IP Library › Granted Patent US 11,473,420
Granted Patent B2
US 11,473,420 · App. 16/097,788 · Granted Oct 18, 2022

Method of drilling a wellbore to a target

Inventors: Stefan Maus (Boulder, CO); Marc Ernest Willerth (San Luis Obispo, CA); Jarrod Shawn Deverse (Greenwood Village, CO)
Assignee: MAGNETIC VARIATION SERVICES, LLC
E21B47/022E21B7/04E21B44/00E21B47/024E21B47/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,473,420
App. No.
16/097,788
Granted
Oct 18, 2022
Kind
B2
Abstract

A method of drilling a wellbore to a target includes measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool. An actual change in wellbore position over a survey leg linking the two survey stations is determined. Corrections are applied to the measured attitude at one or both of the survey stations such that a modeled well path joining the survey stations reflects the determined actual change in wellbore positon between the two survey stations.

Claims (53)

1. A method of drilling a wellbore to a target, comprising:

measuring attitudes at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;

determining an actual change in wellbore position between the first and third survey stations; and

applying corrections to the attitude at the second survey station such that two modeled well paths intersect at a corrected position of the second survey station to reflect the determined actual change in wellbore position between the first and third survey stations, wherein:

the corrected position of the second survey station is interpolated between the first survey station and the third survey station;

the first survey station and the second survey station are linked with a first modeled well path of the two modeled well paths;

the second survey station and the third survey station are linked with a second modeled well path of the two modeled well paths; and

the two modeled well paths are circular arcs computed by a minimum curvature method.

2. The method of claim 1 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous survey measurements taken during drilling of the wellbore.

3. The method of claim 1 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous inclination measurements taken during drilling of the wellbore.

4. The method of claim 1 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

5. The method of claim 1 , wherein the third survey station is a notional survey station determined by projecting the path of the wellbore ahead of the second survey station.

6. The method of claim 5 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using survey data other than stationary survey measurements taken at the survey stations.

7. The method of claim 5 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

8. A non-transitory computer-readable medium having instructions stored thereon that, when executed by one or more processors cause the one or more processors to at least:

receive attitudes measured at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;

determine an actual change in wellbore position between the first and third survey stations; and

apply corrections to the attitude at the second survey station such that two modeled well paths to intersect at a corrected position of the second survey station to reflect the determined actual change in wellbore position between the first and third survey stations, wherein:

the corrected position of the second survey station is interpolated between the first survey station and the third survey station;

the first survey station and the second survey station are linked with a first modeled well path of the two modeled well paths;

the second survey station and the third survey station are linked with a second modeled well path of the two modeled well paths; and

the two modeled well paths are circular arcs computed by a minimum curvature method.

9. The non-transitory computer-readable medium of claim 8 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous survey measurements taken during drilling of the wellbore.

10. The non-transitory computer-readable medium of claim 8 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous inclination measurements taken during drilling of the wellbore.

11. The non-transitory computer-readable medium of claim 8 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

12. The non-transitory computer-readable medium of claim 8 , wherein the third survey station is a notional survey station determined by projecting the path of the wellbore ahead of the second survey station.

13. The non-transitory computer-readable medium of claim 12 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using survey data other than stationary survey measurements taken at the survey stations.

14. The non-transitory computer-readable medium of claim 12 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

15. A method of drilling a wellbore to a target, comprising:

measuring attitudes at adjacent survey stations along a wellbore using a downhole surveying tool;

determining an interpolated wellbore position between the adjacent survey stations; and

using the interpolated wellbore position, applying a correction to the attitude measured at one of the adjacent survey stations such that a modeled well path formed by a minimum curvature method joins the one of the adjacent survey stations to the interpolated well position between the adjacent survey stations.

16. The method of claim 15 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the adjacent survey stations using continuous survey measurements taken during drilling of the wellbore.

17. The method of claim 15 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the adjacent survey stations using continuous inclination measurements taken during drilling of the wellbore.

18. The method of claim 15 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between a first survey station and a third survey station of the adjacent survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

19. A method of drilling a wellbore to a target, comprising:

measuring attitudes at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;

determining an actual change in wellbore position between the first and third survey stations; and

applying corrections to the attitude at the second survey station such that two modeled well paths linking the three consecutive survey stations reflect the determined actual change in wellbore position between the first and third survey stations, wherein:

the two modeled well paths linking the three stations are circular arcs computed by a minimum curvature method; and

the third survey station is a notional survey station determined by the two modeled well paths.

20. The method of claim 19 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using survey data other than stationary survey measurements taken at the survey stations.

21. The method of claim 19 , wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

22. A non-transitory computer-readable medium having instructions stored thereon that, when executed by one or more processors cause the one or more processors to at least:

receive attitudes measured at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;

determine an actual change in wellbore position between the first and third survey stations; and

apply corrections to the attitude at the second survey station such that two modeled well paths linking the three consecutive survey stations reflect the determined actual change in wellbore position between the first and third survey stations, wherein:

the two modeled well paths linking the three stations are circular arcs computed by a minimum curvature method; and

the third survey station is a notional survey station determined by the two modeled well paths.

23. The non-transitory computer-readable medium of claim 22 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using survey data other than stationary survey measurements taken at the survey stations.

24. The non-transitory computer-readable medium of claim 22 , wherein the instructions to cause the one or more processors to determine the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

25. The method of claim 1 , wherein the first modeled well path is tangent to a tangent line defined by a survey vector at the first survey station.

26. The non-transitory computer-readable medium of claim 8 , wherein the first modeled well path is tangent to a tangent line defined by a survey vector at the first survey station.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 2, 2022
From: MAUS, STEFAN; WILLERTH, MARC E.; DEVERSE, SHAWN
To: MAGNETIC VARIATION SERVICES, LLC
Reel/Frame 059784/0834 →
Continuity (3)
Provisional Application 62408622 · Oct 14, 2016
Provisional Application 62335078 · May 12, 2016
Related Publication 20190169977A1 · Jun 6, 2019
Cited By (2)
US 12,392,235 US 12,410,700