IP Library › Granted Patent US 12,086,515
Granted Patent B2
US 12,086,515 · App. 17/999,291 · Granted Sep 10, 2024

Well planning based on hazard predictive models

Inventors: Valerian Guillot (Montpellier, FR); Florian Karpfinger (Dhahran, SA); Ali Ozbek (Cambridge, GB); Riadh Boualleg (Stonehouse, GB); Ling Li (Stonehouse, GB)
Assignee: Schlumberger Technology Corporation
G06F30/27E21B7/04E21B41/00E21B44/00E21B49/00G06F30/13E21B2200/20E21B2200/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,086,515
App. No.
17/999,291
Granted
Sep 10, 2024
Kind
B2
Abstract

A method to design well trajectories includes determining dogleg severity as a function of inclination, and a corresponding rate of penetration performance of the tool by a hybrid model including physical modelling and machine learning correction. The method includes solving for optimal steering parameters to predict a dogleg severity as close as possible to a desired dogleg severity at a given inclination of the trajectory, which is repeated for dogleg severity and inclination combinations of interest. The rate of penetration for feasible points is also determined and a rate of penetration (or time-to-target) map can be produced. Potential trajectories are then evaluated relative to the map to estimate drilling time-to-target, and an optimal trajectory can be selected that has a lowest time-to-target while also being feasible for the tool and optionally avoiding risks or downhole obstacles.

Claims (28)

1. A method for planning a wellbore, the method comprising:

obtaining geological data corresponding to a geographic area including plurality of offset wellbores;

obtaining drilling operational data from drilling of the plurality of offset wellbores;

identifying hazard events that occurred during drilling of the plurality of offset wellbores, wherein the hazard events include drilling fluid loss events in the plurality of offset wellbores;

correlating the hazard events with geological features in the geological data and with the drilling operational data;

building a hazard predictive model based on the correlating of the hazard events with the geological features and the drilling operational data, wherein the hazard predictive model predicts drilling fluid loss events in the wellbore; and

developing a well plan based on the hazard predictive model.

2. The method of claim 1 , wherein developing the well plan includes determining characteristics of drilling mud for use in drilling the wellbore based on the hazard predictive model.

3. The method of claim 1 , wherein developing the well plan includes selecting a drilling tool or system based on the hazard predictive model.

4. The method of claim 1 , wherein developing the well plan includes changing a trajectory of the wellbore based on the hazard predictive model to avoid a geological feature associated with a predicted fluid loss event.

5. The method of claim 4 , wherein changing the trajectory includes evaluating a time to target for multiple trajectories.

6. The method of claim 5 , wherein changing the trajectory includes selecting a target trajectory having a lowest time to target.

7. The method of claim 4 , wherein changing the trajectory includes separating the trajectory into at least an upper section and a lower section.

8. The method of claim 1 , wherein the geological features include one or more of: a formation; a discrete fracture network; or faults.

9. The method of claim 1 , wherein the drilling operational data includes one or more of: drilling mud properties; drilling mud pressure; drilling system design; weight-on-bit; motor speed; bit diameter; steering system type; or bit type.

10. A wellbore planning system, the wellbore planning system comprising:

a downhole drilling tool;

a processor and memory, the memory including instructions which, when accessed by the processor, cause the processor to:

obtain geological data and drilling operational data for a plurality of offset wellbores;

identify hazard events that occurred during drilling of the plurality of offset wellbores based on the geological data and the drilling operational data for the plurality of offset wellbores, wherein the hazard events include drilling fluid loss events in the plurality of offset wellbores;

correlate the hazard events with geological features in the geological data and with the drilling operational data;

build a hazard predictive model based on the correlating of the hazard events with the geological features and the drilling operational data, wherein the hazard predictive model predicts drilling fluid loss events in the wellbore; and

develop a well plan for the downhole drilling tool based on the hazard predictive model.

11. The wellbore planning system of claim 10 , wherein developing the well plan includes changing a trajectory of the wellbore based on the hazard predictive model to avoid a geological feature associated with a predicted fluid loss event.

12. The wellbore planning system of claim 11 , wherein changing the trajectory includes evaluating a time to target for multiple trajectories.

13. The wellbore planning system of claim 12 , wherein changing the trajectory includes selecting a target trajectory having a lowest time to target.

14. The wellbore planning system of claim 11 , wherein changing the trajectory includes separating the trajectory into at least an upper section and a lower section.

15. The wellbore planning system of claim 10 , wherein the memory further includes instructions which, when accessed by the processor, cause the processor to drill the wellbore with the downhole drilling tool.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2022
From: GUILLOT, VALERIAN; KARPFINGER, FLORIAN; OZBEK, ALI; BOUALLEG, RIADH; LI, LING
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 061847/0923 →
Continuity (3)
Provisional Application 63043970 · Jun 25, 2020
Provisional Application 63027464 · May 20, 2020
Related Publication 20230195952A1 · Jun 22, 2023
Cited By (3)
US 12,467,317 US 12,590,536 US 12,655,689