IP Library Granted Patent US 12,560,381
Granted Patent B2
US 12,560,381 · App. 17/923,176 · Granted Feb 24, 2026

Installation for the thermal treatment of dispersible raw material, and method for operating such an installation

Inventors: Anna Ivanova Dinkova (Dortmund, DE); Eike Willms (Dortmund, DE); Jost Lemke (Ennigerloh, DE); Karl Lampe (Ennigerloh, DE)
Assignees: thyssenkrupp Polysius GmbH; Vicat SA; Dyckerhoff GmbH
F27B7/42C04B7/434C04B7/4476F27B7/2033F27B7/3205F27B7/36F27D19/00F27D2019/0003F27M2003/03
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,560,381
App. No.
17/923,176
Granted
Feb 24, 2026
Kind
B2
Abstract

An installation for thermal treatment of free-floating raw material, in particular cement raw meal and/or mineral products, may include a riser line through which hot gases can flow. The riser line has at least one fuel inlet for introducing fuel into the riser line. The riser line has at least one raw meal inlet for introducing raw meal into the riser line, which raw meal inlet is arranged upstream of the fuel inlet in a flow direction of gas inside the riser line. Further, a method for thermal treatment of free-floating raw material may involve introducing fuel via a fuel inlet into a riser line for guiding hot gases and introducing raw meal into the riser line. The raw meal is introduced into the riser line upstream of the fuel inlet in the flow direction.

Claims (28)

1 . A method for thermal treatment of free-floating raw material including at least one of cement raw meal or mineral products, the method comprising:

introducing, through a fuel inlet, fuel into a riser line for guiding hot gases;

introducing, through a raw meal inlet, raw meal into the riser line, wherein the raw meal is introduced into the riser line upstream of the fuel inlet in a flow direction of gas; and

introducing, through an inert gas inlet, inert gas into the riser line;

wherein the riser line includes at least two treatment regions that are arranged in succession in the flow direction, wherein each of the at least two treatment regions has a different diameter, wherein the raw meal is introduced into an upstream treatment region of the at least two treatment regions in the flow direction;

wherein each of the two treatment regions includes a section of the riser line including at least one inlet for introducing raw meal, fuel, and/or inert gas;

wherein each of the two treatment regions includes a middle region having a constant diameter, an upstream region arranged upstream of the middle region having an increasing diameter, and a downstream region arranged downstream of the middle region having a decreasing diameter.

2 . The method of claim 1 comprising:

ascertaining a temperature with a temperature measuring unit inside the riser line; and

regulating an amount of at least one of raw meal, inert gas, or fuel in the riser line based on the temperature that is ascertained.

3 . The method of claim 1 wherein the fuel inlet is an upstream fuel inlet, wherein fuel is introduced into the riser line via the upstream fuel inlet and a downstream fuel inlet, with the upstream and downstream fuel inlets being arranged in succession in the flow direction, wherein more fuel is introduced at the upstream fuel inlet than at the downstream fuel inlet.

4 . The method of claim 1 wherein an amount of raw meal that is introduced into the upstream treatment region corresponds to 20% to 60% of a total amount of raw meal introduced into the riser line.

5 . The method of claim 1 wherein the upstream region has an opening angle of 12° to 30°.

6 . The method of claim 1 wherein the riser line has at least one cross-sectional constriction located between the two treatment regions, wherein a diameter of the cross-sectional constriction is smaller than diameters of the two treatment regions.

7 . The method of claim 1 wherein the inert gas is CO2.

8 . The method of claim 1 wherein the inert gas is water vapor.

