IP Library › Granted Patent US 12,605,900
Granted Patent B2
US 12,605,900 · App. 17/916,026 · Granted Apr 21, 2026

Extraction system for apparatus for the layer-by-layer formation of three-dimensional objects, and associated methods and controller

Inventors: Marcel Garrido Barrabes (London, GB); Anders Hartmann (London, GB)
Assignee: Stratasys Powder Production Ltd.
B29C64/364B08B15/00B29C64/135B29C64/393B33Y40/00B22F3/105B22F10/10B22F10/322B22F10/368B22F12/00B22F12/70B22F12/90B29C64/00B33Y30/00B33Y50/00B33Y50/02B33Y70/00B33Y80/00Y02P10/00Y02P10/25
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,605,900
App. No.
17/916,026
Granted
Apr 21, 2026
Kind
B2
Abstract

An apparatus for the layer-by-layer formation of three-dimensional objects, the apparatus comprising a gas extraction system and an enclosed working space from which gas is to be extracted, wherein the working space is enclosed by side walls, a ceiling and a working surface, and comprises a working space inlet for allowing gas to enter into the working space, a working space outlet for allowing gas to exit the working space, and a build bed surface in which a layer of the object is formed; wherein the gas extraction system comprises: a primary conduit comprising at least a first primary inlet, at least a first interfacing inlet, and a primary outlet; and at least a first secondary conduit comprising a respective first secondary inlet and a respective first secondary outlet, the first secondary inlet being in fluidic communication with the working space for extracting gas from the working space, and the first secondary outlet being in fluidic communication with the first interfacing inlet; wherein the or each primary inlet is open to an environment external to the working space, and wherein the primary outlet is connectable to an external extraction source so as to suction gas from the primary conduit; and wherein the gas extraction system further comprises one or more flow control devices for controlling the flow of gas from the working space into the first secondary conduit, and thence into the primary outlet of the primary conduit. Methods for operating the apparatus, and a controller for controlling the apparatus and carrying out the methods, are also provided.

Claims (16)

1 . A method for extracting gas from the working space of an apparatus for layer-by-layer formation of three-dimensional objects, wherein the working space comprises a ceiling and a floor and wherein the floor comprises a build bed surface, the method comprising:

(a) extracting gas from the working space via a first secondary conduit comprising a first secondary inlet and a first secondary outlet, and a second secondary conduit comprising a second secondary inlet and a second secondary outlet, wherein the first and second secondary inlets are arranged in the ceiling above and to either side of the build bed surface, the first and second secondary inlets each spanning the width of the build bed surface and receiving gas from the working space;

(b) moving the gas from the first and second secondary conduits either (i) directly into a primary conduit via the first and second secondary outlets to a first interfacing inlet and a second interfacing inlet of the primary conduit or (ii) indirectly into the primary conduit by flowing gas from the second secondary conduit into the first secondary conduit at an intermediate section of the first secondary conduit so that a combined flow of gas from the first and second secondary conduits flows from the intermediate section of the first secondary conduit into the primary conduit, wherein gas from the working space is only received by the primary conduit from the first and second secondary conduits;

(c) extracting the gas from a primary outlet of the primary conduit by operating an external extraction source connected to the primary outlet;

(d) suctioning, by operating the external extraction source, a flow of gas from an environment external to the working space into the primary conduit via a primary inlet of the primary conduit that is open to the environment external to the working space, such that the gas extracted from the primary conduit in step (c) is a mixture of gas extracted from the working space via the first and second interfacing inlets, or via the first interfacing inlet and gas suctioned from the external environment to the working space via the primary inlet; and

(e) operating a first internal flow control device located in the first secondary conduit and a second internal flow control device located in the second secondary conduit, or an internal flow control device located in the intermediate section, to control the flow of gas through the first secondary conduit and/or the second secondary conduit, and

(f) determining one of a temperature, a flow speed or a flow direction of the gas flow at the primary inlet; and

(g) generating, based on determining that, for a predetermined duration, at least one of: the detected temperature is above a normal operating range, the detected flow speed is below a normal operating range, or the detected flow direction is out of the primary conduit, a failure signal to indicate insufficient extraction at (d) for normal operation of the apparatus.

