1 , wherein the third survey station is one of a notional survey station, an actual survey station, or a planned survey station according to a planned wellbore path.

9. The method of claim 1 , wherein the second positional vector of the wellbore at the second survey station is determined using a continuous survey method.

10. The method of claim 1 , wherein the second positional vector of the wellbore at the second survey station is determined using a slide sheet method.

11. A non-transitory computer-readable medium comprising processor-executable instructions configured to cause one or more processors to:

receive attitudes at a first survey station and a second survey station along a wellbore path using a downhole surveying tool, wherein the first survey station and the second survey station are consecutive;

model, based on a first attitude of the wellbore at the first survey station, a first interval between the first survey station and the second survey station as a first modeled well path;

determine, based on the first modeled well path, a first positional vector of the wellbore at the first survey station;

model, based on a second attitude of the wellbore at the second survey station, a second interval between the second survey station and an estimated position of a third survey station as a second modeled well path;

determine, based on the second modeled well path, a second positional vector of the wellbore at the second survey station;

estimate, a position of the third survey station based on the first modeled well path, second modeled well path, first positional vector, and the second positional vector, wherein the third survey station is beyond the second survey station along the wellbore path; and

control one or more components of a drilling rig to drill in accordance with the estimated position of the third survey station.

12. The non-transitory computer-readable medium of claim 11 , wherein the second positional vector of the wellbore at

the second survey station is determined using a continuous survey method.

13. The non-transitory computer-readable medium of claim 11 , wherein the one or more processors are configured to execute further processor-executable instructions stored in the non-transitory computer-readable medium to:

determine a third attitude of the wellbore at the third survey station.

14. The non-transitory computer-readable medium of claim 13 , wherein the one or more processors are configured to execute further processor-executable instructions stored in the non-transitory computer-readable medium to:

set the third attitude to be the same as the second attitude of the wellbore at the second survey station.

15. The non-transitory computer-readable medium of claim 11 , wherein

the third survey station is one of a notional survey station, an actual survey station, or a planned survey station according to a planned wellbore path.

16. The non-transitory computer-readable medium of claim 11 , wherein the one or more processors are configured to execute further processor-executable instructions stored in the non-transitory computer-readable medium to:

apply corrections to the second attitude of the wellbore at the second survey station based on drilling in accordance with the estimated position of the third survey station.

17. The non-transitory computer-readable medium of claim 11 , wherein instructions to estimate the position of the third survey station further cause the one or more processors to execute further processor-executable instructions stored in the non-transitory computer-readable medium to:

receive supplemental information outside of stationary survey data; and

estimate the position of the third survey station based on the supplemental information.

18. The non-transitory computer-readable medium of claim 11 , wherein the one or more processors are configured to execute further processor-executable instructions stored in the non-transitory computer-readable medium to:

after estimating the position of the third survey station, apply a minimum curvature solution to the first interval and the second interval such that the first modeled well path and the second modeled well path intersect at the second survey station.

19. The non-transitory computer-readable medium of claim 11 , wherein a first measured depth of the first survey station is less than a second measured depth of the second survey station, and the second measured depth is less than a third measured depth of the third survey station.

20. A method of drilling a wellbore to a target, comprising:

measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool;

determining an actual change in wellbore position over a survey leg by linking the two adjacent survey stations with a first modeled well path; and

interpolating a notional survey station between the two adjacent survey stations, the interpolating comprising computing an attitude of the notional survey station such that a second modeled well path intersects the first modeled well path and the notional survey station, the notional survey station reflecting the determined actual change in wellbore position over the survey leg; and

drilling in accordance with the notional survey station interpolated between the two adjacent survey stations.

21. The method of claim 20 , wherein determining the actual change in wellbore position comprises determining the actual change using continuous survey measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

22. The method of claim 20 , wherein determining the actual change in wellbore position comprises determining the actual change using continuous inclination measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

23. The method of claim 20 , wherein determining the actual change in wellbore position comprises determining the actual change using depths and toolface directions defining slide intervals during drilling of the wellbore.