9 . A method for thermal treatment of free-floating raw material including at least one of cement raw meal or mineral products, the method comprising:

introducing, through a fuel inlet, fuel into a riser line for guiding hot gases;

introducing, through a raw meal inlet, raw meal into the riser line, wherein the raw meal is introduced into the riser line upstream of the fuel inlet in a flow direction of gas; and

introducing, through an inert gas inlet, inert gas into the riser line;

wherein the riser line includes at least two treatment regions that are arranged in succession in the flow direction, wherein each of the at least two treatment regions has a different diameter, wherein the raw meal is introduced into an upstream treatment region of the at least two treatment regions in the flow direction;

wherein the riser line has at least one cross-sectional constriction located between the two treatment regions, wherein a diameter of the cross-sectional constriction is smaller than diameters of the two treatment regions.

10 . The method of claim 9 , further comprising:

ascertaining a temperature with a temperature measuring unit inside the riser line; and

regulating an amount of at least one of raw meal, inert gas, or fuel in the riser line based on the temperature that is ascertained.

11 . The method of claim 9 wherein the fuel inlet is an upstream fuel inlet, wherein fuel is introduced into the riser line via the upstream fuel inlet and a downstream fuel inlet, with the upstream and downstream fuel inlets being arranged in succession in the flow direction, wherein more fuel is introduced at the upstream fuel inlet than at the downstream fuel inlet.

12 . The method of claim 9 wherein the inert gas is CO2.