2 . The method of claim 1 , wherein the internal flow control device(s) is/are fan(s), wherein (e) comprises determining that the detected temperature is above a normal operating range and indicates a backflow of gas exiting the primary inlet from the primary conduit, and wherein (g) further comprises terminating a build operation of the apparatus.

3 . The method of claim 1 , further comprising:

detecting a temperature or flow speed of the gas flow at the primary outlet;

determining that the temperature or flow speed at the primary outlet is outside a normal operating range for a predetermined duration; and

generating a failure signal to indicate a departure from normal operation of the apparatus.

4 . The method of claim 1 , wherein the internal flow control device(s) is/are fan(s), and wherein (e) comprises operating the fan(s) to control the flow of gas through the first and second secondary conduits.

5 . The method of claim 1 , wherein the primary inlet comprises a first primary inlet and a second primary inlet open to the environment external to the working space, and (d) comprises suctioning the flow of gas from an environment external to the working space into the primary conduit via the first and second primary inlets, such that the gas extracted from the primary conduit in step (c) is a mixture of gas extracted from the working space via the first interfacing inlet and gas suctioned from the external environment to the working space via the primary inlet; and

wherein a property of the gas flow is detected at the first primary inlet and/or the second primary inlet.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 29, 2022
From: GARRIDO BARRABES, MARCEL; HARTMANN, ANDERS
To: STRATASYS POWDER PRODUCTION LTD.
Reel/Frame 061262/0667 →
Priority Claims (1)
GB 2004906 · Apr 2, 2020 · national
Continuity (1)
Related Publication 20230142837A1 · May 11, 2023
References Cited (30)
US 5626820A · Kinkead · 1997 [cited by examiner]
US 5711705A · Krainiak et al. · 1998 [cited by applicant]
US 11292063B2 · Shaw · 2022 [cited by examiner]
US 11760024B2 · Schödel · 2023 [cited by examiner]
US 20040003741A1 · Iskra · 2004 [cited by examiner]
US 20040004303A1 · Iskra · 2004 [cited by examiner]
US 20040005182A1 · Gaylo · 2004 [cited by examiner]
US 20040012112A1 · Davidson · 2004 [cited by examiner]
US 20040084814A1 · Boyd · 2004 [cited by examiner]
US 20070021050A1 · Kennedy · 2007 [cited by examiner]
US 20170028472A1 · Shaw · 2017 [cited by examiner]
US 20180186081A1 · Milshtein · 2018 [cited by examiner]
US 20180370263A1 · Mauck · 2018 [cited by examiner]
US 20190022940A1 · Hofmann · 2019 [cited by examiner]
US 20190022943A1 · Schödel · 2019 [cited by examiner]
US 20190270250A1 · Sartori · 2019 [cited by examiner]
US 20200114425A1 · Ott · 2020 [cited by examiner]
US 20200156319A1 · Döhler · 2020 [cited by examiner]
US 20210023785A1 · Sosnowski · 2021 [cited by examiner]
US 20210122108A1 · Alejandre Fernandez · 2021 [cited by examiner]
US 20210354391A1 · Echevarria Lopez · 2021 [cited by examiner]
US 20220016832A1 · Tjellesen · 2022 [cited by examiner]
US 20230001635A1 · Garrido · 2023 [cited by examiner]
US 20230182389A1 · Lange · 2023 [cited by examiner]
US 20240367378A1 · Garrido Barrabes · 2024 [cited by examiner]
CN 104353832B · 2015 [cited by applicant]
CN 105642891B · 2016 [cited by applicant]
KR 102024906B · 2019 [cited by applicant]
WO 2004005014A2 · 2004 [cited by applicant]
WO WO2020023032A1 · 2020 [cited by examiner]