24. The method of claim 20 , wherein the first modeled well path and the second modeled well path are circular arcs computed by a minimum curvature method.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2024
From: MAUS, STEFAN; WILLERTH, MARC ERNEST; DEVERSE, JARROD SHAWN
To: MAGNETIC VARIATION SERVICES, LLC
Reel/Frame 068378/0914 →
Continuity (4)
Continuation 16097788
Provisional Application 62408622 · Oct 14, 2016
Provisional Application 62335078 · May 12, 2016
Related Publication 20220325616A1 · Oct 13, 2022
References Cited (32)
US 6405808B1 · Edwards et al. · 2002 [cited by applicant]
US 7957946B2 · Pirovolou · 2011 [cited by applicant]
US 8561720B2 · Edbury et al. · 2013 [cited by applicant]
US 11421525B2 · Maus et al. · 2022 [cited by applicant]
US 11473420B2 · Maus et al. · 2022 [cited by applicant]
US 20020060570A1 · Shirasaka et al. · 2002 [cited by applicant]
US 20090120690A1 · Phillips · 2009 [cited by examiner]
US 20120330551A1 · Mitchell et al. · 2012 [cited by applicant]
US 20150240622A1 · Bang et al. · 2015 [cited by applicant]
US 20150247397A1 · Samuel · 2015 [cited by examiner]
US 20150377004A1 · Hornblower · 2015 [cited by examiner]
US 20160032709A1 · Ledroz et al. · 2016 [cited by applicant]
US 20190169979A1 · Nguyen · 2019 [cited by examiner]
U.S. Appl. No. 16/097,788, “Advisory Action”, Jan. 25, 2022, 5 pages. [cited by applicant]
U.S. Appl. No. 16/097,788, “Final Office Action”, Oct. 27, 2021, 23 pages. [cited by applicant]
U.S. Appl. No. 16/097,788, “Non-Final Office Action”, Jun. 8, 2021, 20 pages. [cited by applicant]
U.S. Appl. No. 16/097,788, “Notice of Allowance”, Mar. 24, 2022, 14 pages. [cited by applicant]
U.S. Appl. No. 16/192,135, “Corrected Notice of Allowability”, May 4, 2022, 2 pages. [cited by applicant]
U.S. Appl. No. 16/192,135, “Non-Final Office Action”, Oct. 28, 2021, 16 pages. [cited by applicant]
U.S. Appl. No. 16/192,135, “Notice of Allowance”, Apr. 11, 2022, 10 pages. [cited by applicant]
Australian Patent Application No. 2017263539, “First Examination Report”, Feb. 22, 2022, 3 pages. [cited by applicant]
Colombian Patent Application No. NC2018/0012148, “Office Action”, Dec. 14, 2020, 20 pages. [cited by applicant]
European Patent Application No. 17796894.8, “Extended European Search Report”, Jan. 27, 2020, 8 pages. [cited by applicant]
PCT/US2017/032295, “International Preliminary Report on Patentability”, Nov. 22, 2018, 9 pages. [cited by applicant]
PCT/US2017/032295, “International Search Report and Written Opinion”, Aug. 16, 2017, 9 pages. [cited by applicant]
AU2017263539, “Notice of Acceptance”, Nov. 21, 2022, 3 pages. [cited by applicant]
AU2017263539, “Second Examination Report”, Sep. 5, 2022, 2 pages. [cited by applicant]
CA3,022,843, “Office Action”, Jun. 12, 2024, 6 pages. [cited by applicant]
U.S. Appl. No. 16/097,788, “Notice of Allowance”, Jul. 27, 2022, 8 pages. [cited by applicant]
Mexican Patent Application No. MX/A/2018/013666, “Office Action”, Aug. 30, 2022, 4 pages. [cited by applicant]
CA3022843, “Office Action”, Aug. 9, 2023, 6 pages. [cited by applicant]
EP17796894.8, “Intention to Grant”, Oct. 4, 2024, 7 pages. [cited by applicant]