13 . The method of claim 9 wherein the inert gas is water vapor.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 17, 2025
From: THYSSENKRUPP POLYSIUS GMBH
To: THYSSENKRUPP POLYSIUS GMBH; VICAT SA; DYCKERHOFF GMBH
Reel/Frame 070240/0460 →
CHANGE OF NAME Recorded Nov 5, 2024
From: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG
To: THYSSENKRUPP POLYSIUS GMBH
Reel/Frame 069149/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 3, 2022
From: DINKOVA, ANNA IVANOVA; WILLMS, EIKE; LEMKE, JOST; LAMPE, KARL
To: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG
Reel/Frame 061650/0351 →
Priority Claims (2)
BE 2020/5300 · May 5, 2020 · national
DE 10 2020 205 672.2 · May 5, 2020 · national
Continuity (1)
Related Publication 20230175778A1 · Jun 8, 2023
References Cited (137)
US 2301855A · Cliffe · 1942 [cited by applicant]
US 3162431A · Franz et al. · 1964 [cited by applicant]
US 4248639A · Quittkat · 1981 [cited by applicant]
US 4627877A · Ogawa et al. · 1986 [cited by applicant]
US 4840561A · Unland et al. · 1989 [cited by applicant]
US 4941821A · Durr et al. · 1990 [cited by applicant]
US 5292247A · Bauer · 1994 [cited by applicant]
US 5572938A · Leger · 1996 [cited by applicant]
US 5649823A · Tutt · 1997 [cited by applicant]
US 5919301A · Rother et al. · 1999 [cited by applicant]
US 6012918A · Doumet · 2000 [cited by applicant]
US 6142771A · Doumet · 2000 [cited by applicant]
US 7296994B2 · Meyer et al. · 2007 [cited by applicant]
US 7390357B2 · Skaarup et al. · 2008 [cited by applicant]
US 10457599B2 · Leibinger · 2019 [cited by applicant]
US 20030105381A1 · Eckert et al. · 2003 [cited by applicant]
US 20080090194A1 · Laux et al. · 2008 [cited by applicant]
US 20090130615A1 · Penfornis et al. · 2009 [cited by applicant]
US 20090308073A1 · Bonaquist et al. · 2009 [cited by applicant]
US 20100037804A1 · Paxton et al. · 2010 [cited by applicant]
US 20120174832A1 · Mathai · 2012 [cited by applicant]
US 20120304905A1 · Periasamy et al. · 2012 [cited by applicant]
US 20140069303A1 · Mathai · 2014 [cited by applicant]
US 20140366499A1 · Sakaniwa et al. · 2014 [cited by applicant]
US 20150336845A1 · Lampe et al. · 2015 [cited by applicant]
US 20180127312A1 · Leibinger · 2018 [cited by applicant]
US 20190047911A1 · Schuermann · 2019 [cited by applicant]
US 20190093950A1 · Peltonen · 2019 [cited by applicant]
US 20210198142A1 · Lemke et al. · 2021 [cited by applicant]
US 20210198143A1 · Liu et al. · 2021 [cited by applicant]
US 20210372700A1 · Brinkmann et al. · 2021 [cited by applicant]
CN 201173677Y · 2008 [cited by applicant]
CN 101608866A · 2009 [cited by applicant]
CN 102112834A · 2011 [cited by applicant]
CN 103253879A · 2013 [cited by applicant]
CN 105080315A · 2015 [cited by applicant]
CN 106164011A · 2016 [cited by applicant]
CN 107438747A · 2017 [cited by applicant]
CN 108474618A · 2018 [cited by applicant]
CN 109553310A · 2019 [cited by applicant]
CN 111051802A · 2020 [cited by applicant]
DE 1601124A1 · 1970 [cited by applicant]
DE 2801161A1 · 1979 [cited by applicant]
DE 3037929A1 · 1981 [cited by examiner]
DE 3417148A1 · 1985 [cited by applicant]
DE 3701964A1 · 1988 [cited by applicant]
DE 3800895A1 · 1989 [cited by applicant]
DE 3817357A1 · 1989 [cited by applicant]
DE 3834215A1 · 1990 [cited by applicant]
DE 19649922A1 · 1998 [cited by applicant]
DE 10327028A1 · 2005 [cited by applicant]
DE 60300939T2 · 2006 [cited by applicant]
DE 102008023899A1 · 2009 [cited by applicant]
DE 102009041089A1 · 2011 [cited by applicant]
DE 102013112695A1 · 2014 [cited by applicant]
DE 102013006140A1 · 2014 [cited by applicant]
DE 102013020722A1 · 2015 [cited by applicant]
DE 102015004577B3 · 2015 [cited by applicant]
DE 102017126961A1 · 2019 [cited by applicant]
DE 102018206673A1 · 2019 [cited by applicant]
DE 102020203289A1 · 2021 [cited by applicant]
DE 102020204519A1 · 2021 [cited by applicant]
DE 102020204520A1 · 2021 [cited by applicant]
DE 102020205672A1 · 2021 [cited by applicant]
EP 0455301A2 · 1991 [cited by applicant]
EP 0526770A2 · 1993 [cited by applicant]
EP 1316536A2 · 2003 [cited by applicant]
EP 2086903A2 · 2009 [cited by applicant]
EP 2868635A1 · 2015 [cited by applicant]
EP 2881377A1 · 2015 [cited by applicant]
EP 3029004A1 · 2016 [cited by examiner]
FR 2921059A1 · 2009 [cited by applicant]
JP S55015980A · 1980 [cited by applicant]
JP S55085441A · 1980 [cited by applicant]
JP S55097239A · 1980 [cited by examiner]
JP S59152251A · 1984 [cited by applicant]
JP S60132513U · 1985 [cited by examiner]
JP H11090371A · 1999 [cited by applicant]
JP 2006207924A · 2006 [cited by applicant]
JP 6554910B2 · 2016 [cited by applicant]
WO 9906778A1 · 1999 [cited by applicant]
WO 03074956A1 · 2003 [cited by applicant]
WO 2005024328A2 · 2005 [cited by applicant]
WO 2006113673A2 · 2006 [cited by applicant]
WO 2013024340A1 · 2013 [cited by applicant]
WO 2015077818A1 · 2015 [cited by applicant]
WO 2016038076A1 · 2016 [cited by applicant]
WO WO2017220457A1 · 2017 [cited by examiner]
WO 2019038148A1 · 2019 [cited by applicant]
WO 2019154723A1 · 2019 [cited by applicant]
WO 2019211202A1 · 2019 [cited by applicant]
WO 2021224129A1 · 2021 [cited by applicant]
DE3037929A1 translation (Year: 1981). [cited by examiner]
JP_S55097239_A translation (Year: 1980). [cited by examiner]
JP_S60132513_U translation (Year: 1985). [cited by examiner]
WO-2017220457-A1 translation (Year: 2017). [cited by examiner]
EP_3029004_A1 translation (Year: 2016). [cited by examiner]
CEMCAP, “CO2 capture from cement production”, D8.3 Assessment of calciner test results Revision 1, C.T.G. SPA, 21 pages (2017). [cited by applicant]
English Translation of International Search Report issued in PCT/EP2021/061721, dated Jul. 13, 2021. [cited by applicant]
Peray, The Rotary Cement Kiln, 2nd Edition, Chemical Publishing Co., Inc. (1986). [cited by applicant]
Achternbosch, M. et al., Forschungszentrum Karlsruhe GmbH, Herstellung von Zementklinker, Verfahrensbeschreibung und Analysen zum Einsatz von Sekundärbrennstoffen (2000). [cited by applicant]
Koring, Kristina Dipl.-ling, Schriftenreihe der Zementindustrie Heft 79/2013, CO2-Emissionsminderungspotential und technologische Auswirkungen der Oxyfuel-Technologie im Zementklinkerbrennprozess (2013). [cited by applicant]
Taylor, H.F.W., Cement Chemistry, 2nd edition (1997). [cited by applicant]
Verlag Bau and Technik GmbH, Zement-Taschenbuch, 51. Auflage, Verein Deutscher Zementwerke e.V., Forschungsinstitut der Zementindustrie (2008). [cited by applicant]
Baukal, Jr., Charles E., Industrial Burners Handbook, Industrial Burners Handbook (2003). [cited by applicant]
Tran, H.N. et al., An overview of ring formation in lime kilns, Kraft Pulping, Tappi Journal, pp. 131-136 (1991). [cited by applicant]
Pisaroni, M. et al., Counteracting ring formation in rotary kilns, Journal of Mathematics in Industry, pp. 1-19 (2012). [cited by applicant]
Kawasaki, New Product Introduction, Kawasaki Spouted Bed and Vortex Chamber (DeNOx pre-calciner)—Addressing the global trend of strict environmental regulations, Kawasaki Technical Review, No. 176, p. 59-62 (2016). [cited by applicant]
Markewitz, P., et al., Forschungszentrum Jülich GmbH, Technologiebericht, 2.3 CO2-Abscheidung und-Speicherung (CCS) innerhalb des Forschungsprojekts TF_Energiewende (2017). [cited by applicant]
Burgers, K., et al., Oxyfuel Combustion Conference 3, CO2 Processing Unit for Oxy-Fuel Fired Rotary Cement Kiln (2013). [cited by applicant]
CEMCAP, 23,01, CO2 capture from cement production, 34 pages (2018). [cited by applicant]
Stadler, Konrad, et al., ZKG International (Process Know-how), Modell-prädiktive, Regelung des Calcinators im Holcim Werk Lägerdorf mit dem ABB Expert Optimizer, No. 3, vol. 60 (2007). [cited by applicant]
Integrated Pollution Prevention and Control (IPPC), Reference Document on Best Available Techniques in the Cement and Lime Manufacturing Industries, Cement and Lime Manufacturing Industries, 127 pgs. (Dec. 2001). [cited by applicant]
Pid-Controller, https://web.archive.org/web/20200417150608 /https://en.wikipedia.org/wiki/PID_controller, 26 pgs., Wikipedia (Apr. 17, 2020). [cited by applicant]
Hökfors, Bodil et al., Modelling the cement process and cement clinker quality, Advances in Cement Research, ice Publishing, vol. 26, issue 6, 8 pages (2014). [cited by applicant]
Eriksson, M. et al., Oxyfuel combustion in rotary kiln lime production, Energy Science & Engineering, 13 pgs.(2014). [cited by applicant]
ZKF-Handbuch Zementanlagenbau 2013/2014, Leitfaden für Einsteiger in die Zementindustrie, Heidelberg Cement AG, 76 pgs. (2013). [cited by applicant]
Zeman, Frank et al., The Earth Institute at Columbia University, The Reduced Emission Oxygen Kiln (Jul. 31, 2008). [cited by applicant]
Holpert, Morten, et al., Process Control, True optimisation, 5 pgs. (Jul. 2009). [cited by applicant]
Technologie der Bindebaustoffe, Brennprozess und Brennanlagen, Band 3, VEB Verlag für Bauwesen Berlin, 235 pgs. (1978). [cited by applicant]
European Cement Research Academy GmbH, Carbon Capture Technology—Options and Potentials for the Cement Industry, 96 pgs. (2007). [cited by applicant]
European Cement Research Academy GmbH, ECRA CCS Project—Report on Phase III, 107 pgs. (2012). [cited by applicant]
CEMCAP, Cost of critical components in CO2 capture processes, 35 pgs. (Oct. 20, 2018). [cited by applicant]
CEMCAP, Status Report on Calciner Technology Revision 2, 26 pgs. (May 1, 2015). [cited by applicant]
TR-ECRA (European Cement Research Academy) Technical Reports-128/2016, ECRA Carbon Capture and Storage (CSS) Project Report on Phase IV.A, 44 pages (Dec. 2009). [cited by applicant]
Zhang et al., “Numerical Simulation of Oxy-Fuel Combustion with Different O2/ CO2 Fractions in a Large Cement Precalciner”, Energy Fuels, 34: 4949-4957 (2020). [cited by applicant]
Ditaranto et al., “Study of a full scale oxy-fuel cement rotary kiln”, International Journal of Greenhouse Gas Control, 83: 166-175 (2019). [cited by applicant]
Gerbelová et al., “Feasibility assessment of CO2 capture retrofitted to an existing cement plant: post-combustion vs. oxy-fuel combustion technology”, Energy Procedia, 114: 6141-6149 (2017). [cited by applicant]
IEA Greenhouse Gas R&D Programme (IEA GHG), “CO2 Capture in the Cement Industry”, 2008/3 (Jul. 2008). [cited by applicant]
Carrasco et al., “Experimental investigations of oxyfuel burner for cement production”, Fuel 236: 608-614 (2019.). [cited by applicant]
Hou et al., “Oxy-Fuel Combustion Characteristics of Pulverized Coal under O2/Recirculated Flue Gas Atmospheres”, Appl. Sci., 10:1362 (2020). [cited by applicant]
CEMCAP Report, “CO2 capture from cement production, D 8.1 Status Report on Calciner Technology Revision 2” (2020). [cited by applicant]
Technical Report, TR-ECRA (European Cement Research Academy) 106/2009 ECRA CCS Project—Report about Phase II of the ECRA study, 83 pages (Jun. 22, 2009). [cited by applicant]
Xeller, Von H., “NOx-Minderung durch Einsatz eines Stufenbrenners mit Rauchgasrückführung vom Vorwärmer” (Reducing the formation of NOx by using a step burner with exit gas recycling from the preheater), ZKG Internation… [cited by applicant]
Chatterjee, Anjan Kumar, Cement Production Technology, Principles and Practice, CRC Press, 440 pages (2018). [cited by applicant]
Abschlussbericht, AIF-Vorhaben Nr. 17189 N (Final report IGF Project No. 17189 of the German Association for Combustion Research), 130 pgs. (Mar. 2015). English translation attached. [cited by applicant]
Kwech, L., Stand der Vorcalciniertechnik in der Zementindustrie (Precalcining in the cement industry—in the state of the art), ZKG International, 16 pages (Jul. 7, 1986). English summary included in document. [cited by applicant]